Nghia Hoai Nguyen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nghia Hoai Nguyen has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
- Angeli Doliente Cabaltica
International University
2 shared publications Duc-Hoc Tran
Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT)
2 shared publicationsHung Tran Phi
Ho Chi Minh City Open University
2 shared publicationsKhanh-Nhan Tran
Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT)
2 shared publicationsThanwadee Chinda
School of Management Technology, Sirindhorn International Institute of Technology, Thammasat University
2 shared publications- Tran Thanh Ha
International University
2 shared publications
Latest Publications
- Open Access
- 14 July 2026
- Published by Elsevier in SSRN Electronic Journal
Sparse Viewpoint Generation and Path Planning for UAV-Based Window-to-Wall Interface Inspection on Building Façades
UAV-based façade inspection typically relies on holistic surface coverage, capturing redundant imagery and generating inefficient flight paths when defects are localized at window-to-wall interfaces (WWIs). This study proposes a semantic-based UAV path-planning framework for autonomous WWI inspection. A Building Information Modeling (BIM)-derived knowledge graph is constructed to link façade geometry, inspection viewpoints, and defect records, enabling lifecycle traceability. To minimize image capture, each WWI is modeled as an annular boundary region and discretized into inspection cells. A greedy set-cover algorithm selects a compact viewpoint set for complete boundary coverage, which is sequenced into a collision-free route using a story-aware genetic algorithm. Furthermore, a provenance-driven mechanism enables targeted, closed-loop re-inspection of unresolved defects. Validation on a multi-story building across six UAV configurations demonstrated reductions of up to 89.8% in viewpoint count and 75.5% in flight distance compared to traditional baselines, significantly improving inspection efficiency.
- 14 July 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessSparse Viewpoint Generation and Path Planning for UAV-Based Window-to-Wall Interface Inspection on Building Façades
UAV-based façade inspection typically relies on holistic surface coverage, capturing redundant imagery and generating inefficient flight paths when defects are localized at window-to-wall interfaces (WWIs). This study proposes a semantic-based UAV path-planning framework for autonomous WWI inspection. A Building Information Modeling (BIM)-derived knowledge graph is constructed to link façade geometry, inspection viewpoints, and defect records, enabling lifecycle traceability. To minimize image capture, each WWI is modeled as an annular boundary region and discretized into inspection cells. A greedy set-cover algorithm selects a compact viewpoint set for complete boundary coverage, which is sequenced into a collision-free route using a story-aware genetic algorithm. Furthermore, a provenance-driven mechanism enables targeted, closed-loop re-inspection of unresolved defects. Validation on a multi-story building across six UAV configurations demonstrated reductions of up to 89.8% in viewpoint count and 75.5% in flight distance compared to traditional baselines, significantly improving inspection efficiency.
- 27 January 2026
- Published by Springer Nature in Innovative Infrastructure Solutions
- Vol. 11 (2) , 102
Enhancing road infrastructure management efficiency using Yolov8 model for pavement damage detection
- 27 January 2026
- Published by Springer Nature in Innovative Infrastructure Solutions
- Vol. 11 (2) , 102
Enhancing road infrastructure management efficiency using Yolov8 model for pavement damage detection
- 20 November 2025
- Published by Springer Nature
- p. 267-273
Predicting Labor Cost Performance Index in Construction Projects Using Explainable AI
- 20 November 2025
- Published by Springer Nature
- p. 267-273
Predicting Labor Cost Performance Index in Construction Projects Using Explainable AI
- 20 November 2025
- Published by Springer Nature
- p. 287-294
Seasonal Cash Inflow Optimization in Construction Projects Using the Termite Life Cycle Optimizer
- 20 November 2025
- Published by Springer Nature
- p. 287-294
Seasonal Cash Inflow Optimization in Construction Projects Using the Termite Life Cycle Optimizer
- 20 November 2025
- Published by Springer Nature
- p. 201-207
An Advanced Metaheuristic Framework for Time–Cost–Quality Optimization in Complex Construction Projects
- 20 November 2025
- Published by Springer Nature
- p. 201-207
An Advanced Metaheuristic Framework for Time–Cost–Quality Optimization in Complex Construction Projects
- 20 November 2025
- Published by Springer Nature
- p. 569-577
Investigating Sustainable Criteria for Site Selection of Construction WasteWater Treatment Plant: A Case Study in Ho Chi Minh City
- 20 November 2025
- Published by Springer Nature
- p. 569-577
Investigating Sustainable Criteria for Site Selection of Construction WasteWater Treatment Plant: A Case Study in Ho Chi Minh City
- 14 October 2025
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 26 (9) , 1960-1977
Knowledge management process to enhance construction competitiveness in the long term: system dynamics modelling approach
- 14 October 2025
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 26 (9) , 1960-1977
Knowledge management process to enhance construction competitiveness in the long term: system dynamics modelling approach
- 23 September 2025
- Published by Taylor & Francis in Sustainable and Resilient Infrastructure
- Vol. 11 (4) , 1-26
Developing software to assess the quality of urban traffic infrastructure using real-time data from the bus route network
- 23 September 2025
- Published by Taylor & Francis in Sustainable and Resilient Infrastructure
- Vol. 11 (4) , 1-26
Developing software to assess the quality of urban traffic infrastructure using real-time data from the bus route network
- 12 August 2025
- Published by Emerald Publishing in Smart and Sustainable Built Environment
- p. 1-29
Sustainable assessment factors for construction site selection of semi-automatic parking systems
Purpose: Global population growth and rising automobile ownership have led to an increased demand for parking spaces, particularly in urban centers. Many cities worldwide have adopted semi-automatic parking systems (SAPS) because of their numerous advantages, such as rapid construction, compact design and space efficiency. However, selecting optimal sites for SAPS remains a significant challenge for local authorities and transportation planners, particularly in Vietnam, where SAPS’s specifications align well with local needs and features. This study aims to identify the critical sustainable criteria influencing the location selection of SAPS. Design/methodology/approach: A comprehensive list of potential factors, including four dimensions: society, environment, economy and technology, was established. A set of 18 factors affecting the site selection of SAPS was identified based on the relative importance index, which was rated using an expert survey. The weights of the identified factors were then computed using the fuzzy analytical hierarchy process (FAHP) technique. Findings: The findings of this research provide a comprehensive framework comprising four main factors and eighteen sub-factors, aimed at guiding local authorities and private enterprises in selecting the optimal site for SAPS, thereby enhancing operational efficiency and promoting urban sustainability. Originality/value: Develop a set of sustainable criteria to aid decision makers in selecting the appropriate location for SAPS during the feasibility study stage prior to construction.
- 12 August 2025
- Published by Emerald Publishing in Smart and Sustainable Built Environment
- p. 1-29
Sustainable assessment factors for construction site selection of semi-automatic parking systems
Purpose: Global population growth and rising automobile ownership have led to an increased demand for parking spaces, particularly in urban centers. Many cities worldwide have adopted semi-automatic parking systems (SAPS) because of their numerous advantages, such as rapid construction, compact design and space efficiency. However, selecting optimal sites for SAPS remains a significant challenge for local authorities and transportation planners, particularly in Vietnam, where SAPS’s specifications align well with local needs and features. This study aims to identify the critical sustainable criteria influencing the location selection of SAPS. Design/methodology/approach: A comprehensive list of potential factors, including four dimensions: society, environment, economy and technology, was established. A set of 18 factors affecting the site selection of SAPS was identified based on the relative importance index, which was rated using an expert survey. The weights of the identified factors were then computed using the fuzzy analytical hierarchy process (FAHP) technique. Findings: The findings of this research provide a comprehensive framework comprising four main factors and eighteen sub-factors, aimed at guiding local authorities and private enterprises in selecting the optimal site for SAPS, thereby enhancing operational efficiency and promoting urban sustainability. Originality/value: Develop a set of sustainable criteria to aid decision makers in selecting the appropriate location for SAPS during the feasibility study stage prior to construction.
- 4 September 2024
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 25 (10) , 1141-1153
A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management
- 4 September 2024
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 25 (10) , 1141-1153
A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management