Abstract
Research Center for Chemistry-Indonesian Institute of Sciences (RCChem-LIPI) has organized proficiency testing (PT) schemes for testing laboratories in Indonesia and some other countries. Since 2013, the test results together with their estimation of measurement uncertainties were collected from the participants. Z-score was used to evaluate the performance of participants and the reported measurement uncertainties were used for information purposes only. A little information is available for the competence development in the estimation of measurement uncertainties in developing countries, especially in Indonesia. In addition, through the reported estimation of uncertainties in the PT schemes, they might be over-or underestimated. This paper is aimed to study the estimated measurement uncertainty reported by the participants in Indonesian PT schemes to get a possibility of including the estimation of uncertainty in the future assessment. The participants were requested to perform analysis of the test samples by using their routine methods and report the test results, including their estimation of uncertainties in provided result report form. Performance scores were calculated by zeta-score and were then compared with z-score from the real PT schemes. The relationship between the reported measurement uncertainty with the accreditation status, instrument employed and analytical method selected by the laboratories were observed. From this study, it was found that the reported uncertainties were varied greatly although some participants used the same analytical instrument or analytical method. The over-and underestimated uncertainties reported by some laboratories in comparison with the correlated σpt had affected the zeta-score.

This publication has 20 references indexed in Scilit: