Production scheduling optimization for parallel machines subject to physical distancing due to COVID-19 pandemic
- 27 April 2022
- journal article
- research article
- Published by Springer Nature in Operations Management Research
- Vol. 15 (1-2) , 503-527
Abstract
This paper, for the first time, presents a production scheduling model for a production line considering physical distancing between the machines' workforces. The production environment is an unrelated parallel-machine, in which for producing each part, different machines with different production rates and the required number of workers are available. We propose a three-objective mixed-integer linear programming mathematical model that aims to maximize the manufacturer's total benefit, parts' safety stock (SS) index, and the workforce's physical distance over a finite horizon (one year) by determining the optimal scheduling of the parts on the machines. Since a large production scheduling problem belongs to the Np-Hard category of problems, a non-dominated sorting genetic algorithm, and a non-dominated ranked GA algorithm are developed to solve the presented model in two stages using the empirical data from a Canadian plastic injection mold company. In the first stage, the LP-metrics approach is utilized for validating the meta-heuristics on a reduced-size problem. In the second stage, the validated meta-heuristics are utilized to optimize the company's yearly production schedule. The results indicate both metaheuristics are performing well in determining the optimal solution. Moreover, implementing physical distancing in the company reduces the company's monthly net benefit by around 9.56% compared to the normal operational conditions (without considering physical distancing).Keywords
Funding Information
- Natural Sciences and Engineering Research Council's
- Canada Research Chairs Program
This publication has 67 references indexed in Scilit:
- Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approachesInternational Journal of Production Research, 2012
- Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problemsComputers & Industrial Engineering, 2010
- Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problemJournal of Intelligent Manufacturing, 2008
- Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithmReliability Engineering & System Safety, 2008
- Parallel machine scheduling with machine availability and eligibility constraintsEuropean Journal of Operational Research, 2008
- Unrelated parallel machine scheduling with setup times using simulated annealingRobotics and Computer-Integrated Manufacturing, 2002
- A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimization: NSGA-II2000
- Multiobjective optimization using evolutionary algorithms — A comparative case study1998
- Parallel machine scheduling with release time and machine eligibility restrictionsComputers & Industrial Engineering, 1997
- Complexity of Machine Scheduling Problems1977