Geometallurgy-oriented mine scheduling considering volume support and non-additivity
- 1 March 2022
- journal article
- research article
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 131 (1) , 1-11
Abstract
In mine planning, metallurgical recovery is traditionally estimated in each block as a fixed value or a function of the block's primary geological attributes. Nevertheless, this variable has two characteristics that are often neglected. First, it is non-additive, which means that estimation and scaling procedures of such properties cannot be done based on linear techniques. Second, it is a process response variable, which means this variable value represents the response of the volume processed at the plant. The combination of these two properties results that the metallurgical recovery of each block is dependent on the blocks that will be mined and processed together with it at the plant. This paper demonstrates the difference between how metallurgical recovery is traditionally considered in mine planning, and how it should be. There are impacts on mine scheduling/blending, global metallurgical recovery estimation (total quantity of metal recovered) and total economic value.Keywords
This publication has 13 references indexed in Scilit:
- Application of simultaneous stochastic optimization with geometallurgical decisions at a copper–gold mining complexMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2019
- Geometallurgy—A Route to More Resilient Mine OperationsMinerals, 2018
- Incorporation of geometallurgical modelling into long-term production planningMinerals Engineering, 2018
- Real-time reconciliation of a geometallurgical model based on ball mill performance measurements – a pilot study at the Tropicana gold mineMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2018
- The optimisation of block caving production scheduling with geometallurgical uncertainty – a multi-objective approachMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2018
- A multivariate destination policy for geometallurgical variables in mineral value chains using coalition-formation clusteringResources Policy, 2016
- Mine/Mill production planning based on a Geometallurgical ModelRem: Revista Escola de Minas, 2016
- Strategic mine planning and design: some challenges and strategies for addressing themMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2016
- Mineral Resource Estimation2014
- Choosing Between Two Kind of Sampling Patterns Using Geostatistical Simulation: Regularly Spaced or at High Uncertainty Locations?Natural Resources Research, 2011