Coordinating two agents in parallel-batching scheduling to minimize the number of late jobs
Authors:
- Renjie YuRYRenjie Yu
- Daniel OronDODaniel Oron
Open Access
- 23 October 2025
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 211
Abstract
No abstract availableThis publication has 21 references indexed in Scilit:
- The integration of shared renewable resources considering setup times for the parallel machine scheduling problemComputers & Industrial Engineering, 2025
- Novel mathematical formulations for parallel-batching processing machine scheduling problemsComputers & Operations Research, 2024
- Non-identical parallel machines batch processing problem with release dates, due dates and variable maintenance activity to minimize total tardinessComputers & Industrial Engineering, 2022
- Hybrid tabu search algorithm for unrelated parallel machine scheduling in semiconductor fabs with setup times, job release, and expired timesComputers & Industrial Engineering, 2022
- Two-Agent Scheduling on a Bounded Parallel-Batching Machine with Makespan and Maximum Lateness ObjectivesJournal of the Operations Research Society of China, 2019
- Two-agent scheduling with deteriorating jobs on a single parallel-batching machine: refining computational complexityJournal of Scheduling, 2019
- Two-agent scheduling on a single parallel-batching machine to minimize the weighted sum of the agents’ makespansJournal of Ambient Intelligence and Humanized Computing, 2018
- An Enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizesComputers & Operations Research, 2017
- Bounded parallel-batching scheduling with two competing agentsJournal of Scheduling, 2012
- Scheduling a batching machineJournal of Scheduling, 1998