Successful Drilling of a Deviated, Ultra-HTHP Well Using a Micronised Barite Fluid
Authors:
- 17 March 2009
- conference paper
- Published by Society of Petroleum Engineers (SPE)
Abstract
This paper reviews the design and application of a micronised barite fluid (MBF) to drill a deviated high-temperature, high-pressure (HTHP) well in the Northern North Sea. The key technical challenge was to avoid sag of the weight material. On a previous well, using an API-barite-weighted fluid, sag had resulted in considerable non-productive time. The various fluid options were assessed by a technical prequalification exercise which involved extensive testing for viscosity, fluid loss and barite sag under simulated downhole conditions. The MBF was used to drill the 8½-in. section from 6,354 to 7,327 m; the deviation at the 9⅝-in. casing being 42 degrees. The bottomhole static temperature (BHST) was 205°C and maximum mud weight 2.15 sg. The well was successfully drilled to TD, but two stuck-pipe incidents necessitated sidetracks. Despite these operational incidents, no significant sag occurred, and as a result, considerable time savings were achieved on flow checks, trips, and cementing operations and the required logging program could be performed.Keywords
This publication has 5 references indexed in Scilit:
- Successful Development Drilling of an HP/HT Infill Well in a Highly Depleted Reservoir: Case Study2008
- Field Result of Equivalent-Circulating-Density Reduction With a Low-Rheology Fluid2007
- Drilling Fluids in an HP/HT Reservoir: Experiences With Three Different Systems on the Kristin Field Development2006
- Invert Emulsion Fluids for Drilling Through Narrow Hydraulic Windows2004
- Continued Improvements on High-Pressure/High-Temperature Drilling Performance on Wells With Extremely Narrow Drilling Windows - Experiences From Mud Formulation to Operational Practices, Shearwater Project2000