USE OF THE PAR(p) MODEL IN THE STOCHASTIC DUAL DYNAMIC PROGRAMMING OPTIMIZATION SCHEME USED IN THE OPERATION PLANNING OF THE BRAZILIAN HYDROPOWER SYSTEM
- 12 December 2005
- journal article
- research article
- Published by Cambridge University Press (CUP) in Probability in the Engineering and Informational Sciences
- Vol. 20 (1) , 143-156
Abstract
In September 2000, the Brazilian system dispatch and spot prices were calculated twice, using different inflow forecasts for that month, as in the last 5 days of August the inflows to the reservoirs in the South and Southeast regions changed 200%. The first run used a smaller forecasted energy inflow and the second used a higher energy inflow. Contrary to expectations, the spot price in the second run, with the higher energy inflow, was higher than the one found in the first run. This paper describes the problem, presents the special features of the PAR(p) model that allow the described behavior, and shows the solution taken to avoid the problem.Keywords
This publication has 3 references indexed in Scilit:
- Optimal stochastic operations scheduling of large hydroelectric systemsInternational Journal of Electrical Power & Energy Systems, 1989
- Stochastic Optimization of a Multireservoir Hydroelectric System: A Decomposition ApproachWater Resources Research, 1985
- Forecasting monthly riverflow time seriesInternational Journal of Forecasting, 1985