Promoting Green and Sustainability: A Multi-Objective Optimization Method for the Job-Shop Scheduling Problem
Open Access
- 14 November 2018
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 4205
Abstract
As a result of increasingly serious environmental pollution, it is vital to reduce carbon emissions to achieve green and sustainable development for manufacturing processes. Customer satisfaction, as an important factor affecting enterprise profits, is of great importance in the promotion of sustainable development. Because an accurate delivery time and high delivery rate improve customer satisfaction and enhance an enterprise’s competitive advantage in the market, this paper proposes a new optimization method for achieving low carbon emissions, a high delivery rate, and a low cost for a job-shop scheduling problem. The computational results show the negative correlation between assembly cost and carbon emissions, and the positive correlation between assembly cost and delivery time by Pareto optimization. The proposed method, which takes into consideration carbon emissions, greatly supports the objective of achieving a green and sustainable development.Keywords
Funding Information
- National Natural Science Foundation of China (71301176)
- Doctoral Program of Higher Education China (20130191120001)
This publication has 30 references indexed in Scilit:
- A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraintsJournal of Intelligent Manufacturing, 2014
- Approximate trade-off between minimisation of total weighted tardiness and minimisation of carbon dioxide (CO2) emissions in bi-criteria batch scheduling problemInternational Journal of Computer Integrated Manufacturing, 2013
- Coordinated scheduling of production and delivery with production window and delivery capacity constraintsTheoretical Computer Science, 2012
- Advanced Cost-Efficient Production Scheduling in Hi-Tech Manufacturing Industry at Test OperationApplied Mechanics and Materials, 2011
- Why and how to adopt green management into business organizations?Management Decision, 2009
- Multi-objective production scheduling: a surveyThe International Journal of Advanced Manufacturing Technology, 2008
- Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdownsThe International Journal of Advanced Manufacturing Technology, 2008
- Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure processNaval Research Logistics (NRL), 2007
- Single machine scheduling with multiple objectives in semiconductor manufacturingThe International Journal of Advanced Manufacturing Technology, 2004
- Real-time GA-based rescheduling approach for the pre-sewing stage of an apparel manufacturing processThe International Journal of Advanced Manufacturing Technology, 2004