Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
Authors:
- F. JabbarizadehFJF. Jabbarizadeh
- M. ZandiehMZM. Zandieh
- D. TalebiDTD. Talebi
- 1 October 2009
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 57 (3) , 949-957
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- A survey of scheduling problems with setup times or costsEuropean Journal of Operational Research, 2008
- Sequence-dependent group scheduling problems in flexible flow shopsInternational Journal of Production Economics, 2006
- Scheduling flexible flow lines with sequence-dependent setup timesEuropean Journal of Operational Research, 2004
- Minimizing the makespan for the flow shop scheduling problem with availability constraintsEuropean Journal of Operational Research, 2004
- Comparing scheduling rules for flexible flow linesInternational Journal of Production Economics, 2003
- Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production SchedulingIIE Transactions, 2003
- Two-machine flowshop scheduling with availability constraintsEuropean Journal of Operational Research, 1999
- A review of multi-component maintenance models with economic dependenceMathematical Methods of Operations Research, 1997
- Optimization by Simulated AnnealingScience, 1983
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979