JZJürgen Zimmermann

Jürgen Zimmermann

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Jürgen Zimmermann has a total of 31 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints

    by Mareike Karnebogen, Jürgen Zimmermann

    In recent years, new resource types have been established in project scheduling. These include so-called partially renewable resources, whose total capacity applies only to a subset of periods in the planning horizon. In this paper, we consider the extension of the resource-constrained project scheduling problem with those partially renewable resources as well as generalized precedence constraints with the objective of minimizing the project duration (RCPSP/max- $$\pi $$ π ). For this problem it is known that already the determination of a feasible solution is NP-hard in the strong sense. Hence, we present two different generation schemes that are able to find good feasible solutions in short time for most tested instances. The first one is a construction-based heuristic wherein the activities of the project are scheduled iteratively time- and resource-feasibly. The second one is a relaxation-based generation scheme, in which—starting from the schedule consisting of the earliest start times—resource conflicts are identified and resolved by inserting additional resource constraints.


  • Open Access

    Resource overload problems with tardiness penalty: structural properties and solution approaches

    by Lena Sophie Wohlert, Jürgen Zimmermann

    In this paper, we consider a resource overload problem and add a tardiness penalty to the objective function when a prescribed project makespan is exceeded, which enables a trade-off between a balanced resource utilization and a project delay. For the tardiness penalty, we distinguish between a constant and variable delay cost variant. Based on the structural properties of the resource overload problem, we show that the search space of the resource overload problem with tardiness penalty can also be reduced utilizing quasistable schedules. In addition, we discuss the application of these findings to further problems, which include objectives composed of a locally concave and a concave function or a reward structure for an early project completion instead of a tardiness penalty. As solution approaches, we present mixed-integer linear model formulations as well as a novel genetic algorithm with a decoding procedure, which exploits the devised structural properties. The performance of the genetic algorithm is improved by implementing learning methods and utilizing lower bounds. Finally, we present results from experiments on small to medium sized problem instances.


  • Open Access

    A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints

    by Kai Watermeyer, Jürgen Zimmermann

    This paper deals with the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints with the objective to minimize the project duration. The consideration of partially renewable resources allows to integrate the decision about the availability of a resource for a specific time period into the scheduling process. Together with general temporal constraints, which permit to establish minimum and maximum time lags between activities, even more aspects of real-life projects can be taken into account. We present a branch-and-bound algorithm for the stated problem that is based on a serial schedule-generation scheme. For the first time it is shown how a dominance criterion can be applied on the associated generation scheme to reduce the start times in each scheduling step. To improve the performance of the solution procedure, we integrate consistency tests and lower bounds from the literature and devise new pruning techniques. In a comprehensive experimental performance analysis we compare our exact solution procedure with all available branch-and-bound algorithms for partially renewable resources. Additionally, we investigate a directly derived priority rule-based approximation method from our new enumeration scheme. The results of the computational study demonstrate the efficiency of our branch-and-bound algorithm and reveal that the derived approximation method is only suited to solve small- and medium-sized instances.


  • Open Access

    A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints

    by Kai Watermeyer, Jürgen Zimmermann

    The concept of partially renewable resources provides a general modeling framework that can be used for a wide range of different real-life applications. In this paper, we consider a resource-constrained project duration problem with partially renewable resources, where the temporal constraints between the activities are given by minimum and maximum time lags. We present a new branch-and-bound algorithm for this problem, which is based on a stepwise decomposition of the possible resource consumptions by the activities of the project. It is shown that the new approach results in a polynomially bounded depth of the enumeration tree, which is obtained by kind of a binary search. In a comprehensive experimental performance analysis, we compare our exact solution procedure with all branch-and-bound algorithms and state-of-the-art heuristics from the literature on different benchmark sets. The results of the performance study reveal that our branch-and-bound algorithm clearly outperforms all exact solution procedures. Furthermore, it is shown that our new approach dominates the state-of-the-art heuristics on well known benchmark instances.


  • Open Access

    Engineering Human–Machine Teams for Trusted Collaboration

    by Basel Alhaji, Janine Beecken, Rüdiger Ehlers, Jan Gertheiss, Felix Merz, Jörg P. Müller, Michael Prilla, Andreas Rausch, Andreas Reinhardt, Delphine Reinhardt, et al.

    The way humans and artificially intelligent machines interact is undergoing a dramatic change. This change becomes particularly apparent in domains where humans and machines collaboratively work on joint tasks or objects in teams, such as in industrial assembly or disassembly processes. While there is intensive research work on human–machine collaboration in different research disciplines, systematic and interdisciplinary approaches towards engineering systems that consist of or comprise human–machine teams are still rare. In this paper, we review and analyze the state of the art, and derive and discuss core requirements and concepts by means of an illustrating scenario. In terms of methods, we focus on how reciprocal trust between humans and intelligent machines is defined, built, measured, and maintained from a systems engineering and planning perspective in literature. Based on our analysis, we propose and outline three important areas of future research on engineering and operating human–machine teams for trusted collaboration. For each area, we describe exemplary research opportunities.


  • Open Access

    A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints

    by Kai Watermeyer, Jürgen Zimmermann

    In this paper, we consider the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. For the first time, the concept of partially renewable resources is embedded in the context of projects with general temporal constraints. While partially renewable resources have already broadened the area of applications for project scheduling, the extension by general temporal constraints allows to consider even more relevant aspects of real projects. We present a branch-and-bound procedure for the problem with the objective to minimize the project duration. To improve the performance of the solution procedure, new consistency tests, lower bounds, and dominance rules are developed. Furthermore, new temporal planning procedures, based on forbidden start times of activities, are presented which can be used for any project scheduling problem with general temporal constraints independent on the considered resource type. In a performance analysis, we compare our branch-and-bound procedure with the mixed-integer linear programming solver IBM CPLEX 12.8.0 on adaptations of benchmark instances from the literature. In addition, we compare our solution procedure with the only available branch-and-bound procedure for partially renewable resources. The results of the computational experiments prove the efficiency of our branch-and-bound procedure.


  • Open Access

    A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems

    by Alexander Franz, Julia Rieck, Jürgen Zimmermann

    The paper describes a long-term scheduling problem for thermal power plants and energy storages. In addition, renewable energy sources are integrated by considering the residual demand. Besides the classical minimization of the production costs, emission-related costs are taken into account. Thereby, emission costs are determined by market prices for $$\hbox {CO}_2$$CO2 emission certificates (i.e., using the EU emissions trading system). For the proposed unit commitment problem with hydrothermal coordination for economic and emission control, an enhanced mixed-integer linear programming model is presented. Moreover, a new heuristic approach is developed, which consists of two solution stages. The heuristic first performs an isolated dispatching of thermal plants. Then, a re-optimization stage is included in order to embed activities of energy storages into the final solution schedule. The considered approach is able to find outstanding schedules for benchmark instances with a planning horizon of up to one year. Furthermore, promising results are also obtained for large-scale real-world electricity systems. For the German electricity market, the relationship of $$\hbox {CO}_2$$CO2 certificate prices and the optimal thermal dispatch is illustrated by a comprehensive sensitivity analysis.


  • Machine scheduling in underground mining: an application in the potash industry

    by Marco Schulze, Julia Rieck, Cinna Seifi, Jürgen Zimmermann