Daniel Oron
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Daniel Oron has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Dvir Shabtay
Department of Industrial Engineering and Management, Ben-Gurion University of the Negev, Beer-Sheva, Israel
4 shared publications Gur Mosheiov
4 shared publications- Johnson Phosavanh
Discipline of Business Analytics, The University of Sydney, Sydney, New South Wales 2006, Australia
4 shared publications Renjie Yu
3 shared publicationsGeorge Steiner
2 shared publications- Amir Salehipour
University of Technology Sydney
1 shared publication
Latest Publications
- Open Access
- 10 November 2026
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 224
Energy-constrained single-machine scheduling to minimize the number of late jobs with partial recharge and generalized due dates
- 10 November 2026
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 224
Open AccessEnergy-constrained single-machine scheduling to minimize the number of late jobs with partial recharge and generalized due dates
- Open Access
- 19 May 2026
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 391, 277-293
Minimizing total weighted late work with step-learning on a single machine
- 19 May 2026
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 391, 277-293
Open AccessMinimizing total weighted late work with step-learning on a single machine
- Open Access
- 23 October 2025
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 211
Coordinating two agents in parallel-batching scheduling to minimize the number of late jobs
- 23 October 2025
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 211
Open AccessCoordinating two agents in parallel-batching scheduling to minimize the number of late jobs
- Open Access
- 8 August 2025
- Published by Springer Nature in Journal of Scheduling
- Vol. 29 (3) , 245-260
Single-machine and flow-shop scheduling with supporting tasks in a nested structure
We study scheduling problems subject to supporting precedence, where each job requires a set of preparatory operations, referred to as supporting tasks. Motivated by diverse real-world applications featuring sequential and hierarchical processes, we introduce a nested structure for all supporting tasks. The objective function exclusively accounts for jobs, including total completion time and the weighted and unweighted number of late jobs. By leveraging the optimality properties unique to this structure, we develop efficient polynomial and pseudo-polynomial dynamic programming algorithms to solve single-agent problems in a single-machine setting, including an extension to the case allowing for job rejection. Then we consider two-agent problems with a constrained optimization form. These algorithms are adapted to tackle the additional complexity of the competing interests of two agents. The extension to the proportionate flow-shop problems highlights their inequivalence against counterpart problems in the single-machine setting in the presence of supporting precedence. We show that the problems are significantly more complex than their single-machine counterparts, namely that problems with due-date-based criteria are strongly $$\mathcal{N}\mathcal{P}$$ -hard.- 8 August 2025
- Published by Springer Nature in Journal of Scheduling
- Vol. 29 (3) , 245-260
Open AccessSingle-machine and flow-shop scheduling with supporting tasks in a nested structure
We study scheduling problems subject to supporting precedence, where each job requires a set of preparatory operations, referred to as supporting tasks. Motivated by diverse real-world applications featuring sequential and hierarchical processes, we introduce a nested structure for all supporting tasks. The objective function exclusively accounts for jobs, including total completion time and the weighted and unweighted number of late jobs. By leveraging the optimality properties unique to this structure, we develop efficient polynomial and pseudo-polynomial dynamic programming algorithms to solve single-agent problems in a single-machine setting, including an extension to the case allowing for job rejection. Then we consider two-agent problems with a constrained optimization form. These algorithms are adapted to tackle the additional complexity of the competing interests of two agents. The extension to the proportionate flow-shop problems highlights their inequivalence against counterpart problems in the single-machine setting in the presence of supporting precedence. We show that the problems are significantly more complex than their single-machine counterparts, namely that problems with due-date-based criteria are strongly $$\mathcal{N}\mathcal{P}$$ -hard. - Open Access
- 4 August 2025
- Published by Springer Nature in Journal of Scheduling
- p. 1-21
Single-machine two-agent scheduling with a rate-modifying activity and weighted due-date-related functions
We analyze two-agent scheduling problems with weighted due-date-related scheduling criteria and an optional rate-modifying activity that, when completed, allows jobs to be completed faster. We start with the single-agent problem of minimizing the total weighted late work and then extend the results over to two-agent problems involving combinations of the weighted number of late jobs and the total weighted late work. We examine the properties of optimal schedules and provide efficient pseudo-polynomial time algorithms to solve these problems.
- 4 August 2025
- Published by Springer Nature in Journal of Scheduling
- p. 1-21
Open AccessSingle-machine two-agent scheduling with a rate-modifying activity and weighted due-date-related functions
We analyze two-agent scheduling problems with weighted due-date-related scheduling criteria and an optional rate-modifying activity that, when completed, allows jobs to be completed faster. We start with the single-agent problem of minimizing the total weighted late work and then extend the results over to two-agent problems involving combinations of the weighted number of late jobs and the total weighted late work. We examine the properties of optimal schedules and provide efficient pseudo-polynomial time algorithms to solve these problems.
- Open Access
- 3 February 2025
- Published by Elsevier in European Journal of Operational Research
- Vol. 324 (1) , 40-48
Single-machine scheduling with fixed energy recharging times to minimize the number of late jobs and the number of just-in-time jobs: A parameterized complexity analysis
- 3 February 2025
- Published by Elsevier in European Journal of Operational Research
- Vol. 324 (1) , 40-48
Open AccessSingle-machine scheduling with fixed energy recharging times to minimize the number of late jobs and the number of just-in-time jobs: A parameterized complexity analysis
- Open Access
- 5 October 2024
- Published by Elsevier in European Journal of Operational Research
- Vol. 321 (3) , 734-749
Minimizing the number of late jobs and total late work with step-learning
- 5 October 2024
- Published by Elsevier in European Journal of Operational Research
- Vol. 321 (3) , 734-749
Open AccessMinimizing the number of late jobs and total late work with step-learning
- Open Access
- 2 August 2023
- Published by Elsevier in European Journal of Operational Research
- Vol. 312 (3) , 866-876
Two-agent single-machine scheduling with a rate-modifying activity
- 2 August 2023
- Published by Elsevier in European Journal of Operational Research
- Vol. 312 (3) , 866-876
Open AccessTwo-agent single-machine scheduling with a rate-modifying activity
- Open Access
- 10 July 2023
- Published by Springer Nature in Optimization Letters
- Vol. 18 (4) , 991-1003
Scheduling coupled tasks on parallel identical machines
In many applications in the context of patient appointment scheduling there are recurring tasks with fixed delays between them. These tasks are commonly referred to as coupled-task jobs. In the coupled-task settings, each job consists of two tasks whereby the second task must start processing after an exact time lag following the completion of the first task. In this paper, we introduce the problem of scheduling a set of coupled-task jobs on parallel identical machines with the objective function of minimizing the makespan. We study the computational complexity of the general problem, as well as its special cases. We prove that the majority of these problems are (strongly) NP-hard. Nonetheless, we provide the optimal scheduling policy for two settings consisting of identical jobs. An important result of our work includes showing that the existence of a $$(2-\varepsilon )$$ -approximation algorithm for the problem implies $$P=NP$$ . The latter result improves a recently proposed bound for the open-shop counterpart as well.- 10 July 2023
- Published by Springer Nature in Optimization Letters
- Vol. 18 (4) , 991-1003
Open AccessScheduling coupled tasks on parallel identical machines
In many applications in the context of patient appointment scheduling there are recurring tasks with fixed delays between them. These tasks are commonly referred to as coupled-task jobs. In the coupled-task settings, each job consists of two tasks whereby the second task must start processing after an exact time lag following the completion of the first task. In this paper, we introduce the problem of scheduling a set of coupled-task jobs on parallel identical machines with the objective function of minimizing the makespan. We study the computational complexity of the general problem, as well as its special cases. We prove that the majority of these problems are (strongly) NP-hard. Nonetheless, we provide the optimal scheduling policy for two settings consisting of identical jobs. An important result of our work includes showing that the existence of a $$(2-\varepsilon )$$ -approximation algorithm for the problem implies $$P=NP$$ . The latter result improves a recently proposed bound for the open-shop counterpart as well.