Dennis Huisman
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Dennis Huisman has a total of 33 co-authors. Here are the top co-authors by number of shared publications:
- Twan Dollevoet
Econometric Institute and Erasmus Center for Optimization in Public Transport, Erasmus University Rotterdam, 3062 PA Rotterdam, Netherlands
8 shared publications - Bart van Rossum
Operations, Planning Accounting & Control Eindhoven University of Technology The Netherlands
5 shared publications - Leo G. Kroon
Erasmus University Rotterdam
2 shared publications - Pedro José Correia Duarte2 shared publications
- Thomas Breugem
Tilburg Univ, Sch Econ & Management, Tilburg, Netherlands
2 shared publications - Albert P. M. Wagelmans
Erasmus University Rotterdam
1 shared publication
Latest Publications
- Open Access
- 17 October 2026
- Published by Elsevier in Transportation Research Part B: Methodological
- Vol. 215
Modelling phased railway infrastructure upgrades deployment with a case study to ERTMS roll-out
- 17 October 2026
- Published by Elsevier in Transportation Research Part B: Methodological
- Vol. 215
Open AccessModelling phased railway infrastructure upgrades deployment with a case study to ERTMS roll-out
- Open Access
- 20 April 2026
- Published by Elsevier in Journal of Rail Transport Planning & Management
- Vol. 38
Simulating a new crew planning process at Netherlands Railways
- 20 April 2026
- Published by Elsevier in Journal of Rail Transport Planning & Management
- Vol. 38
Open AccessSimulating a new crew planning process at Netherlands Railways
- 1 November 2025
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Transportation Science
- Vol. 59 (6) , 1283-1302
Benders Decomposition for Robust Tactical Railway Crew Scheduling
We consider robust tactical crew scheduling for a large passenger railway operator that aims to inform crew early on about their work schedules while also maintaining the ability to respond to changes in the daily timetables. To resolve this conflict, the operator considers a template-based planning process, templates being time windows during which duties can later be scheduled. The goal is to select a cost-efficient set of templates that is robust with respect to uncertainty in the work to be performed in the operational phase. A set of templates is deemed robust when few excess duties are required to cover all work in the operational planning phase. To enable the construction of efficient template-based rosters, we impose several template rostering constraints that proxy the actual rostering rules of later planning steps. We propose a two-phase accelerated Benders decomposition algorithm that can incorporate these restrictions. Computational experiments on real-life instances from Netherlands Railways featuring up to 948 tasks per day show that historical planning information can be used to obtain robust templates and that sparse solutions can be obtained at negligible extra costs. Compared with a literature benchmark, our Benders decomposition method solves three times as many instances without rostering constraints to optimality.
- 1 November 2025
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Transportation Science
- Vol. 59 (6) , 1283-1302
Benders Decomposition for Robust Tactical Railway Crew Scheduling
We consider robust tactical crew scheduling for a large passenger railway operator that aims to inform crew early on about their work schedules while also maintaining the ability to respond to changes in the daily timetables. To resolve this conflict, the operator considers a template-based planning process, templates being time windows during which duties can later be scheduled. The goal is to select a cost-efficient set of templates that is robust with respect to uncertainty in the work to be performed in the operational phase. A set of templates is deemed robust when few excess duties are required to cover all work in the operational planning phase. To enable the construction of efficient template-based rosters, we impose several template rostering constraints that proxy the actual rostering rules of later planning steps. We propose a two-phase accelerated Benders decomposition algorithm that can incorporate these restrictions. Computational experiments on real-life instances from Netherlands Railways featuring up to 948 tasks per day show that historical planning information can be used to obtain robust templates and that sparse solutions can be obtained at negligible extra costs. Compared with a literature benchmark, our Benders decomposition method solves three times as many instances without rostering constraints to optimality.
- Open Access
- 3 March 2025
- Published by Elsevier in EURO Journal on Transportation and Logistics
- Vol. 14
50 years of OR in railway timetabling and rolling stock planning
- 3 March 2025
- Published by Elsevier in EURO Journal on Transportation and Logistics
- Vol. 14
Open Access50 years of OR in railway timetabling and rolling stock planning
- 29 December 2024
- Published by Springer Nature
- p. 297-323
Column Generation and Lagrangian Relaxation: Solving Real-World Crew (Re)Scheduling Problems
- 29 December 2024
- Published by Springer Nature
- p. 297-323
Column Generation and Lagrangian Relaxation: Solving Real-World Crew (Re)Scheduling Problems
- 10 November 2024
- Published by Elsevier in Journal of Rail Transport Planning & Management
- Vol. 32
A decomposition approach to solve the individual railway crew Re-planning problem
- 10 November 2024
- Published by Elsevier in Journal of Rail Transport Planning & Management
- Vol. 32
A decomposition approach to solve the individual railway crew Re-planning problem
- Open Access
Benders Decomposition for Robust Tactical Railway Crew Scheduling
We consider robust tactical crew scheduling for a large passenger railway operator, who aims to inform crew early on about their work schedules while also maintaining the ability to respond to changes in the daily timetables. To resolve this conflict, the operator considers a template-based planning process, templates being time windows during which duties can later be scheduled. The goal is to select a cost-efficient set of templates that is robust with respect to uncertainty in the work to be performed in the operational phase. A set of templates is deemed robust when few excess duties are required to cover all work in the operational planning phase. To enable the construction of efficient template-based rosters, we impose several template rostering constraints that proxy the actual rostering rules of later planning steps. We propose a two-phase accelerated Benders decomposition algorithm that can incorporate these restrictions. Computational experiments on real-life instances from Netherlands Railways, featuring up to 948 tasks per day, show that historical planning information can be used to obtain robust templates and that parsimonious solutions can be obtained at negligible extra costs. Compared to a literature benchmark, our Benders decomposition method solves three times as many instances without rostering constraints to optimality.
Open AccessBenders Decomposition for Robust Tactical Railway Crew Scheduling
We consider robust tactical crew scheduling for a large passenger railway operator, who aims to inform crew early on about their work schedules while also maintaining the ability to respond to changes in the daily timetables. To resolve this conflict, the operator considers a template-based planning process, templates being time windows during which duties can later be scheduled. The goal is to select a cost-efficient set of templates that is robust with respect to uncertainty in the work to be performed in the operational phase. A set of templates is deemed robust when few excess duties are required to cover all work in the operational planning phase. To enable the construction of efficient template-based rosters, we impose several template rostering constraints that proxy the actual rostering rules of later planning steps. We propose a two-phase accelerated Benders decomposition algorithm that can incorporate these restrictions. Computational experiments on real-life instances from Netherlands Railways, featuring up to 948 tasks per day, show that historical planning information can be used to obtain robust templates and that parsimonious solutions can be obtained at negligible extra costs. Compared to a literature benchmark, our Benders decomposition method solves three times as many instances without rostering constraints to optimality.
- Open Access
- 6 July 2024
- Published by Springer Nature in Operations Research Forum
- Vol. 5 (3) , 1-6
Operations Research at Netherlands Railways
- 6 July 2024
- Published by Springer Nature in Operations Research Forum
- Vol. 5 (3) , 1-6
Open AccessOperations Research at Netherlands Railways
- Open Access
- 29 April 2024
- Published by Elsevier in European Journal of Operational Research
- Vol. 318 (1) , 55-70
Railway crew planning with fairness over time
- 29 April 2024
- Published by Elsevier in European Journal of Operational Research
- Vol. 318 (1) , 55-70
Open AccessRailway crew planning with fairness over time