Simulation study of rock-breaking performance of TBM cone-shape cutterhead under different tunneling parameters in spiral tunnel
Authors:
Open Access
- 1 October 2025
- journal article
- Published by SAGE Publications in Science Progress
- Vol. 108 (4)
Abstract
Compared with plane cutterhead, the cone-shape cutterhead has better rock-breaking performance with a free surface during the rock-breaking process. Tunneling parameters of cone-shaped cutterhead have great influence on the rock-breaking efficiency and cutterhead thrust. A full-scale excavation model of cone-shape cutterhead was constructed using LS-DYNA to characterize the rock-breaking process accurately and efficiently. The effects of penetration depth and rotation speed on the damage, cutterhead thrust, and rock-breaking efficiency in each area were investigated. The results show that the penetration depth is more sensitive to the field penetration index and thrust fluctuation index than the rotation speed. When the penetration depth and rotation speed is 4 mm/r and 4.5 r/min, respectively, the cone-shape cutterhead performs best with high rock-breaking efficiency and smallest fluctuation of cutterhead thrust under specific geological conditions. It provides suggestions for the selection of tunneling parameters during cone-shape cutterhead construction.Keywords
Funding Information
- the Independent Exploration and Innovation of Graduate Students of Central South University (2023ZZTS0285)
- Natural Science Foundation of Hunan Province (2023JJ40757)
- CAEA Innovation Center for Geological Disposal of High-Level Radioactive Waste Foundation (CXJJ21102203)
- the Postgraduate Scientific Research Innovation Program of Hunan Province (CX20230355)
This publication has 25 references indexed in Scilit:
- Prediction of Engineering Characteristics of Rock Masses Using Actual TBM Performance Data with Supervised and Unsupervised Learning Algorithms (a Case Study in Strong to Very Strong Igneous and Pyroclastic Rocks)Rock Mechanics and Rock Engineering, 2024
- Introduction of a modified QTBM model for predicting TBM penetration rate in rock, based on data from mechanized tunneling projects in IranBulletin of Engineering Geology and the Environment, 2024
- Numerical Study on the Influence of the Width of the SBM Disc Cutter on Rock BreakingKSCE Journal of Civil Engineering, 2023
- Design of tunnel steel arch looping manipulator with multiple actuators in limited spaceScience Progress, 2023
- Numerical investigation of TBM disc cutter cutting on microwave-treated basalt with an unrelieved modelArchives of Civil and Mechanical Engineering, 2022
- Determination of and Experimental Research on the Parameters of the Johnson–Holmquist-II (JH-2) Constitutive Model for GraniteRock Mechanics and Rock Engineering, 2022
- Intelligent assistant driving method for tunnel boring machine based on big dataActa Geotechnica, 2021
- Penetration behaviour of TBM disc cutter assisted by vertical precutting free surfaces at various depths and confining pressuresArchives of Civil and Mechanical Engineering, 2021
- Evaluation of geotechnical parameters affecting the penetration rate of TBM using neural network (case study)Arabian Journal of Geosciences, 2020
- Free-face-Assisted Rock Breaking Method Based on the Multi-stage Tunnel Boring Machine (TBM) CutterheadRock Mechanics and Rock Engineering, 2016