Pedro Henrique Alves Campos
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Pedro Henrique Alves Campos has a total of 33 co-authors. Here are the top co-authors by number of shared publications:
- Pedro Benedito Casagrande
Departamento de Engenharia de Minas (DEMIN), Universidade Federal de Minas Gerais (UFMG), Belo Horizonte 31270-901, MG, Brazil
4 shared publications - Douglas Batista Mazzinghy
Graduate Program in Metallurgical, Materials and Mining Engineering (PPGEM), Universidade Federal de Minas Gerais (UFMG), Belo Horizonte 31270-901, MG, Brazil
3 shared publications Pedro Benedito Casagrande
Universidade Federal de Minas Gerais
3 shared publicationsViviane da Silva Borges Barbosa
Universidade Federal de Minas Gerais
3 shared publications- Anna Luiza Madureira Batista
Graduate Program in Metallurgical, Materials and Mining Engineering (PPGEM), Universidade Federal de Minas Gerais (UFMG), Belo Horizonte 31270-901, MG, Brazil
2 shared publications Gilberto Rodrigues da Silva
Universidade Federal de Minas Gerais
2 shared publications
Latest Publications
- Open Access
Integrating Geometallurgical Variables into Mine Planning Using Block Economic Value and Processing Time Constraints: A Case Study of a Copper Deposit
Geometallurgy provides a framework for incorporating the spatial variability of ore processing responses into mine planning, although its practical implementation in operating mines remains limited due to the scarcity of dedicated metallurgical datasets. This study presents a case study using real operational data from the Salobo copper–gold mine and aims to evaluate how geometallurgical variables can be integrated into long-term mine planning using a limited geometallurgical dataset. Predictive models for Cu metallurgical recovery, Cu concentrate grade, and specific energy were developed from drillhole samples originally collected for resource evaluation. These models were incorporated into a Direct Block Scheduling framework through the formulation of block economic values, enabling the representation of processing-related variability within mine planning decisions. Two planning scenarios were evaluated: the Geomet scenario, which incorporates geometallurgical variables into block economic value without explicit operational time restrictions, and the Geomet_Constraints scenario, which additionally includes an explicit annual processing time constraint based on plant capacity. Although the predictive models exhibited low-to-moderate predictive performance (R2 = 0.45–0.60), their predictions were incorporated into the block model to represent the estimated spatial variability of processing responses. The results show that the Geomet_Constraints scenario generates operationally feasible schedules that comply with plant processing capacity and reduce overall material movement and stockpiling. In contrast, the Geomet scenario results in higher material movement and processing requirements exceeding plant capacity. From an economic perspective, the Geomet_Constraints scenario achieves a slightly higher cumulative NPV (approximately +2.8%), although this difference should be interpreted in the context of the predictive performance of the geometallurgical models. Overall, this case study illustrates how geometallurgical information can be incorporated into a long-term mine planning framework using a limited real-world dataset, and that the inclusion of processing time constraints plays a key role in improving the operational feasibility and economic performance of long-term production schedules.
Open AccessIntegrating Geometallurgical Variables into Mine Planning Using Block Economic Value and Processing Time Constraints: A Case Study of a Copper Deposit
Geometallurgy provides a framework for incorporating the spatial variability of ore processing responses into mine planning, although its practical implementation in operating mines remains limited due to the scarcity of dedicated metallurgical datasets. This study presents a case study using real operational data from the Salobo copper–gold mine and aims to evaluate how geometallurgical variables can be integrated into long-term mine planning using a limited geometallurgical dataset. Predictive models for Cu metallurgical recovery, Cu concentrate grade, and specific energy were developed from drillhole samples originally collected for resource evaluation. These models were incorporated into a Direct Block Scheduling framework through the formulation of block economic values, enabling the representation of processing-related variability within mine planning decisions. Two planning scenarios were evaluated: the Geomet scenario, which incorporates geometallurgical variables into block economic value without explicit operational time restrictions, and the Geomet_Constraints scenario, which additionally includes an explicit annual processing time constraint based on plant capacity. Although the predictive models exhibited low-to-moderate predictive performance (R2 = 0.45–0.60), their predictions were incorporated into the block model to represent the estimated spatial variability of processing responses. The results show that the Geomet_Constraints scenario generates operationally feasible schedules that comply with plant processing capacity and reduce overall material movement and stockpiling. In contrast, the Geomet scenario results in higher material movement and processing requirements exceeding plant capacity. From an economic perspective, the Geomet_Constraints scenario achieves a slightly higher cumulative NPV (approximately +2.8%), although this difference should be interpreted in the context of the predictive performance of the geometallurgical models. Overall, this case study illustrates how geometallurgical information can be incorporated into a long-term mine planning framework using a limited real-world dataset, and that the inclusion of processing time constraints plays a key role in improving the operational feasibility and economic performance of long-term production schedules.
- Open Access
Geometallurgical Characterization of the Main Mining Fronts of a Zinc and Lead Mine Operation
Geometallurgy is an approach that utilizes predictive models that can support business decisions, mitigate risks, and enhance production efficiency. To develop an accurate geometallurgical model, it is essential to understand the behavior of each lithology within the ore body through geometallurgical testing. In this context, the present study aims to evaluate the performance of bench-scale tests conducted on the main mining fronts of a zinc mine operation located in Brazil. The mineral processing plant was designed to process lead and zinc sulfide ores without material stockpiling, where all ores extracted from the underground mine are immediately processed. The geometallurgical characterization was conducted through the following steps: sampling, crushing, grinding, and flotation. The recovery, concentrate, and tailing contents during the flotation stages of galena and sphalerite were analyzed. A mineralogical characterization using a Mineral Liberation Analyzer (MLA) was performed to assess the degree of particle liberation and mineral associations within the studied mining fronts. The results indicate that a higher degree of pyrite liberation leads to greater metallurgical recovery of mineralized bodies A (breccia-hosted orebody), B (sphalerite-rich doloarenite orebody), and C (upper replaced stratiform orebody). Among these, mineralized body C presents the highest recovery in the zinc and lead stages, with 99.5% and 86.2%, respectively.
Open AccessGeometallurgical Characterization of the Main Mining Fronts of a Zinc and Lead Mine Operation
Geometallurgy is an approach that utilizes predictive models that can support business decisions, mitigate risks, and enhance production efficiency. To develop an accurate geometallurgical model, it is essential to understand the behavior of each lithology within the ore body through geometallurgical testing. In this context, the present study aims to evaluate the performance of bench-scale tests conducted on the main mining fronts of a zinc mine operation located in Brazil. The mineral processing plant was designed to process lead and zinc sulfide ores without material stockpiling, where all ores extracted from the underground mine are immediately processed. The geometallurgical characterization was conducted through the following steps: sampling, crushing, grinding, and flotation. The recovery, concentrate, and tailing contents during the flotation stages of galena and sphalerite were analyzed. A mineralogical characterization using a Mineral Liberation Analyzer (MLA) was performed to assess the degree of particle liberation and mineral associations within the studied mining fronts. The results indicate that a higher degree of pyrite liberation leads to greater metallurgical recovery of mineralized bodies A (breccia-hosted orebody), B (sphalerite-rich doloarenite orebody), and C (upper replaced stratiform orebody). Among these, mineralized body C presents the highest recovery in the zinc and lead stages, with 99.5% and 86.2%, respectively.
- Open Access
An Advanced Approach for Geometallurgical Modeling Applied to Bauxite Mines
Geometallurgy is an approach that integrates geology, mining, processing, and environmental areas, aiming to increase knowledge of the deposit and reduce risks in mining projects and/or operations. Growing changes in economic and operational scenarios require the development of robust models for metallurgical responses. Typically, the population of geometallurgical variables is small, and there are restrictions on applying geostatistical techniques, such as Ordinary Kriging, since recoveries are considered non-additive variables. This study used multiple linear regression to develop a geometallurgical model for a bauxite mine. The developed models enabled reconciliation with real results, and this application for bauxite mining represents a novelty in the literature. The model estimated the mass recovery in the coarse fraction with an accuracy greater than 97%. Additionally, the geometallurgical model developed for Mineração Rio do Norte (MRN) allows predictability and mapping potential product quality deviations.
Open AccessAn Advanced Approach for Geometallurgical Modeling Applied to Bauxite Mines
Geometallurgy is an approach that integrates geology, mining, processing, and environmental areas, aiming to increase knowledge of the deposit and reduce risks in mining projects and/or operations. Growing changes in economic and operational scenarios require the development of robust models for metallurgical responses. Typically, the population of geometallurgical variables is small, and there are restrictions on applying geostatistical techniques, such as Ordinary Kriging, since recoveries are considered non-additive variables. This study used multiple linear regression to develop a geometallurgical model for a bauxite mine. The developed models enabled reconciliation with real results, and this application for bauxite mining represents a novelty in the literature. The model estimated the mass recovery in the coarse fraction with an accuracy greater than 97%. Additionally, the geometallurgical model developed for Mineração Rio do Norte (MRN) allows predictability and mapping potential product quality deviations.
- Open Access
- 1 January 2025
- Published by Editora Cubo in Tecnologia em Metalurgia, Materiais e Mineração
- Vol. 22, e3205
Machine Learning no processamento do nióbio: aplicação da regressão Random Forest para análise de dados experimentais
Tecnol. Metal. Mater. Min., vol.22, e3205, 2025
- 1 January 2025
- Published by Editora Cubo in Tecnologia em Metalurgia, Materiais e Mineração
- Vol. 22, e3205
Open AccessMachine Learning no processamento do nióbio: aplicação da regressão Random Forest para análise de dados experimentais
Tecnol. Metal. Mater. Min., vol.22, e3205, 2025
- 5 June 2024
- Published by Springer Nature in Mining, Metallurgy & Exploration
- Vol. 41 (4) , 1629-1643
Short-Term Schedule Optimization with Nonlinear Blending Models for Improved Metallurgical Recovery in Mining
- 5 June 2024
- Published by Springer Nature in Mining, Metallurgy & Exploration
- Vol. 41 (4) , 1629-1643
Short-Term Schedule Optimization with Nonlinear Blending Models for Improved Metallurgical Recovery in Mining
- 1 March 2022
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 131 (1) , 1-11
Geometallurgy-oriented mine scheduling considering volume support and non-additivity
In mine planning, metallurgical recovery is traditionally estimated in each block as a fixed value or a function of the block's primary geological attributes. Nevertheless, this variable has two characteristics that are often neglected. First, it is non-additive, which means that estimation and scaling procedures of such properties cannot be done based on linear techniques. Second, it is a process response variable, which means this variable value represents the response of the volume processed at the plant. The combination of these two properties results that the metallurgical recovery of each block is dependent on the blocks that will be mined and processed together with it at the plant. This paper demonstrates the difference between how metallurgical recovery is traditionally considered in mine planning, and how it should be. There are impacts on mine scheduling/blending, global metallurgical recovery estimation (total quantity of metal recovered) and total economic value.
- 1 March 2022
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 131 (1) , 1-11
Geometallurgy-oriented mine scheduling considering volume support and non-additivity
In mine planning, metallurgical recovery is traditionally estimated in each block as a fixed value or a function of the block's primary geological attributes. Nevertheless, this variable has two characteristics that are often neglected. First, it is non-additive, which means that estimation and scaling procedures of such properties cannot be done based on linear techniques. Second, it is a process response variable, which means this variable value represents the response of the volume processed at the plant. The combination of these two properties results that the metallurgical recovery of each block is dependent on the blocks that will be mined and processed together with it at the plant. This paper demonstrates the difference between how metallurgical recovery is traditionally considered in mine planning, and how it should be. There are impacts on mine scheduling/blending, global metallurgical recovery estimation (total quantity of metal recovered) and total economic value.
- 30 November 2019
- Published by Springer Nature in Springer Series in Geomechanics and Geoengineering
- p. 120-127
Comparison of Methods to Define the Final Pit - A Case Study
- 30 November 2019
- Published by Springer Nature in Springer Series in Geomechanics and Geoengineering
- p. 120-127
Comparison of Methods to Define the Final Pit - A Case Study
- 30 November 2019
- Published by Springer Nature
- p. 262-270
Analysis of Mobile Communication Coverage and Capacity for Automation in Open-Pit Mines
- 30 November 2019
- Published by Springer Nature
- p. 262-270
Analysis of Mobile Communication Coverage and Capacity for Automation in Open-Pit Mines
- 30 November 2019
- Published by Springer Nature in Springer Series in Geomechanics and Geoengineering
- p. 399-407
Health and Safety in Brazilian Mines: A Statistical Analysis
- 30 November 2019
- Published by Springer Nature in Springer Series in Geomechanics and Geoengineering
- p. 399-407
Health and Safety in Brazilian Mines: A Statistical Analysis