John J. Bowders
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
John J. Bowders has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Abdelmalek Bouazza
Professor, Dept. of Civil Engineering, Monash Univ., Building 60, Melbourne, Vic. 3800, Australia
3 shared publications Deepak Neupane
2 shared publicationsJ. Erik Loehr
2 shared publicationsDaniel R. Huaco
Assistant Professor, Civil & Environmental Engineering, University of Arkansas, Fayetteville, Arkansas
1 shared publication- Hossam M. Abuel-Naga
Senior Lecturer, Dept. of Civil and Environmental Engineering, Univ. of Auckland, Private Bag 92019, Auckland 1142, New Zealand
1 shared publication - J. D. Quaranta
West Virginia Water Research Institute, National Research Center for Coal and Energy, West Virginia University PO Box 6064, Morgantown, WV 26506-6064, USA Telephone: +1 304 293 2867, Telefax: +1 304 293 7822
1 shared publication
Latest Publications
- 15 February 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 3305-3314
GeoWall: Creativity, Statistics, and Reliability
GeoWall is a national competition to construct a model-scale reinforced soil wall using paper reinforcing with a poster board facing element. The objective is to optimize the "design," construct the wall, load test it and write a forensic analysis paper on the performance. The GeoWall project provides a manageable, hands-on activity for civil engineering students to begin to develop a sense of engineering analysis, design, construction, evaluation and decision making and has been adapted for inclusion in an introductory civil engineering course. Developing the tests to physically measure the engineering properties involves creativity of the team members. Statistical analysis of the combined class measurements provides practice with probability, distributions and Excel®. Design of the reinforcement for the GeoWall provides an early opportunity for students to practice simple design skills and for managing team-work and communication. It also incorporates reliability analysis into the report writing. The competition of building and testing the physical model of the GeoWall presents the teams with a pseudo-practice construction environment where time, materials, design, craftsmanship and communication skills are required. Testing of the model wall provides some validation of the design but in most cases presents more opportunities for forensic analysis and discovery. The post-wall test forensics report provides the opportunity for students to reflect on their experiences, their designs and to assess not only the success or failure of their design but also the accuracy of their reliability analyses. Project implementation is the focus of this article.
- 15 February 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 3305-3314
GeoWall: Creativity, Statistics, and Reliability
GeoWall is a national competition to construct a model-scale reinforced soil wall using paper reinforcing with a poster board facing element. The objective is to optimize the "design," construct the wall, load test it and write a forensic analysis paper on the performance. The GeoWall project provides a manageable, hands-on activity for civil engineering students to begin to develop a sense of engineering analysis, design, construction, evaluation and decision making and has been adapted for inclusion in an introductory civil engineering course. Developing the tests to physically measure the engineering properties involves creativity of the team members. Statistical analysis of the combined class measurements provides practice with probability, distributions and Excel®. Design of the reinforcement for the GeoWall provides an early opportunity for students to practice simple design skills and for managing team-work and communication. It also incorporates reliability analysis into the report writing. The competition of building and testing the physical model of the GeoWall presents the teams with a pseudo-practice construction environment where time, materials, design, craftsmanship and communication skills are required. Testing of the model wall provides some validation of the design but in most cases presents more opportunities for forensic analysis and discovery. The post-wall test forensics report provides the opportunity for students to reflect on their experiences, their designs and to assess not only the success or failure of their design but also the accuracy of their reliability analyses. Project implementation is the focus of this article.
- 1 June 2008
- Published by Emerald Publishing in Geosynthetics International
- Vol. 15 (3) , 216-223
Numerical evaluation of prefabricated vertical drain enhanced soil vapour extraction system
The aim of this study is to investigate numerically the performance of a prefabricated vertical drain (PVD) as a soil vapour extraction well, and the pattern of the induced air flow. A validated numerical model for a single PVD extraction well is developed based on the result of a well-designed laboratory air-pumping test. The results of the validated numerical model are used to evaluate the flow efficiency of a PVD extraction well. The validity of the simple analytical approach to determine air permeability based on the results of air-pumping tests is also discussed. The output of this study highlights the influence of PVD well resistance on the overall performance of soil vapour extraction systems, and the effect of the PVD's oblong cross-section on the air flow characteristics.
- 1 June 2008
- Published by Emerald Publishing in Geosynthetics International
- Vol. 15 (3) , 216-223
Numerical evaluation of prefabricated vertical drain enhanced soil vapour extraction system
The aim of this study is to investigate numerically the performance of a prefabricated vertical drain (PVD) as a soil vapour extraction well, and the pattern of the induced air flow. A validated numerical model for a single PVD extraction well is developed based on the result of a well-designed laboratory air-pumping test. The results of the validated numerical model are used to evaluate the flow efficiency of a PVD extraction well. The validity of the simple analytical approach to determine air permeability based on the results of air-pumping tests is also discussed. The output of this study highlights the influence of PVD well resistance on the overall performance of soil vapour extraction systems, and the effect of the PVD's oblong cross-section on the air flow characteristics.
- 1 June 2008
- Published by Emerald Publishing in Geosynthetics International
- Vol. 15 (3) , 205-215
Performance modeling and optimization of contaminant extraction using prefabricated vertical wells (PVWs)
Well injection depth extraction (WIDE) is a hybrid in situ subsurface remediation technology applicable for liquid and gas extraction in fine-grained soils. A finite element model is developed to study the impact of the extraction process, using WIDE, on the groundwater head distribution and contaminant transport. An optimization process is employed to develop an operating schedule to control groundwater elevations and therefore improve removal efficiency of a given contaminant phase. The model results showed that groundwater elevation was lowered at the rate of approximately 30 mm/h at an extraction rate of 0.125 m3/h. The transport model is analyzed for three scenarios: (1) applying a continuous source of benzene concentration to provide information on the required time for mobilization of benzene due to the presence of a constant source at the top of the water table; (2) applying an initial pulse concentration of benzene at the top of the groundwater table to show the reduction rate of soluble benzene concentration with time, once the liquid free product is removed, and the soluble phase is removed from within the sand seam but remains above it in the lower-permeability layer; and (3) applying a uniform distribution of the soluble phase of benzene within the geologic medium between the wells to investigate progressive contaminant removal from the hydro-geologic domain, given that groundwater is contaminated with soluble phase. Effluent concentration equal to the initially assumed constant source of 0.3 mg/L of benzene leaking into a 0.08 m thick sand lens was obtained after 18 h of system operation. On the other hand, once the source ceased to exist, and considering an initial pulse concentration of benzene on top of the groundwater level, 125 h of continuous system operation was needed to lower the benzene concentration to less than 0.005 mg/L (maximum concentration level for drinking water standards) within the flow domain. Results from the optimization study showed that an operation schedule of 3 h ‘on’ and 21 h ‘off’ can enhance the efficiency of WIDE extraction of subsurface contaminants in various phases.
- 1 June 2008
- Published by Emerald Publishing in Geosynthetics International
- Vol. 15 (3) , 205-215
Performance modeling and optimization of contaminant extraction using prefabricated vertical wells (PVWs)
Well injection depth extraction (WIDE) is a hybrid in situ subsurface remediation technology applicable for liquid and gas extraction in fine-grained soils. A finite element model is developed to study the impact of the extraction process, using WIDE, on the groundwater head distribution and contaminant transport. An optimization process is employed to develop an operating schedule to control groundwater elevations and therefore improve removal efficiency of a given contaminant phase. The model results showed that groundwater elevation was lowered at the rate of approximately 30 mm/h at an extraction rate of 0.125 m3/h. The transport model is analyzed for three scenarios: (1) applying a continuous source of benzene concentration to provide information on the required time for mobilization of benzene due to the presence of a constant source at the top of the water table; (2) applying an initial pulse concentration of benzene at the top of the groundwater table to show the reduction rate of soluble benzene concentration with time, once the liquid free product is removed, and the soluble phase is removed from within the sand seam but remains above it in the lower-permeability layer; and (3) applying a uniform distribution of the soluble phase of benzene within the geologic medium between the wells to investigate progressive contaminant removal from the hydro-geologic domain, given that groundwater is contaminated with soluble phase. Effluent concentration equal to the initially assumed constant source of 0.3 mg/L of benzene leaking into a 0.08 m thick sand lens was obtained after 18 h of system operation. On the other hand, once the source ceased to exist, and considering an initial pulse concentration of benzene on top of the groundwater level, 125 h of continuous system operation was needed to lower the benzene concentration to less than 0.005 mg/L (maximum concentration level for drinking water standards) within the flow domain. Results from the optimization study showed that an operation schedule of 3 h ‘on’ and 21 h ‘off’ can enhance the efficiency of WIDE extraction of subsurface contaminants in various phases.
- 9 October 2005
- Published by American Society of Civil Engineers (ASCE)
- p. 1-15
Field Performance of an Asphalt Barrier Test Pad
A field study of asphalt concrete and fluid applied asphalt - geotextile (FAA/GT) was undertaken to evaluate their suitability as a barrier (liner/cover) material in waste containment applications. A test pad consisting of 2–3 mm thick FAA/GT and 10–15 cm thick asphalt cement concrete was designed, constructed using full-scale asphalt paving equipment and its performance monitored. The in situ hydraulic conductivity of the barrier was measured using sealed, double-ring infiltrometers. Core and large block samples were taken from the test pad and analyzed in the laboratory under several conditions including: immediately after compaction, after aging for up to three years and after deformation. The in situ hydraulic conductivity of the barrier was 1 x 10–9 cm/s to 1 x 10–10 cm/s. The conductivity range represents the lower limit of quantifiable conductivities with the in situ testing equipment. The laboratory-measured hydraulic conductivity of the specimens sampled immediately after compaction was 1 x 10–10 cm to 1 x 10–11 cm/s. The hydraulic conductivities of the same specimens were re-evaluated twice after exposing them to the ambient temperature in the laboratory for a period up to three years. No change in hydraulic conductivity was observed during this period. Beams of aged asphalt concrete were subjected to three point bending to impart distortions in the range from 1/500 to 1/25. Though observable cracks developed in the beam that underwent the maximum distortion of 1/25, there was no appreciable effect on the hydraulic conductivity. The hydraulic conductivity of the asphalt barrier design used in this test pad was uncompromised by aging of 3 years and distortions up to 1/25. Based on the results of the testing performed, asphalt concrete combined with fluid applied asphalt - geotextile proved to be an effective barrier when designed and constructed with low hydraulic conductivity as a goal.
- 9 October 2005
- Published by American Society of Civil Engineers (ASCE)
- p. 1-15
Field Performance of an Asphalt Barrier Test Pad
A field study of asphalt concrete and fluid applied asphalt - geotextile (FAA/GT) was undertaken to evaluate their suitability as a barrier (liner/cover) material in waste containment applications. A test pad consisting of 2–3 mm thick FAA/GT and 10–15 cm thick asphalt cement concrete was designed, constructed using full-scale asphalt paving equipment and its performance monitored. The in situ hydraulic conductivity of the barrier was measured using sealed, double-ring infiltrometers. Core and large block samples were taken from the test pad and analyzed in the laboratory under several conditions including: immediately after compaction, after aging for up to three years and after deformation. The in situ hydraulic conductivity of the barrier was 1 x 10–9 cm/s to 1 x 10–10 cm/s. The conductivity range represents the lower limit of quantifiable conductivities with the in situ testing equipment. The laboratory-measured hydraulic conductivity of the specimens sampled immediately after compaction was 1 x 10–10 cm to 1 x 10–11 cm/s. The hydraulic conductivities of the same specimens were re-evaluated twice after exposing them to the ambient temperature in the laboratory for a period up to three years. No change in hydraulic conductivity was observed during this period. Beams of aged asphalt concrete were subjected to three point bending to impart distortions in the range from 1/500 to 1/25. Though observable cracks developed in the beam that underwent the maximum distortion of 1/25, there was no appreciable effect on the hydraulic conductivity. The hydraulic conductivity of the asphalt barrier design used in this test pad was uncompromised by aging of 3 years and distortions up to 1/25. Based on the results of the testing performed, asphalt concrete combined with fluid applied asphalt - geotextile proved to be an effective barrier when designed and constructed with low hydraulic conductivity as a goal.
- 1 March 2003
- Published by American Society of Civil Engineers (ASCE) in Journal of Geotechnical and Geoenvironmental Engineering
- Vol. 129 (3) , 219-223
Construction Quality Control for Asphalt Concrete Hydraulic Barriers
Asphalt concrete has been used for low permeability barriers in numerous applications over many centuries. In recent times, asphalt concrete barriers have been used for waste containment applications. The hydraulic conductivity of asphalt concrete specimens can be measured in the laboratory; however, there is no expedient, efficient way of accurately measuring the in situ hydraulic conductivity of low permeability asphalt concrete shortly after its placement and compaction in the field. A method has been developed to efficiently check the in situ hydraulic conductivity of asphalt concrete in the field. Asphalt concrete specimens with varying asphalt cement contents and unit weights were prepared in the laboratory and their hydraulic conductivity measured. The measured hydraulic conductivity data were grouped into different ranges and plotted as a function of unit weight and asphalt cement content. An acceptable zone was specified for a combination of asphalt cement content and unit weight that resulted in a specified hydraulic conductivity. In the field, a quality control inspector can check the unit weight and asphalt cement content of the in-place barrier to make sure it lies within the acceptable zone. The asphalt cement content and unit weight can be readily measured, thereby allowing rapid acceptance or rejection of the asphalt concrete barrier shortly after compaction.
- 1 March 2003
- Published by American Society of Civil Engineers (ASCE) in Journal of Geotechnical and Geoenvironmental Engineering
- Vol. 129 (3) , 219-223
Construction Quality Control for Asphalt Concrete Hydraulic Barriers
Asphalt concrete has been used for low permeability barriers in numerous applications over many centuries. In recent times, asphalt concrete barriers have been used for waste containment applications. The hydraulic conductivity of asphalt concrete specimens can be measured in the laboratory; however, there is no expedient, efficient way of accurately measuring the in situ hydraulic conductivity of low permeability asphalt concrete shortly after its placement and compaction in the field. A method has been developed to efficiently check the in situ hydraulic conductivity of asphalt concrete in the field. Asphalt concrete specimens with varying asphalt cement contents and unit weights were prepared in the laboratory and their hydraulic conductivity measured. The measured hydraulic conductivity data were grouped into different ranges and plotted as a function of unit weight and asphalt cement content. An acceptable zone was specified for a combination of asphalt cement content and unit weight that resulted in a specified hydraulic conductivity. In the field, a quality control inspector can check the unit weight and asphalt cement content of the in-place barrier to make sure it lies within the acceptable zone. The asphalt cement content and unit weight can be readily measured, thereby allowing rapid acceptance or rejection of the asphalt concrete barrier shortly after compaction.
- 24 July 2000
- Published by American Society of Civil Engineers (ASCE)
Shear Behavior of Compacted Silty Loess
Loess, a uniform-sized, wind-blown, cohesive soil can be problematic in geotechnical engineering applications. Natural deposits have high strength and exhibit stable vertical slopes; however, dramatic collapse can occur when loess becomes saturated. In remolded, compacted applications, the behavior of loess is less well known. Regionally (central USA), embankments of compacted loess can exhibit deformation and slope failure after years of service. The initial phase of a larger effort to characterize the strength behavior of compacted loess is reported herein. This phase is limited to assessing the short-term, undrained shear strength of compacted loess. Undrained strengths of compacted loess were measured to be up to 500 to 650 kPa. Higher compactive effort, dry of optimum water content, maximizes the undrained strength. Modified Proctor energy increased undrained shear strength by up to 2.5 to 3.0 times higher than loess compacted at the same water contents using standard energy. Loess compacted at or greater than optimum moisture content, as determined in the standard Proctor test, had similar undrained strength (100 to 200 kPa) regardless of the compactive effort. In order to maximize short term strength of compacted loess, use the greatest compactive effort and compact the soil well dry of optimum moisture content.
- 24 July 2000
- Published by American Society of Civil Engineers (ASCE)
Shear Behavior of Compacted Silty Loess
Loess, a uniform-sized, wind-blown, cohesive soil can be problematic in geotechnical engineering applications. Natural deposits have high strength and exhibit stable vertical slopes; however, dramatic collapse can occur when loess becomes saturated. In remolded, compacted applications, the behavior of loess is less well known. Regionally (central USA), embankments of compacted loess can exhibit deformation and slope failure after years of service. The initial phase of a larger effort to characterize the strength behavior of compacted loess is reported herein. This phase is limited to assessing the short-term, undrained shear strength of compacted loess. Undrained strengths of compacted loess were measured to be up to 500 to 650 kPa. Higher compactive effort, dry of optimum water content, maximizes the undrained strength. Modified Proctor energy increased undrained shear strength by up to 2.5 to 3.0 times higher than loess compacted at the same water contents using standard energy. Loess compacted at or greater than optimum moisture content, as determined in the standard Proctor test, had similar undrained strength (100 to 200 kPa) regardless of the compactive effort. In order to maximize short term strength of compacted loess, use the greatest compactive effort and compact the soil well dry of optimum moisture content.