Nuhu Braimah
Research Subjects
Nuhu Braimah has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Abdulaziz Almutairi
Brunel University London
1 shared publication - Ameena Kulaib Al Tenaiji
Department of Civil and Environmental Engineering, Brunel University, Uxbridge, UK
1 shared publication - Andrew Fox
Department of Civil and Environmental Engineering, Brunel University London, Uxbridge, London UB8 3PH, UK
1 shared publication - Ibrahim Alhammad
Department of Civil Engineering, King Saud University, P.O. Box 2454, Riyadh 114, Saudi Arabia
1 shared publication - Issaka Ndekugri
School of Architecture and Built Environment, University of Wolverhampton, Wolverhampton, UK
1 shared publication - Khalid Saad Al-Gahtani
Nesma and Partners’ Chair for Construction Research and Building Technologies, Department of Civil Engineering, King Saud University, Riyadh 11451, Saudi Arabia
1 shared publication
Latest Publications
- Open Access
Critical Evaluation of the Contract Selection Process Used in the Construction Industry of Kuwait
The paper investigates and assesses the contract selection procedure used in Kuwait’s construction sector. The ideas and insights of engineers involved in significant Kuwaiti construction projects will be extensively considered. In the Kuwaiti building sector, various ways of choosing the contract form will be discussed. In order to gather pertinent data about the country’s primary construction projects, questionnaires will be used. This methodology ensures a first-hand account of the challenges and preferences within the industry. This data will be analyzed to determine the best ways to enhance the current system utilized for Kuwaiti building contracts for the choice of contract forms and payment terms that could benefit from the inclusion of measures to guarantee those types of task delivery systems and payment terms in the country’s future construction projects. This paper explores the typical contract types and payment mechanisms used in Kuwait, drawing on a thorough analysis of current literature, governmental regulations, and business practices. The Standard Forms of Contract, which offer fixed-priced payments, have become the most popular option. However, when used for extensive and technically challenging projects, this contract form’s simplicity presents difficulties. Additionally, the existing system encourages contract awards based on the lowest tender, which raises questions regarding appropriateness and proportionality. The study suggests an arsenal of criteria for improving the deal selection process, with an emphasis on diverse terms of payment inside the task delivery system, in order to allay these worries. It highlights the need for a more comprehensive approach for deal selection that takes project complexity, financial constraints, and long-term project interest into account. The proposed criteria additionally include adaptability to project complexity, ensuring flexibility for challenges in large projects. Financial considerations, aligning with budgetary requirements, are crucial. The emphasis is on long-term project success, and finding a balance between simplicity and adaptability in contracts is key. These comprehensive criteria aim to improve decision-making in selecting standard contract forms for construction projects, addressing challenges in large, technically demanding endeavors in Kuwait. This research contributes to the field by introducing a novel set of criteria for contract selection, tailored to the Kuwaiti construction context. The study’s originality lies in its approach to addressing the challenges posed by current practices and its focus on refining the system for future projects. Additionally, the study employs a rigorous questionnaire survey to extract firsthand insights from industry professionals, ensuring a robust and contextually relevant exploration of the contract selection landscape in Kuwait’s construction sector.
Open AccessCritical Evaluation of the Contract Selection Process Used in the Construction Industry of Kuwait
The paper investigates and assesses the contract selection procedure used in Kuwait’s construction sector. The ideas and insights of engineers involved in significant Kuwaiti construction projects will be extensively considered. In the Kuwaiti building sector, various ways of choosing the contract form will be discussed. In order to gather pertinent data about the country’s primary construction projects, questionnaires will be used. This methodology ensures a first-hand account of the challenges and preferences within the industry. This data will be analyzed to determine the best ways to enhance the current system utilized for Kuwaiti building contracts for the choice of contract forms and payment terms that could benefit from the inclusion of measures to guarantee those types of task delivery systems and payment terms in the country’s future construction projects. This paper explores the typical contract types and payment mechanisms used in Kuwait, drawing on a thorough analysis of current literature, governmental regulations, and business practices. The Standard Forms of Contract, which offer fixed-priced payments, have become the most popular option. However, when used for extensive and technically challenging projects, this contract form’s simplicity presents difficulties. Additionally, the existing system encourages contract awards based on the lowest tender, which raises questions regarding appropriateness and proportionality. The study suggests an arsenal of criteria for improving the deal selection process, with an emphasis on diverse terms of payment inside the task delivery system, in order to allay these worries. It highlights the need for a more comprehensive approach for deal selection that takes project complexity, financial constraints, and long-term project interest into account. The proposed criteria additionally include adaptability to project complexity, ensuring flexibility for challenges in large projects. Financial considerations, aligning with budgetary requirements, are crucial. The emphasis is on long-term project success, and finding a balance between simplicity and adaptability in contracts is key. These comprehensive criteria aim to improve decision-making in selecting standard contract forms for construction projects, addressing challenges in large, technically demanding endeavors in Kuwait. This research contributes to the field by introducing a novel set of criteria for contract selection, tailored to the Kuwaiti construction context. The study’s originality lies in its approach to addressing the challenges posed by current practices and its focus on refining the system for future projects. Additionally, the study employs a rigorous questionnaire survey to extract firsthand insights from industry professionals, ensuring a robust and contextually relevant exploration of the contract selection landscape in Kuwait’s construction sector.
- Open Access
A Systematic Method to Analyze Force Majeure in Construction Claims
In construction delay claims, force majeure is normally recognized as an excusable risk that entitles contractors only to time extensions, but neither of the contracting parties is entitled to monetary compensation to recover delay damages. However, there are instances where contractors are entitled to both time and cost compensations, as evidenced by some court cases relating to force majeure claims. Such instances involve attributing the occurrence of the force majeure to the effect of other prior delay events that pushed project performance into the period of the force majeure. Existing delay analysis methods are not capable of addressing this issue, as none take the impact of other delays into consideration when analyzing force majeure claims. Stimulated by this gap, this study proposes an improved and sound method for fairly analyzing the responsibility of force majeure delay claims amongst contracting parties. This method was implemented on a case project to help demonstrate its application and also ascertain its practicability. The contribution of this paper is twofold. First, it has highlighted the situation of force majeure delay that can be compensable, creating more awareness among researchers and industry practitioners. The second is a proposed systematic process to appropriately analyze its responsibility, which equitably addresses claims from such delays with little or no chance of dispute ensuing.
Open AccessA Systematic Method to Analyze Force Majeure in Construction Claims
In construction delay claims, force majeure is normally recognized as an excusable risk that entitles contractors only to time extensions, but neither of the contracting parties is entitled to monetary compensation to recover delay damages. However, there are instances where contractors are entitled to both time and cost compensations, as evidenced by some court cases relating to force majeure claims. Such instances involve attributing the occurrence of the force majeure to the effect of other prior delay events that pushed project performance into the period of the force majeure. Existing delay analysis methods are not capable of addressing this issue, as none take the impact of other delays into consideration when analyzing force majeure claims. Stimulated by this gap, this study proposes an improved and sound method for fairly analyzing the responsibility of force majeure delay claims amongst contracting parties. This method was implemented on a case project to help demonstrate its application and also ascertain its practicability. The contribution of this paper is twofold. First, it has highlighted the situation of force majeure delay that can be compensable, creating more awareness among researchers and industry practitioners. The second is a proposed systematic process to appropriately analyze its responsibility, which equitably addresses claims from such delays with little or no chance of dispute ensuing.
- Open Access
- 25 March 2016
- Published by MDPI AG in International Journal of Environmental Research and Public Health
- Vol. 13 (4) , 364
A Review of the Water and Energy Sectors and the Use of a Nexus Approach in Abu Dhabi
Rapid population increase coupled with urbanization and industrialization has resulted in shortages of water in the Middle East. This situation is further exacerbated by global climate change due to greenhouse gas emissions. Recent research advocates that solutions to the global water security and scarcity crisis must involve water–energy nexus approaches. This means adopting policies and strategies that harmonize these inter-related sectors to minimize environmental impact while maximizing human benefit. In the case of Abu Dhabi, when designing and locating oil/gas refineries and associated power generation facilities, previous relevant decisions were based on simple economic and geographical grounds, such as nearness to oil rigs, pipelines, existing industries and port facilities, etc. The subsequent design and location of water abstraction and treatment works operated by the waste heat from these refining and/or power generation processes was catered for as an afterthought, meaning that there is now a mismatch between the water and energy supplies and demands. This review study was carried out to show how Abu Dhabi is trying now to integrate its water–energy sectors using a nexus approach so that future water/power infrastructure is designed optimally and operated in harmony, especially in regard to future demand. Based upon this review work, some recommendations are made for designers and policy makers alike to bolster the nexus approach that Abu Dhabi is pursuing.
- 25 March 2016
- Published by MDPI AG in International Journal of Environmental Research and Public Health
- Vol. 13 (4) , 364
Open AccessA Review of the Water and Energy Sectors and the Use of a Nexus Approach in Abu Dhabi
Rapid population increase coupled with urbanization and industrialization has resulted in shortages of water in the Middle East. This situation is further exacerbated by global climate change due to greenhouse gas emissions. Recent research advocates that solutions to the global water security and scarcity crisis must involve water–energy nexus approaches. This means adopting policies and strategies that harmonize these inter-related sectors to minimize environmental impact while maximizing human benefit. In the case of Abu Dhabi, when designing and locating oil/gas refineries and associated power generation facilities, previous relevant decisions were based on simple economic and geographical grounds, such as nearness to oil rigs, pipelines, existing industries and port facilities, etc. The subsequent design and location of water abstraction and treatment works operated by the waste heat from these refining and/or power generation processes was catered for as an afterthought, meaning that there is now a mismatch between the water and energy supplies and demands. This review study was carried out to show how Abu Dhabi is trying now to integrate its water–energy sectors using a nexus approach so that future water/power infrastructure is designed optimally and operated in harmony, especially in regard to future demand. Based upon this review work, some recommendations are made for designers and policy makers alike to bolster the nexus approach that Abu Dhabi is pursuing.
- Open Access
Approaches to Delay Claims Assessment Employed in the UK Construction Industry
Construction project delays emanates from multiplicity of different sources of risk events. This, combined with high uncertainty in cause-effect relationships between the events and their impacts on project completion dates, have created immense difficulties in apportioning project delay responsibilities amongst contracting parties. This challenge is now dealt with by various delay analysis approaches, yet delay claims settlement continues to be a troublesome undertaking. Empirical research on these approaches as to their application in practice is limited, although such studies provide important reference sources to practitioners and researchers. As a contribution to addressing this gap, this paper reports on practitioners’ views on the approaches based on a UK nation-wide questionnaire survey of construction and consulting companies. The key findings of the study include: (1) delay claims are often resolved late and not close in time of occurrence of the delay events, creating more difficulties; (2) simplistic delay analysis approaches are widely used in practice and form the basis of successful claim resolutions, although they have major weaknesses; (3) the sophisticated approaches, although are more robust, are generally not popular in practice. To promote the use of these reliable approaches and help reduce or avoid disputes amongst claims parties, programming and record keeping practices must be improved as they do not facilitate the use of the approaches.
Open AccessApproaches to Delay Claims Assessment Employed in the UK Construction Industry
Construction project delays emanates from multiplicity of different sources of risk events. This, combined with high uncertainty in cause-effect relationships between the events and their impacts on project completion dates, have created immense difficulties in apportioning project delay responsibilities amongst contracting parties. This challenge is now dealt with by various delay analysis approaches, yet delay claims settlement continues to be a troublesome undertaking. Empirical research on these approaches as to their application in practice is limited, although such studies provide important reference sources to practitioners and researchers. As a contribution to addressing this gap, this paper reports on practitioners’ views on the approaches based on a UK nation-wide questionnaire survey of construction and consulting companies. The key findings of the study include: (1) delay claims are often resolved late and not close in time of occurrence of the delay events, creating more difficulties; (2) simplistic delay analysis approaches are widely used in practice and form the basis of successful claim resolutions, although they have major weaknesses; (3) the sophisticated approaches, although are more robust, are generally not popular in practice. To promote the use of these reliable approaches and help reduce or avoid disputes amongst claims parties, programming and record keeping practices must be improved as they do not facilitate the use of the approaches.
- Open Access
Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs
The time for performance of a project is usually of the essence to the employer and the contractor. This has made it quite imperative for contracting parties to analyse project delays for purposes of making right decisions on potential time and/or cost compensation claims. Over the years, existing delay analysis techniques (DATs) for aiding this decision-making have been helpful but have not succeeded in curbing the high incidence of disputes associated with delay claims resolutions. A major source of the disputes lies with the limitations and capabilities of the techniques in their practical use. Developing a good knowledge of these aspects of the techniques is of paramount importance in understanding the real problematic issues involved and their improvement needs. This paper seeks to develop such knowledge and understanding (as part of a wider research work) via: an evaluation of the most common DATs based on a case study, a review of the key relevant issues often not addressed by the techniques, and the necessary improvements needs. The evaluation confirmed that the various techniques yield different analysis results for the same delay claims scenario, mainly due to their unique application procedures. The issues that are often ignored in the analysis but would also affect delay analysis results are: functionality of the programming software employed for the analysis, resource loading and levelling requirements, resolving concurrent delays, and delay-pacing strategy. Improvement needs by way of incorporating these issues in the analysis and focusing on them in future research work are the key recommendations of the study.
Open AccessConstruction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs
The time for performance of a project is usually of the essence to the employer and the contractor. This has made it quite imperative for contracting parties to analyse project delays for purposes of making right decisions on potential time and/or cost compensation claims. Over the years, existing delay analysis techniques (DATs) for aiding this decision-making have been helpful but have not succeeded in curbing the high incidence of disputes associated with delay claims resolutions. A major source of the disputes lies with the limitations and capabilities of the techniques in their practical use. Developing a good knowledge of these aspects of the techniques is of paramount importance in understanding the real problematic issues involved and their improvement needs. This paper seeks to develop such knowledge and understanding (as part of a wider research work) via: an evaluation of the most common DATs based on a case study, a review of the key relevant issues often not addressed by the techniques, and the necessary improvements needs. The evaluation confirmed that the various techniques yield different analysis results for the same delay claims scenario, mainly due to their unique application procedures. The issues that are often ignored in the analysis but would also affect delay analysis results are: functionality of the programming software employed for the analysis, resource loading and levelling requirements, resolving concurrent delays, and delay-pacing strategy. Improvement needs by way of incorporating these issues in the analysis and focusing on them in future research work are the key recommendations of the study.
- 1 December 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (12) , 1279-1288
Consultants’ Perceptions on Construction Delay Analysis Methodologies
Resolving the delay claims that usually trail delayed completion of construction projects is beset with immense difficulties that often lead to disputes between the parties involved. The research reported in this paper is a part of a wider study aimed at developing a framework for reducing the attendant disputes and aiding cost-efficient dispute resolution. The focus of the part reported here is owner consultants’ perceptions on existing methodologies for analyzing project delay. Based on a survey of U.K. construction consulting organizations, the study examined, among others, the awareness and use of these methodologies, their perceived reliability, expert involvement, and obstacles to their use. The main study findings are: (i) delay analysis is a multidisciplinary task, with the project quantity surveyor often playing the leading role on the owner’s side; (ii) the simpler methodologies are used more often than the complex ones although the former are known to be less reliable than the latter; and (iii)...
- 1 December 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (12) , 1279-1288
Consultants’ Perceptions on Construction Delay Analysis Methodologies
Resolving the delay claims that usually trail delayed completion of construction projects is beset with immense difficulties that often lead to disputes between the parties involved. The research reported in this paper is a part of a wider study aimed at developing a framework for reducing the attendant disputes and aiding cost-efficient dispute resolution. The focus of the part reported here is owner consultants’ perceptions on existing methodologies for analyzing project delay. Based on a survey of U.K. construction consulting organizations, the study examined, among others, the awareness and use of these methodologies, their perceived reliability, expert involvement, and obstacles to their use. The main study findings are: (i) delay analysis is a multidisciplinary task, with the project quantity surveyor often playing the leading role on the owner’s side; (ii) the simpler methodologies are used more often than the complex ones although the former are known to be less reliable than the latter; and (iii)...