A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
- 1 December 2012
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 140 (2) , 778-781
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Supply planning for single-level assembly system with stochastic component delivery times and service-level constraintInternational Journal of Production Economics, 2008
- On static stochastic order crossoverInternational Journal of Production Economics, 2008
- Supply planning under uncertainties in MRP environments: A state of the artAnnual Reviews in Control, 2007
- Inventory control in a multi-supplier systemInternational Journal of Production Economics, 2006
- Models for production planning under uncertainty: A reviewInternational Journal of Production Economics, 2006
- The MPS parameterization under lead time uncertaintyInternational Journal of Production Economics, 2004
- The detailed coordination problem in a two-level assembly system with stochastic lead timesInternational Journal of Production Economics, 2003
- A model for supply planning under lead time uncertaintyInternational Journal of Production Economics, 2002
- Generalized newsboy model to compute the optimal planned lead times in assembly systemsInternational Journal of Production Research, 2002
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP systemInternational Journal of Production Research, 1997