Monitoring and analysis of blasting vibration in tunnel excavation of nuclear power plant
Open Access
- 15 March 2019
- journal article
- Published by JVE International Ltd. in Vibroengineering PROCEDIA
- Vol. 22, 135-139
Abstract
Vibration monitoring of blasting excavation of drainage tunnel in Lufeng Nuclear Power Plant is carried out and the data of blasting vibration is analyzed in this paper. The results show that: (1) The vertical vibration velocity of the rock mass is greater than the horizontal radial and horizontal tangential vibration velocity (2) The blasting vibration velocity of rock mass decreases with distance, which is affected by rock structure and explosive quantity. The monitoring research in this paper has guiding significance for vibration prediction and control in tunnel blasting excavation.Keywords
This publication has 7 references indexed in Scilit:
- Dynamic fragmentation of rock material: Characteristic size, fragment distribution and pulverization lawEngineering Fracture Mechanics, 2018
- Analysis on monitoring and controlling techniques about blasting vibration effect of open channel in Taishan nuclear power stationJournal of Vibroengineering, 2018
- Rock damage control in bedrock blasting excavation for a nuclear power plantInternational Journal of Rock Mechanics and Mining Sciences, 2011
- Experimental studies on the strength of different rock types under dynamic compressionInternational Journal of Rock Mechanics and Mining Sciences, 2004
- Analytical simulation of the dynamic compressive strength of a granite using the sliding crack modelInternational Journal for Numerical and Analytical Methods in Geomechanics, 2001
- Micromechanical modelling of the mechanical properties of a granite under dynamic uniaxial compressive loadsInternational Journal of Rock Mechanics and Mining Sciences, 2000
- Triaxial compression tests on a granite at different strain rates and confining pressuresInternational Journal of Rock Mechanics and Mining Sciences, 1999