Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization
- 17 August 2012
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 66 (9-12) , 1563-1572
Abstract
No abstract availableKeywords
This publication has 35 references indexed in Scilit:
- Effective heuristics for the blocking flowshop scheduling problem with makespan minimizationOmega, 2012
- A DE-based approach to no-wait flow-shop schedulingComputers & Industrial Engineering, 2009
- Efficient composite heuristics for total flowtime minimization in permutation flow shops☆Omega, 2009
- A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problemEngineering Optimization, 2008
- On the NEH heuristic for minimizing the makespan in permutation flow shops☆Omega, 2007
- Heuristic algorithm for scheduling in the no-wait flow-shopJournal of Materials Processing Technology, 2000
- No‐wait and separate setup three‐machine flowshop with total completion time criterionInternational Transactions in Operational Research, 2000
- Genetic algorithms applied to the continuous flow shop problemComputers & Industrial Engineering, 1996
- A No-Wait Flowshop Scheduling Heuristic to Minimize MakespanJournal of the Operational Research Society, 1994
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983