A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
- 1 December 2007
- journal article
- research article
- Published by Taylor & Francis in International Journal of Computer Mathematics
- Vol. 84 (12) , 1731-1741
Abstract
In this paper we address the problem of minimizing the weighted sum of makespan and maximum tardiness in an m-machine flow shop environment. This is a NP-hard problem in the strong sense. An attempt has been made to solve this problem using a metaheuristic called Greedy Randomized Adaptive Search Procedure (GRASP). GRASP is a competitive algorithm and is a meta-heuristic for solving combinatorial optimization problems. We have customized the basic concepts of GRASP algorithm to solve a bicriteria flow shop problem and a new algorithm named B-GRASP (Bicriteria GRASP algorithm) is proposed. The new proposed algorithm is evaluated using benchmark problems taken from Taillard and compared with the existing simulated annealing based heuristic developed by Chakravarthy and Rajendran. Computational experiments indicate that the proposed algorithm is much better than the existing one in all cases.Keywords
This publication has 18 references indexed in Scilit:
- A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobsEuropean Journal of Operational Research, 2005
- The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtimeEuropean Journal of Operational Research, 2003
- Minimizing total flow time in a two-machine flowshop problem with minimum makespanInternational Journal of Production Economics, 2001
- SCHEDULING TO MINIMIZE MEAN TARDINESS AND WEIGHTED MEAN TARDINESS IN FLOWSHOP AND FLOWLINE-BASED MANUFACTURING CELLComputers & Industrial Engineering, 1998
- Minimizing total tardiness in permutation flowshopsEuropean Journal of Operational Research, 1995
- Greedy Randomized Adaptive Search ProceduresJournal of Global Optimization, 1995
- Multiple and bicriteria scheduling: A literature surveyEuropean Journal of Operational Research, 1995
- Heuristics for Flowshop Scheduling Problems Minimizing Mean TardinessJournal of the Operational Research Society, 1993
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954