A model and imperialist competitive algorithm for hybrid flow shops with sublots and setup times
Authors:
- B. NaderiBNB. Naderi
- M. YazdaniMYM. Yazdani
- 1 October 2014
- journal article
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 33 (4) , 647-653
Abstract
No abstract availableKeywords
This publication has 25 references indexed in Scilit:
- Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristicsExpert Systems with Applications, 2010
- Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraintsComputers & Industrial Engineering, 2009
- A discrete particle swarm optimization for lot-streaming flowshop scheduling problemEuropean Journal of Operational Research, 2008
- A survey of scheduling problems with setup times or costsEuropean Journal of Operational Research, 2008
- Tabu Search and Simulated Annealing Algorithms for Scheduling in Flow Shops with Lot StreamingProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2007
- A comprehensive review of lot streamingInternational Journal of Production Research, 2005
- Heuristic search algorithms for lot streaming in a two-machine flowshopThe International Journal of Advanced Manufacturing Technology, 2005
- Evaluation of the potential benefits of lot streaming in flow-shop systemsInternational Journal of Production Economics, 2000
- Flow shop scheduling with lot streamingOperations Research Letters, 1989
- A System for Managing Job-Shop ProductionThe Journal of Business, 1966