Abstract
As urban populations grow and energy demands escalate, it is increasingly challenging for existing building electrical infrastructure in densely populated areas to meet contemporary energy requirements. Traditional grid expansion methods often impose prohibitive economic costs and environmental impacts. Photovoltaic-battery (PVB) systems emerge as a sustainable alternative to enhance building energy self-sufficiency while addressing transformer capacity constraints. This study develops a multi-objective optimization methodology for PVB system configuration in retrofit applications, introducing the transmission limit ratio (TLR) metric to quantify grid interaction capacity. Taking a residential building as a case study, the constraints on configuration variables under insufficient transformer capacity are obtained through simulation. Applying the NSGA-II algorithm, optimal configurations are identified for economic and environmental scenarios. In terms of configuration, a PVB system, 0.743 PV penetration, 205 kWh battery is the best optimal configuration for an economic operation scenario, while 1.356 PV penetration and 201 kWh battery is the best for an environmental operation scenario, when the TLR is 0.8. The analysis demonstrates PV penetration’s critical role in scenario transition, while battery capacity primarily ensures system stability across TLR variations. This methodology provides practical insights for engineers in optimizing sustainable energy systems within existing infrastructure constraints, particularly relevant for high-density urban environments.
Funding Information
  • National Natural Science Foundation of China (52078356, 2020YFB21003305, IBES2022KF12, ST202313, 2024-Y-002, JK2024-03)
  • National Key Research and Development Program of China (52078356, 2020YFB21003305, IBES2022KF12, ST202313, 2024-Y-002, JK2024-03)
  • Anhui Province Key Laboratory of Intelligent Building and Building Energy-saving (52078356, 2020YFB21003305, IBES2022KF12, ST202313, 2024-Y-002, JK2024-03)
  • Suzhou Municipal Science and Technology Plan Project on Carbon Peak and Carbon Neutrality (52078356, 2020YFB21003305, IBES2022KF12, ST202313, 2024-Y-002, JK2024-03)
  • Fuzhou City Science and Technology Program Project (52078356, 2020YFB21003305, IBES2022KF12, ST202313, 2024-Y-002, JK2024-03)
  • Gansu Provincial Department of Housing and Urban-Rural Development Construction Science and Technology Project (52078356, 2020YFB21003305, IBES2022KF12, ST202313, 2024-Y-002, JK2024-03)

This publication has 56 references indexed in Scilit: