A note on scheduling a rate modifying activity to minimize total late work
Authors:
- Gur MosheiovGMGur Mosheiov
- Daniel OronDODaniel Oron
- 1 April 2021
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 154
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- Scheduling on a proportionate flowshop to minimise total late workInternational Journal of Production Research, 2018
- Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effectComputers & Industrial Engineering, 2017
- A single machine scheduling problem to minimize total early workComputers & Operations Research, 2016
- A hybrid genetic algorithm with two-stage dispatching heuristic for a machine scheduling problem with step-deteriorating jobs and rate-modifying activitiesComputers & Industrial Engineering, 2016
- Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activityComputers & Industrial Engineering, 2013
- A note: Common due date assignment for a single machine scheduling with the rate-modifying activityComputers & Operations Research, 2009
- Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due dateComputers & Operations Research, 2008
- A comparison of solution procedures for two-machine flow shop scheduling with late work criterionComputers & Industrial Engineering, 2005
- The two-machine flow-shop problem with weighted late work criterion and common due dateEuropean Journal of Operational Research, 2005
- Flow Shop Scheduling with Late Work Criterion – Choosing the Best Solution Strategy2004