Modelling phased railway infrastructure upgrades deployment with a case study to ERTMS roll-out
Open Access
- 17 October 2026
- journal article
- Published by Elsevier in Transportation Research Part B: Methodological
- Vol. 215
Abstract
No abstract availableThis publication has 14 references indexed in Scilit:
- A MILP model for quasi-periodic strategic train timetablingOmega, 2022
- Telecommunications network design: Technology impacts and future directionsNetworks, 2020
- Determination of infrastructure capacity in railway networks without the need for a fixed timetableTransportation Research Part C: Emerging Technologies, 2020
- Variable Neighborhood Search for Integrated Timetable Based Design of Railway InfrastructureElectronic Notes in Discrete Mathematics, 2015
- A review of urban transportation network design problemsEuropean Journal of Operational Research, 2013
- Transport Network Design Problem under Uncertainty: A Review and New DevelopmentsTransport Reviews, 2011
- Integral cycle bases for cyclic timetablingDiscrete Optimization, 2009
- Railway network design with multiple project stages and time sequencingJournal of Geographical Systems, 2001
- Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracksEuropean Journal of Operational Research, 1997
- A Mathematical Model for Periodic Scheduling ProblemsSIAM Journal on Discrete Mathematics, 1989