Mohamed-Aly Louly
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Mohamed-Aly Louly has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Alexandre Dolgui
IMT Atlantique
7 shared publications - Faicel Hnaien
University of Technology of Troyes
2 shared publications - Abdulrahman Al-Ahmari
Department of Industrial Engineering, College of Engineering, King Saud University, Riyadh, Saudi Arabia
1 shared publication - Genrikh Levin
United Institute of Informatics Problems, Belarussian National Academy of Sciences, Minsk, Belarus
1 shared publication - Nikolai Guschinsky1 shared publication
- Sana Belmokhtar1 shared publication
Latest Publications
- 1 December 2012
- Published by Elsevier in International Journal of Production Economics
- Vol. 140 (2) , 778-781
A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
- 1 December 2012
- Published by Elsevier in International Journal of Production Economics
- Vol. 140 (2) , 778-781
A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
- 25 September 2012
- Published by Springer Nature in Journal of Mathematical Modelling and Algorithms in Operations Research
- Vol. 12 (2) , 167-178
A Goal Programming Model for Staff Scheduling at a Telecommunications Center
- 25 September 2012
- Published by Springer Nature in Journal of Mathematical Modelling and Algorithms in Operations Research
- Vol. 12 (2) , 167-178
A Goal Programming Model for Staff Scheduling at a Telecommunications Center
- 2 March 2011
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 23 (6) , 2485-2495
Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
- 2 March 2011
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 23 (6) , 2485-2495
Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
- 1 December 2009
- Published by Elsevier in European Journal of Operational Research
- Vol. 199 (3) , 723-731
Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
- 1 December 2009
- Published by Elsevier in European Journal of Operational Research
- Vol. 199 (3) , 723-731
Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
- 1 January 2009
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 42 (4) , 834-839
Generalized Newsboy model for MRP parameterization under uncertainties
- 1 January 2009
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 42 (4) , 834-839
Generalized Newsboy model for MRP parameterization under uncertainties
- 17 September 2008
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 46 (19) , 5441-5467
Optimal supply planning in MRP environments for assembly systems with random component procurement times
This paper examines supply planning in an MRP environment for assembly systems under lead time uncertainties. Indeed, inventory control in a supply chain is crucial for companies who wish to satisfy their customer demands on time as well as controlling costs. A common approach is to use the MRP techniques. However, these techniques are based on the supposition that lead times are known. In an actual supply chain the lead times are often random variables. Therefore, we develop an efficient exact model to aid in MRP parameterization under lead time uncertainties, more precisely to calculate planned lead times when the component procurement times are random. The aim is to find the values of planned lead times which minimize the sum of the average component holding cost and the average backlogging cost. The developed approach is based on a mathematical model of this problem with discrete decision variables and a branch and bound algorithm.
- 17 September 2008
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 46 (19) , 5441-5467
Optimal supply planning in MRP environments for assembly systems with random component procurement times
This paper examines supply planning in an MRP environment for assembly systems under lead time uncertainties. Indeed, inventory control in a supply chain is crucial for companies who wish to satisfy their customer demands on time as well as controlling costs. A common approach is to use the MRP techniques. However, these techniques are based on the supposition that lead times are known. In an actual supply chain the lead times are often random variables. Therefore, we develop an efficient exact model to aid in MRP parameterization under lead time uncertainties, more precisely to calculate planned lead times when the component procurement times are random. The aim is to find the values of planned lead times which minimize the sum of the average component holding cost and the average backlogging cost. The developed approach is based on a mathematical model of this problem with discrete decision variables and a branch and bound algorithm.
- 3 June 2008
- Published by Springer Nature in Journal of Systems Science and Systems Engineering
- Vol. 17 (2) , 132-155
Planned lead time optimization in material requirement planning environment for multilevel production systems
- 3 June 2008
- Published by Springer Nature in Journal of Systems Science and Systems Engineering
- Vol. 17 (2) , 132-155
Planned lead time optimization in material requirement planning environment for multilevel production systems
- 1 April 2004
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 37 (4) , 45-50
Balancing of Transfer Lines with Simultaneously Activated Spindles
- 1 April 2004
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 37 (4) , 45-50
Balancing of Transfer Lines with Simultaneously Activated Spindles