Tool allocation in flexible manufacturing systems with tool alternatives
Authors:
- Can SayginCSCan Saygin
- 1 August 2004
- journal article
- Published by Elsevier in Robotics and Computer-Integrated Manufacturing
- Vol. 20 (4) , 341-349
Abstract
No abstract availableKeywords
This publication has 25 references indexed in Scilit:
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporterInternational Journal of Production Research, 1997
- Increase the efficiency of an FMS by improving the tool scheduling strategiesJournal of Materials Processing Technology, 1996
- A queueing network model for flexible manufacturing systems with tool managementIIE Transactions, 1996
- Tool selection for optimal part production: a Lagrangian relaxation approachIIE Transactions, 1995
- Concurrent part assignment and tool allocation in FMS with material handling considerationsInternational Journal of Production Research, 1993
- A Petri net based approach for analysing tool management issues in FMSInternational Journal of Production Research, 1992
- Heuristic solution to the scheduling problems in flexible manufacturing systemInternational Journal of Production Research, 1991
- Grouping parts and tools in flexible manufacturing systems production planningInternational Journal of Production Research, 1990
- The machine loading and tool allocation problem in a flexible manufacturing systemInternational Journal of Production Research, 1987
- Sequential decision procedures for batching and balancing in FMSsAnnals of Operations Research, 1985