John B. Copp
John B. Copp has a total of 22 co-authors. Here are the top co-authors by number of shared publications:
- Peter A. Vanrolleghem
modelEAU, Université Laval, Québec City, QC G1V 0A6, Canada
3 shared publications - Andrew Shaw
Black & Veatch Corporation, 920 Memorial City Way, Suite 600, Houston, TX 77024, USA
1 shared publication - B. Narayanan
Carollo Engineers, 2700 Ygnacio Valley Road, Suite 300, Walnut Creek 94598, CA, USA
1 shared publication - Bruce R. Johnson
CH2M HILL, Englewood, Colorado
1 shared publication - Christian Hübner
ifak Institut für Automation und Kommunikation e.V., Magdeburg, 39106 Germany
1 shared publication - Christian Rosén
Department of Industrial Electrical Engineering and Automation, Lund University, Box 118, SE-221 00 Lund, Sweden
1 shared publication
Latest Publications
- 1 January 2010
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 43 (23) , 37-42
Engineering Challenges and Approaches in Water Quality Monitoring Networks
- 1 January 2010
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 43 (23) , 37-42
Engineering Challenges and Approaches in Water Quality Monitoring Networks
- 1 February 2009
- Published by IWA Publishing in Water Science & Technology
- Vol. 59 (4) , 763-769
A balancing act: the consulting engineers' pragmatic view of process modelling
Modelling: what do we know, what do we want to know and why? The practical application of models to real projects is often circular because these questions weren't asked prior to making the decision to model the plant under study. Modelling wastewater treatment plants can provide insight into the inner workings of the process that might not be attainable any other way, but is that added process knowledge always needed or necessary and what criteria does one use to determine the level of effort required? These complex modelling decisions require education, communication, and improved understanding amongst both modellers and clients. This submission explores the use of models by consultants for consulting purposes and the balancing acts (time versus knowledge and cost versus benefit) that the consulting engineer must manage when embarking on any modelling project.
- 1 February 2009
- Published by IWA Publishing in Water Science & Technology
- Vol. 59 (4) , 763-769
A balancing act: the consulting engineers' pragmatic view of process modelling
Modelling: what do we know, what do we want to know and why? The practical application of models to real projects is often circular because these questions weren't asked prior to making the decision to model the plant under study. Modelling wastewater treatment plants can provide insight into the inner workings of the process that might not be attainable any other way, but is that added process knowledge always needed or necessary and what criteria does one use to determine the level of effort required? These complex modelling decisions require education, communication, and improved understanding amongst both modellers and clients. This submission explores the use of models by consultants for consulting purposes and the balancing acts (time versus knowledge and cost versus benefit) that the consulting engineer must manage when embarking on any modelling project.
- 1 January 2009
- Published by IWA Publishing in Water Science & Technology
- Vol. 59 (1) , 141-147
A comparative analysis of different approaches for integrated WWTP modelling
In this paper a comparative analysis of the most important approaches for integrated WWTP modelling is presented. After an introductory presentation of the most important drawbacks and challenges for plant wide modelling, the fundamentals of three different approaches to construct integrated models are presented: “Interfaces” “Standard Supermodel” and “Tailored Supermodel”. Afterwards, a comparative analysis of these approaches from different points of view (difficulties for the model end user, characterization of the process in the plant, flexibility or adaptability for each case of study, simulation platform requirements and computational costs) is carried out. From this comparison, some important conclusions about the suitability of each alternative depending on the simulation case study are extracted.
- 1 January 2009
- Published by IWA Publishing in Water Science & Technology
- Vol. 59 (1) , 141-147
A comparative analysis of different approaches for integrated WWTP modelling
In this paper a comparative analysis of the most important approaches for integrated WWTP modelling is presented. After an introductory presentation of the most important drawbacks and challenges for plant wide modelling, the fundamentals of three different approaches to construct integrated models are presented: “Interfaces” “Standard Supermodel” and “Tailored Supermodel”. Afterwards, a comparative analysis of these approaches from different points of view (difficulties for the model end user, characterization of the process in the plant, flexibility or adaptability for each case of study, simulation platform requirements and computational costs) is carried out. From this comparison, some important conclusions about the suitability of each alternative depending on the simulation case study are extracted.
- Open Access
- 1 October 2007
- Published by IWA Publishing in Water Science & Technology
- Vol. 56 (8) , 67-78
Benchmark simulation model no 2: general protocol and exploratory case studies
Over a decade ago, the concept of objectively evaluating the performance of control strategies by simulating them using a standard model implementation was introduced for activated sludge wastewater treatment plants. The resulting Benchmark Simulation Model No 1 (BSM1) has been the basis for a significant new development that is reported on here: Rather than only evaluating control strategies at the level of the activated sludge unit (bioreactors and secondary clarifier) the new BSM2 now allows the evaluation of control strategies at the level of the whole plant, including primary clarifier and sludge treatment with anaerobic sludge digestion. In this contribution, the decisions that have been made over the past three years regarding the models used within the BSM2 are presented and argued, with particular emphasis on the ADM1 description of the digester, the interfaces between activated sludge and digester models, the included temperature dependencies and the reject water storage. BSM2-implementations are now available in a wide range of simulation platforms and a ring test has verified their proper implementation, consistent with the BSM2 definition. This guarantees that users can focus on the control strategy evaluation rather than on modelling issues. Finally, for illustration, twelve simple operational strategies have been implemented in BSM2 and their performance evaluated. Results show that it is an interesting control engineering challenge to further improve the performance of the BSM2 plant (which is the whole idea behind benchmarking) and that integrated control (i.e. acting at different places in the whole plant) is certainly worthwhile to achieve overall improvement.
- 1 October 2007
- Published by IWA Publishing in Water Science & Technology
- Vol. 56 (8) , 67-78
Open AccessBenchmark simulation model no 2: general protocol and exploratory case studies
Over a decade ago, the concept of objectively evaluating the performance of control strategies by simulating them using a standard model implementation was introduced for activated sludge wastewater treatment plants. The resulting Benchmark Simulation Model No 1 (BSM1) has been the basis for a significant new development that is reported on here: Rather than only evaluating control strategies at the level of the activated sludge unit (bioreactors and secondary clarifier) the new BSM2 now allows the evaluation of control strategies at the level of the whole plant, including primary clarifier and sludge treatment with anaerobic sludge digestion. In this contribution, the decisions that have been made over the past three years regarding the models used within the BSM2 are presented and argued, with particular emphasis on the ADM1 description of the digester, the interfaces between activated sludge and digester models, the included temperature dependencies and the reject water storage. BSM2-implementations are now available in a wide range of simulation platforms and a ring test has verified their proper implementation, consistent with the BSM2 definition. This guarantees that users can focus on the control strategy evaluation rather than on modelling issues. Finally, for illustration, twelve simple operational strategies have been implemented in BSM2 and their performance evaluated. Results show that it is an interesting control engineering challenge to further improve the performance of the BSM2 plant (which is the whole idea behind benchmarking) and that integrated control (i.e. acting at different places in the whole plant) is certainly worthwhile to achieve overall improvement.