Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
Authors:
- K.H. EckerKEK.H. Ecker
- J.N.D. GuptaJGJ.N.D. Gupta
- 1 August 2005
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 164 (3) , 627-638
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Scheduling of resource tasksEuropean Journal of Operational Research, 1999
- Heuristics for minimizing tool switches when scheduling part types on a flexible machineIIE Transactions, 1998
- Tool handling and scheduling in a two-machine flexible manufacturing cellIIE Transactions, 1996
- Minimizing the number of tool switches on a flexible machineInternational Journal of Flexible Manufacturing Systems, 1994
- Classification and review of FMS scheduling proceduresProduction Planning & Control, 1994
- The cutting path and tool selection problem in computer aided process planningJournal of Manufacturing Systems, 1989
- A Heuristic for Minimizing the Number of Tool Switches on a Flexible MachineIIE Transactions, 1988
- New trends in machine schedulingEuropean Journal of Operational Research, 1988
- The shortest common supersequence problem over binary alphabet is NP-completeTheoretical Computer Science, 1981
- The Complexity of Some Problems on Subsequences and SupersequencesJournal of the ACM, 1978