Jorge Machado Damázio
Research Interests
Jorge Machado Damázio has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Fernando Augusto Silveira Armani
Universidade Federal do Paraná
1 shared publication - M. E. P. Maceira
CEPEL, Electric Power Research Center, Rio de Janeiro, Brazil
1 shared publication - Nelson Luís Dias
Department of Environmental Engineering, Federal University of Paraná, Curitiba, Brazil
1 shared publication
Latest Publications
- Open Access
- 1 January 2020
- Published by FapUNIFESP (SciELO) in RBRH
- Vol. 25
Eddy-covariance CO2 fluxes over Itaipu lake, southern Brazil
In this work, we present CO2, latent heat and sensible heat fluxes measured over the reservoir of the Itaipu Hydroelectric Power Plant (Paraná State, Brazil) during 2013. A tower was installed at a small island in the reservoir, where an Eddy Covariance system, with supplementary equipments and analysers, was deployed. The objective of this work was to determine the magnitude of CO2 fluxes and their variation throughout the year. CO2 flux displayed seasonality: in warm months there was a predominance of negative CO2 daytime fluxes and positive CO2 nighttime fluxes, which we attributed to photosynthesis/respiration in the reservoir; in cold months there was a predominance of negative CO2 fluxes in both periods, with CO2 air concentration apparently imposing the signal of the CO2 fluxes and the strong winds intensifying them. The range of 90% of the CO2 fluxes measured in this work (−102.68 to +151.72 µg m−2s−1 at the 30-min. time scale) is comparable to those observed in natural lakes and reservoirs around the world. On the average, the reservoir acted as a source of CO2, with an overall mean flux of +12.78 µg m−2s−1.
- 1 January 2020
- Published by FapUNIFESP (SciELO) in RBRH
- Vol. 25
Open AccessEddy-covariance CO2 fluxes over Itaipu lake, southern Brazil
In this work, we present CO2, latent heat and sensible heat fluxes measured over the reservoir of the Itaipu Hydroelectric Power Plant (Paraná State, Brazil) during 2013. A tower was installed at a small island in the reservoir, where an Eddy Covariance system, with supplementary equipments and analysers, was deployed. The objective of this work was to determine the magnitude of CO2 fluxes and their variation throughout the year. CO2 flux displayed seasonality: in warm months there was a predominance of negative CO2 daytime fluxes and positive CO2 nighttime fluxes, which we attributed to photosynthesis/respiration in the reservoir; in cold months there was a predominance of negative CO2 fluxes in both periods, with CO2 air concentration apparently imposing the signal of the CO2 fluxes and the strong winds intensifying them. The range of 90% of the CO2 fluxes measured in this work (−102.68 to +151.72 µg m−2s−1 at the 30-min. time scale) is comparable to those observed in natural lakes and reservoirs around the world. On the average, the reservoir acted as a source of CO2, with an overall mean flux of +12.78 µg m−2s−1.
- 12 December 2005
- Published by Cambridge University Press (CUP) in Probability in the Engineering and Informational Sciences
- Vol. 20 (1) , 143-156
USE OF THE PAR(p) MODEL IN THE STOCHASTIC DUAL DYNAMIC PROGRAMMING OPTIMIZATION SCHEME USED IN THE OPERATION PLANNING OF THE BRAZILIAN HYDROPOWER SYSTEM
In September 2000, the Brazilian system dispatch and spot prices were calculated twice, using different inflow forecasts for that month, as in the last 5 days of August the inflows to the reservoirs in the South and Southeast regions changed 200%. The first run used a smaller forecasted energy inflow and the second used a higher energy inflow. Contrary to expectations, the spot price in the second run, with the higher energy inflow, was higher than the one found in the first run. This paper describes the problem, presents the special features of the PAR(p) model that allow the described behavior, and shows the solution taken to avoid the problem.
- 12 December 2005
- Published by Cambridge University Press (CUP) in Probability in the Engineering and Informational Sciences
- Vol. 20 (1) , 143-156
USE OF THE PAR(p) MODEL IN THE STOCHASTIC DUAL DYNAMIC PROGRAMMING OPTIMIZATION SCHEME USED IN THE OPERATION PLANNING OF THE BRAZILIAN HYDROPOWER SYSTEM
In September 2000, the Brazilian system dispatch and spot prices were calculated twice, using different inflow forecasts for that month, as in the last 5 days of August the inflows to the reservoirs in the South and Southeast regions changed 200%. The first run used a smaller forecasted energy inflow and the second used a higher energy inflow. Contrary to expectations, the spot price in the second run, with the higher energy inflow, was higher than the one found in the first run. This paper describes the problem, presents the special features of the PAR(p) model that allow the described behavior, and shows the solution taken to avoid the problem.