Evaluating construction delays using productivity-based resource reallocation for economic feasibility
Author:
- 1 February 2022
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30 (4) , 1679-1696
Abstract
Purpose: Work crew productivity and the application of limited resources are necessary elements in construction duration delay analysis. This study thus proposes a method to analyze construction delays and resource reallocation based on work crew productivity and resource constraints. The study also presents an economic feasibility analysis that maximizes economic effect by reducing construction duration, the cost of resource reallocation, delay liquidated damages (DLDs) and incentives for reducing contractual duration.Design/methodology/approach: The proposed method involved three steps. First, work crew characteristics such as productivity, unit price and workload helped analyze delay information, including delay duration, reducible duration and daily reduced cost. Next, a goal programming method assessed resource reallocation based on the priority (as determined by decision-makers) of each constraint condition, such as the available number of workers, cost, goal workload and statutory working hours. Lastly, the level of reallocation was analyzed based on the results of the economic feasibility analysis and decision-makers’ delay attitudes.Findings: A case study was performed to test the proposed method's applicability. Its involved sensitivity analysis indicated proposing to decision-makers a scenario based on the prioritization of economic feasibility. The proposed method's applicability proved high for decision-makers, as they can determine whether to reduce construction duration per the proposed data.Originality/value: The proposed method's main contribution is the reallocation of resources to reduce construction duration based on work crew productivity and the prioritization of limited resources. The proposed method can analyze the differences in productivity between the plan and actual progress, as well as calculate the necessary number of workers. Decision-makers can then reduce the appropriate level of contractual duration based on their own delay attitude, constraint condition prioritization and results from daily economic feasibility analyses.Keywords
This publication has 13 references indexed in Scilit:
- Maximizing expected contractor profit using an integrated modelEngineering, Construction and Architectural Management, 2019
- Client and contractor roles in schedule incentive/disincentive projectsEngineering, Construction and Architectural Management, 2019
- A combined goal programming and inverse DEA method for target setting in mergersExpert Systems with Applications, 2019
- Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolutionEngineering, Construction and Architectural Management, 2018
- Resource levelling optimization model considering float loss impactEngineering, Construction and Architectural Management, 2018
- Method to reduce the gap between construction and IT companies to improve suitability before selecting an enterprise systemComputers in Industry, 2017
- Overall multiobjective optimization of construction projects scheduling using particle swarmEngineering, Construction and Architectural Management, 2016
- Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-researchAutomation in Construction, 2015
- Multi-objective genetic optimization for scheduling a multi-storey buildingAutomation in Construction, 2014
- A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilitiesAutomation in Construction, 2013