A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management
- 4 September 2024
- journal article
- research article
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 25 (10) , 1141-1153
Abstract
No abstract availableKeywords
Funding Information
- Vietnam National University HoChiMinh City (B2024-20-05)
- University of Technology (HCMUT), VNU-HCM
This publication has 61 references indexed in Scilit:
- Optimizing construction time, cost, and quality: a hybrid AHP-NSGA-II optimization modelAsian Journal of Civil Engineering, 2024
- Comparative performance of the NSGA-II and MOPSO algorithms and simulations for evaluating time–cost–quality–risk trade-off in multi-modal PERT networksSoft Computing, 2023
- Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithmAlexandria Engineering Journal, 2022
- Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction ProjectsInternational Journal of Civil Engineering, 2021
- Cost estimation and prediction in construction projects: a systematic review on machine learning techniquesSN Applied Sciences, 2020
- Multi-objective self-adaptive differential evolution with elitist archive and crowding entropy-based diversity measureSoft Computing, 2009
- Physical Principles of Electron Microscopy2005
- Project time–cost analysis under generalised precedence relationsAdvances in Engineering Software, 2004
- Project management with time, cost, and quality considerationsEuropean Journal of Operational Research, 1996
- A Mathematical Theory of CommunicationBell System Technical Journal, 1948