Probabilistic assessment of switchyard-centered LOOP event frequency and duration in an NPP
- 17 July 2024
- journal article
- research article
- Published by Springer Nature in International Journal of System Assurance Engineering and Management
- Vol. 15 (8) , 4105-4123
Abstract
No abstract availableKeywords
This publication has 44 references indexed in Scilit:
- Reducing the loss of offsite power contribution in the core damage frequency of a VVER-1000 reactor by extending the house load operation periodAnnals of Nuclear Energy, 2018
- Power system reliability evaluation considering cyber-malfunctions in substationsElectric Power Systems Research, 2015
- Alternative off-site power supply improves nuclear power plant safetyAnnals of Nuclear Energy, 2014
- Assessment of Power System Reliability2011
- Application of the integrated safety assessment methodology to the protection of electric systemsReliability Engineering & System Safety, 1996
- A model for the seismic reliability assessment of electric power transmission systemsReliability Engineering & System Safety, 1996
- A new technique for active minimal cut set selection used in substation reliability evaluationMicroelectronics Reliability, 1995
- Substation reliability evaluation: A specific tool for designersReliability Engineering & System Safety, 1994
- Effects of protection systems operation and failures in composite system reliability evaluationInternational Journal of Electrical Power & Energy Systems, 1988
- Reliability Evaluation of Engineering Systems1983