Gwendolyn J. Woods
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Gwendolyn J. Woods has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Kevin Lansey
University of Arizona
3 shared publications - Robert G. Arnold
Department of Chemical and Environmental Engineering, University of Arizona, Tucson, AZ 85721, USA, Tel.: +1 (520) 621-2410
2 shared publications - Christopher A. Scott
Pennsylvania State University
1 shared publication - Christopher J. Bailey
Udall Center for Studies in Public Policy, The University of Arizona, 803 East 1st Street, Tucson, AZ 85719, USA
1 shared publication Daniel R. Quintanar
Project Manager, Tucson Water, Tucson, AZ 85701
1 shared publication- Doosun Kang
Dept. of Civil Engineering, Univ. of Suwon, South Korea
1 shared publication
Latest Publications
- 1 May 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Environmental Engineering
- Vol. 139 (5) , 703-711
Life Cycle Analysis for Water and Wastewater Pipe Materials
A life cycle analysis (LCA) was performed for six commonly used types of water and wastewater pipe materials: polyvinyl chloride (PVC), ductile iron, cast iron, high density polyethylene (HDPE), concrete, and reinforced concrete. The objectives were to (1) compare the six pipe materials in terms of global warming potential (GWP) through four LCA phases: pipe production, transport, installation, and use; (2) determine the primary source(s) of differences in LCA results; and (3) examine the effectiveness of currently used pipe size selection criteria when LCA GWP is considered. The results for unit lengths of discrete pipe sizes were used to generate functions relating GWP per kilometer of pipe to diameter and material selections. The LCA results were monetized using an emission penalty of ton of . For pipe diameters , GWP due to pipe manufacture, transport, and installation of ductile iron pipe was the largest among the six materials. At diameters , the GWP of PVC was highest. Concrete pipe resulted in the lowest GWP across the entire range of pipe sizes investigated. The GWP for pipe production, transport, and installation in a high-growth planning area in southeast Tucson, Arizona, was approximately one-tenth of the GWP derived from pipe network operation. The lifetime GWP from production, transport, and installation increased monotonically with pipe diameter for all materials analyzed, whereas, for a given flow, GWP from energy loss due to friction in flow simulations was inversely related to pipe diameter. The tradeoff suggests that there is an optimum diameter that minimizes lifetime GWP. However, optimum pipe sizes based on GWP were similar to pipe diameters selected based on economic cost alone, suggesting that LCA of water distribution and wastewater collection systems will not yield major changes in criteria for selection of pipe size.- 1 May 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Environmental Engineering
- Vol. 139 (5) , 703-711
Life Cycle Analysis for Water and Wastewater Pipe Materials
A life cycle analysis (LCA) was performed for six commonly used types of water and wastewater pipe materials: polyvinyl chloride (PVC), ductile iron, cast iron, high density polyethylene (HDPE), concrete, and reinforced concrete. The objectives were to (1) compare the six pipe materials in terms of global warming potential (GWP) through four LCA phases: pipe production, transport, installation, and use; (2) determine the primary source(s) of differences in LCA results; and (3) examine the effectiveness of currently used pipe size selection criteria when LCA GWP is considered. The results for unit lengths of discrete pipe sizes were used to generate functions relating GWP per kilometer of pipe to diameter and material selections. The LCA results were monetized using an emission penalty of ton of . For pipe diameters , GWP due to pipe manufacture, transport, and installation of ductile iron pipe was the largest among the six materials. At diameters , the GWP of PVC was highest. Concrete pipe resulted in the lowest GWP across the entire range of pipe sizes investigated. The GWP for pipe production, transport, and installation in a high-growth planning area in southeast Tucson, Arizona, was approximately one-tenth of the GWP derived from pipe network operation. The lifetime GWP from production, transport, and installation increased monotonically with pipe diameter for all materials analyzed, whereas, for a given flow, GWP from energy loss due to friction in flow simulations was inversely related to pipe diameter. The tradeoff suggests that there is an optimum diameter that minimizes lifetime GWP. However, optimum pipe sizes based on GWP were similar to pipe diameters selected based on economic cost alone, suggesting that LCA of water distribution and wastewater collection systems will not yield major changes in criteria for selection of pipe size.- 1 May 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 139 (3) , 313-324
Centralized versus Decentralized Wastewater Reclamation in the Houghton Area of Tucson, Arizona
Reclaimed wastewater is increasingly important to satisfaction of water-sustainability objectives in water-short municipalities throughout the United States and particularly in the Southwest. Water reclamation and reuse present new challenges for urban planners, who now tend to consider renewable freshwater and reclaimed wastewater as unique parts of a single water resources portfolio. Efficiency objectives in geographically dispersed communities lead planners to explore the relative merits of centralized versus decentralized wastewater-treatment capacity when new construction is required. However, the complexity of the planning landscape—in which existing water distribution and sewerage capacities; geographic factors; and uncertainty in growth projections, energy cost, and even the sustainability of existing freshwater supplies contribute to plan selection—suggests that decision support methods can usefully supplement engineering judgment to find a near-optimal level of decentralization in facilities planning. In this study, an existing decision support system (DSS) was modified to include costs attributable to infrastructure construction, operation, and maintenance for wastewater collection and transmission of both potable and reclaimed water at the regional (city or city subsection) level to aid water supply planning. The modified DSS was then applied to a study area in southeast Tucson, Arizona. Several scenarios are developed and compared on the basis of cost and energy consumption. A sensitivity analysis is provided. In general, increased peripheral demand, limited existing capacity, greater elevation differences, and lower discount rates favor decentralized design and construction.
- 1 May 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 139 (3) , 313-324
Centralized versus Decentralized Wastewater Reclamation in the Houghton Area of Tucson, Arizona
Reclaimed wastewater is increasingly important to satisfaction of water-sustainability objectives in water-short municipalities throughout the United States and particularly in the Southwest. Water reclamation and reuse present new challenges for urban planners, who now tend to consider renewable freshwater and reclaimed wastewater as unique parts of a single water resources portfolio. Efficiency objectives in geographically dispersed communities lead planners to explore the relative merits of centralized versus decentralized wastewater-treatment capacity when new construction is required. However, the complexity of the planning landscape—in which existing water distribution and sewerage capacities; geographic factors; and uncertainty in growth projections, energy cost, and even the sustainability of existing freshwater supplies contribute to plan selection—suggests that decision support methods can usefully supplement engineering judgment to find a near-optimal level of decentralization in facilities planning. In this study, an existing decision support system (DSS) was modified to include costs attributable to infrastructure construction, operation, and maintenance for wastewater collection and transmission of both potable and reclaimed water at the regional (city or city subsection) level to aid water supply planning. The modified DSS was then applied to a study area in southeast Tucson, Arizona. Several scenarios are developed and compared on the basis of cost and energy consumption. A sensitivity analysis is provided. In general, increased peripheral demand, limited existing capacity, greater elevation differences, and lower discount rates favor decentralized design and construction.
- Open Access
Scenario Planning to Address Critical Uncertainties for Robust and Resilient Water–Wastewater Infrastructures under Conditions of Water Scarcity and Rapid Development
Ensuring water availability for multiple needs represents a sustainable development challenge globally. Rigid planning for fixed water supply and reuse targets with estimated demand growth and static assumptions of water availability can prove inflexible in responding to changing conditions. Formal methods to adaptively respond to these challenges are needed, particularly in regions with limited natural resources and/or where multiple uncertain forces can influence water-resource availability and supply reliability. This paper assesses the application of Scenario Planning in one such region—Tucson, Arizona, USA—over the coming 40 years, and highlights broader lessons for addressing complex interrelationships of water management, infrastructure development, and population growth. Planners from multiple jurisdictions and researchers identified ten key forces and prioritized three with the greatest uncertainty and the greatest impact for water and development planning: (1) changing demands based on potential future density, layout, and per capita water use/reuse; (2) adequacy of current water supplies to meet future demands; and (3) evolving public perceptions of water reuse including potential options to supplement potable water supplies. Detailed scenario modeling using GIS and infrastructure cost optimization is under development and is now beginning to produce results, to be discussed in future publications. The process has clearly demonstrated the value of Scenario Planning as a tool for bringing stakeholders into agreement over highly complex and historically divisive problems, and for prioritizing amongst diverse uncertainties. The paper concludes by characterizing possible outcomes for this case and draws lessons for other water scarce regions experiencing rapid development.
Open AccessScenario Planning to Address Critical Uncertainties for Robust and Resilient Water–Wastewater Infrastructures under Conditions of Water Scarcity and Rapid Development
Ensuring water availability for multiple needs represents a sustainable development challenge globally. Rigid planning for fixed water supply and reuse targets with estimated demand growth and static assumptions of water availability can prove inflexible in responding to changing conditions. Formal methods to adaptively respond to these challenges are needed, particularly in regions with limited natural resources and/or where multiple uncertain forces can influence water-resource availability and supply reliability. This paper assesses the application of Scenario Planning in one such region—Tucson, Arizona, USA—over the coming 40 years, and highlights broader lessons for addressing complex interrelationships of water management, infrastructure development, and population growth. Planners from multiple jurisdictions and researchers identified ten key forces and prioritized three with the greatest uncertainty and the greatest impact for water and development planning: (1) changing demands based on potential future density, layout, and per capita water use/reuse; (2) adequacy of current water supplies to meet future demands; and (3) evolving public perceptions of water reuse including potential options to supplement potable water supplies. Detailed scenario modeling using GIS and infrastructure cost optimization is under development and is now beginning to produce results, to be discussed in future publications. The process has clearly demonstrated the value of Scenario Planning as a tool for bringing stakeholders into agreement over highly complex and historically divisive problems, and for prioritizing amongst diverse uncertainties. The paper concludes by characterizing possible outcomes for this case and draws lessons for other water scarce regions experiencing rapid development.