The multi-product, economic lot-sizing problem in flow shops: the powers-of-two heuristic
Authors:
- Jamal OuennicheJOJamal Ouenniche
- Fayez F. BoctorFBFayez F. Boctor
- 31 October 2001
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 28 (12) , 1165-1182
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processesEuropean Journal of Operational Research, 1994
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage ProductionManagement Science, 1993
- Common cycle scheduling in a multistage production processEngineering Costs and Production Economics, 1990
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing SystemsManagement Science, 1986
- Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A RejoinderManagement Science, 1976
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”Management Science, 1976
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity ModelManagement Science, 1975
- Economic Lot Size Determination in Multi-Stage Assembly SystemsManagement Science, 1973
- Scheduling in a Multistage Production System with Set-up and Inventory CostsA I I E Transactions, 1972
- The Economic Lot Sizes in Multistage Production SystemsA I I E Transactions, 1970