Charles M. Burt
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Charles M. Burt has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
- Daniel J. Howes
Assistant Professor, Dept. of BioResource and Agricultural Engineering, Irrigation Training and Research Center, California Polytechnic State Univ., San Luis Obispo, CA 93407
5 shared publications - Kyle Feist
Senior Engineer, Irrigation Training and Research Center, California Polytechnic State Univ., San Luis Obispo, CA 93407
4 shared publications - Franklin Gaudi
Senior Engineer, Irrigation Training and Research Center, 1 Grand Ave., Bldg 8A, California Polytechnic State Univ., San Luis Obispo, CA 93407
3 shared publications - Stuart Styles
Director, Irrigation Training and Research Center, BioResource and Ag Engineering, Cal Poly State University, 1 Grand Avenue, San Luis Obispo, California, 93407
3 shared publications - Xianshu Piao
Control Specialist, Irrigation Training and Research Center, California Polytechnic State Univ., San Luis Obispo, CA 93407
3 shared publications A. J. Mutziger
Chairman, Irrigation Training and Research Center (ITRC), BioResource and Agricultural Engineering Department, California Polytechnic State Univ., San Luis Obispo, CA 93407
2 shared publications
Latest Publications
- 1 June 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 144 (6)
Accelerated Irrigation Canal Flow Change Routing
In a traditional automated upstream controlled canal with a downstream buffer reservoir, the process to fill the buffer reservoir requires one step: the inflow to the canal is increased, and the flow change eventually arrives at the buffer reservoir. This paper describes an attempt to shorten the time necessary to stabilize the new flow rate at the buffer reservoir. The method requires calculated, remote manual adjustments to all the canal check structure gate positions in addition to two flow rate changes made at the head of the canal, followed by a return to automated upstream control. The method was tested in the Upper Main Canal of the Central California Irrigation District both through simulation and in the field. With a canal flow of approximately 20% of the maximum, simulation modeling predicted that a flow rate change arrival at the reservoir would be about 5.5 h in a typical operation, with final stabilization in about 16 h. Simulation of an improved procedure indicated an almost instantaneous increase in flow at the reservoir of half the flow change, with final flow stabilization at 11 h. The field test resulted in almost the full flow change arriving at the reservoir after about 20 min, with gradual stabilization occurring over the next 11 h. Important differences between simulation and actual results are discussed.
- 1 June 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 144 (6)
Accelerated Irrigation Canal Flow Change Routing
In a traditional automated upstream controlled canal with a downstream buffer reservoir, the process to fill the buffer reservoir requires one step: the inflow to the canal is increased, and the flow change eventually arrives at the buffer reservoir. This paper describes an attempt to shorten the time necessary to stabilize the new flow rate at the buffer reservoir. The method requires calculated, remote manual adjustments to all the canal check structure gate positions in addition to two flow rate changes made at the head of the canal, followed by a return to automated upstream control. The method was tested in the Upper Main Canal of the Central California Irrigation District both through simulation and in the field. With a canal flow of approximately 20% of the maximum, simulation modeling predicted that a flow rate change arrival at the reservoir would be about 5.5 h in a typical operation, with final stabilization in about 16 h. Simulation of an improved procedure indicated an almost instantaneous increase in flow at the reservoir of half the flow change, with final flow stabilization at 11 h. The field test resulted in almost the full flow change arriving at the reservoir after about 20 min, with gradual stabilization occurring over the next 11 h. Important differences between simulation and actual results are discussed.
- 31 May 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 36-49
Case Study: Managing Center Pivot Irrigation Using Municipal Reclaimed Water
Secondary and tertiary treated municipal wastewater has been used to irrigate alfalfa and grains on approximately 4,000 acres in Southern California via center pivots. In addition to coordinating fluctuating treated water supply and crop demands, this program has focused on balancing two competing goals: (a) maximizing crop yield and (b) maintaining compliance with relatively strict environmental discharge permit requirements that limit the transport of nutrients, such as nitrates, past the root zone. For example, minimizing nitrate movement through precise irrigation promotes salts accumulation in the root zone. Subsequently, crop yield and nutrient uptake rates are impacted. In that context a combination of good management strategies, excellent irrigation hardware, and the selective use of technology have proven to be essential tools for success. This paper will detail some of the short and long-term challenges of managing soil health and crop production under local regulatory obligations.
- 31 May 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 36-49
Case Study: Managing Center Pivot Irrigation Using Municipal Reclaimed Water
Secondary and tertiary treated municipal wastewater has been used to irrigate alfalfa and grains on approximately 4,000 acres in Southern California via center pivots. In addition to coordinating fluctuating treated water supply and crop demands, this program has focused on balancing two competing goals: (a) maximizing crop yield and (b) maintaining compliance with relatively strict environmental discharge permit requirements that limit the transport of nutrients, such as nitrates, past the root zone. For example, minimizing nitrate movement through precise irrigation promotes salts accumulation in the root zone. Subsequently, crop yield and nutrient uptake rates are impacted. In that context a combination of good management strategies, excellent irrigation hardware, and the selective use of technology have proven to be essential tools for success. This paper will detail some of the short and long-term challenges of managing soil health and crop production under local regulatory obligations.
- 1 July 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 143 (7)
Influence of Supply-Channel Velocity on Farm Delivery Meter Gate Flow Measurement
The work presented here is an extension of previous papers that updated the calibration of round (Armco-type) meter gates (three sizes: 0.30, 0.46, and 0.61 m), developed ratings for rectangular gates (two sizes: 0.46 and 0.61 m) on round pipes, and examined errors and uncertainty related to using these devices for water discharge measurement. Previous works examined gate discharge ratings under low supply-channel flow velocity perpendicular to the gate discharge pipeline. Here, additional testing was conducted to test the hypothesis that higher velocities in the supply channel would show decreased meter gate flow compared to the low-velocity ratings, but that the published gate calibration method would still yield accurate flow-rate calculations. All testing was conducted in a test facility with the gate discharge pipe set perpendicular to the supply channel, as is common in field installations. Velocities up to ( ) were tested with the smaller gate and ( ) for all other gates. These velocities are on the upper end of velocities found in common earthen irrigation canals (and in many lined channels at the farm delivery level) in California. Interestingly, results indicate that the Froude number of the supply-channel flow did not have a statistically significant (at an -level of 0.01) influence on gate discharge coefficients. Discharge percent error and uncertainty were examined to compare the discharge coefficients presented in the literature to the discharge measured during the testing at different supply-channel velocities. Under recommended operating conditions, the uncertainty was within without adjustments for supply-channel velocity. This extended work supports earlier recommendations that meter gates can be an accurate flow measurement device for farm water delivery flow measurement if installed and operated correctly.- 1 July 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 143 (7)
Influence of Supply-Channel Velocity on Farm Delivery Meter Gate Flow Measurement
The work presented here is an extension of previous papers that updated the calibration of round (Armco-type) meter gates (three sizes: 0.30, 0.46, and 0.61 m), developed ratings for rectangular gates (two sizes: 0.46 and 0.61 m) on round pipes, and examined errors and uncertainty related to using these devices for water discharge measurement. Previous works examined gate discharge ratings under low supply-channel flow velocity perpendicular to the gate discharge pipeline. Here, additional testing was conducted to test the hypothesis that higher velocities in the supply channel would show decreased meter gate flow compared to the low-velocity ratings, but that the published gate calibration method would still yield accurate flow-rate calculations. All testing was conducted in a test facility with the gate discharge pipe set perpendicular to the supply channel, as is common in field installations. Velocities up to ( ) were tested with the smaller gate and ( ) for all other gates. These velocities are on the upper end of velocities found in common earthen irrigation canals (and in many lined channels at the farm delivery level) in California. Interestingly, results indicate that the Froude number of the supply-channel flow did not have a statistically significant (at an -level of 0.01) influence on gate discharge coefficients. Discharge percent error and uncertainty were examined to compare the discharge coefficients presented in the literature to the discharge measured during the testing at different supply-channel velocities. Under recommended operating conditions, the uncertainty was within without adjustments for supply-channel velocity. This extended work supports earlier recommendations that meter gates can be an accurate flow measurement device for farm water delivery flow measurement if installed and operated correctly.- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 409-423
Case Study: West Stanislaus Irrigation District Modernization
West Stanislaus Irrigation District (WSID) provides agricultural irrigation water to about 22,000 acres in the San Joaquin Valley. The majority of WSID’s water is diverted directly from the San Joaquin River, with supplemental water obtained from the Delta-Mendota Canal (DMC), groundwater wells, and a variety of other sources. WSID operates a series of pumping plants that lift water from the San Joaquin River sequentially into six short canal reaches. Each main canal pool supplies one or two laterals along the valley contour. Water from the DMC enters the district via a gravity pipeline at the tail end of the main canal. Water supply curtailments, regulatory changes, and significant increases in drip/micro irrigated acreage have steered the district and its board members towards modernization of its original 1920s-era infrastructure. To that end, the Cal Poly Irrigation Training and Research Center (ITRC) has worked in cooperation with WSID since the early 2000s on a phased modernization planning and implementation process. Following a Main Canal Modernization Study, significant improvements have been executed along the main canal including the automation of all original pumping plants and lateral headings as well as the construction of two new, automated pumping plants. An industrial-grade Supervisory Control and Data Acquisition (SCADA) system has also been commissioned. Further project planning is underway at the San Joaquin River diversion and throughout the lateral canal system. This paper describes the modernization process and results. Lessons learned throughout the various projects are also discussed.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 409-423
Case Study: West Stanislaus Irrigation District Modernization
West Stanislaus Irrigation District (WSID) provides agricultural irrigation water to about 22,000 acres in the San Joaquin Valley. The majority of WSID’s water is diverted directly from the San Joaquin River, with supplemental water obtained from the Delta-Mendota Canal (DMC), groundwater wells, and a variety of other sources. WSID operates a series of pumping plants that lift water from the San Joaquin River sequentially into six short canal reaches. Each main canal pool supplies one or two laterals along the valley contour. Water from the DMC enters the district via a gravity pipeline at the tail end of the main canal. Water supply curtailments, regulatory changes, and significant increases in drip/micro irrigated acreage have steered the district and its board members towards modernization of its original 1920s-era infrastructure. To that end, the Cal Poly Irrigation Training and Research Center (ITRC) has worked in cooperation with WSID since the early 2000s on a phased modernization planning and implementation process. Following a Main Canal Modernization Study, significant improvements have been executed along the main canal including the automation of all original pumping plants and lateral headings as well as the construction of two new, automated pumping plants. An industrial-grade Supervisory Control and Data Acquisition (SCADA) system has also been commissioned. Further project planning is underway at the San Joaquin River diversion and throughout the lateral canal system. This paper describes the modernization process and results. Lessons learned throughout the various projects are also discussed.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 424-438
Improving Flow Measurement Accuracy Using a Portable Irrigation Turnout Calibration Unit
Relatively accurate flow measurement at irrigation district water delivery points is an important component of volumetric billing and equitable service. In California, this has often occurred with conversions to pressurized irrigation systems which commonly include the installation of pipeline flow meters as part of the on-farm system. However, a large portion of irrigation turnouts in the western U.S. continue to operate via gravity and fall into one of the following categories: (a) a metergate, or similar structure was installed without adherence to standard construction requirements, or (b) the structure was never intended for flow measurement. For these and other scenarios, there is a need to efficiently calibrate turnouts in the field. While some in-situ calibration methods exist for open channel turnouts, they are rarely applied in the field for a variety of practical reasons. After identifying this gap in field-practice, a special pump, or portable irrigation turnout calibration unit (calibration unit) was designed and constructed at the Cal Poly Irrigation Training and Research Center (ITRC). Within six weeks, thirty-two field turnout calibrations were performed using the Calibration Unit throughout seven California irrigation districts. Field testing protocol followed new guidelines developed by the USBR Mid Pacific Region and the California Department of Water Resources (DWR). The results and analyses of these calibrations are presented in this paper. Practical applications, such as compliance with California regulations developed out of The Water Conservation Act of 2009 (SB X7-7) and constraints of this new calibration method are also discussed.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 424-438
Improving Flow Measurement Accuracy Using a Portable Irrigation Turnout Calibration Unit
Relatively accurate flow measurement at irrigation district water delivery points is an important component of volumetric billing and equitable service. In California, this has often occurred with conversions to pressurized irrigation systems which commonly include the installation of pipeline flow meters as part of the on-farm system. However, a large portion of irrigation turnouts in the western U.S. continue to operate via gravity and fall into one of the following categories: (a) a metergate, or similar structure was installed without adherence to standard construction requirements, or (b) the structure was never intended for flow measurement. For these and other scenarios, there is a need to efficiently calibrate turnouts in the field. While some in-situ calibration methods exist for open channel turnouts, they are rarely applied in the field for a variety of practical reasons. After identifying this gap in field-practice, a special pump, or portable irrigation turnout calibration unit (calibration unit) was designed and constructed at the Cal Poly Irrigation Training and Research Center (ITRC). Within six weeks, thirty-two field turnout calibrations were performed using the Calibration Unit throughout seven California irrigation districts. Field testing protocol followed new guidelines developed by the USBR Mid Pacific Region and the California Department of Water Resources (DWR). The results and analyses of these calibrations are presented in this paper. Practical applications, such as compliance with California regulations developed out of The Water Conservation Act of 2009 (SB X7-7) and constraints of this new calibration method are also discussed.
- 1 January 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 142 (1)
Accuracy of Round Meter Gates for On-Farm Deliveries
Recent California legislation requires irrigation water agencies larger than 25,000 acres to measure volumetric water deliveries within specified levels of relative uncertainty. Although the meter gate is one of the most widely used flow measurement devices in California, little investigation has been conducted into the accuracy, limitations, and uncertainties of the rating tables developed over 60 years ago. A meter gate testing facility was constructed at the Cal Poly Irrigation Training and Research Center’s Water Resources Facility capable of testing gates up to 0.76 m (30 in.). The facility was constructed with gates oriented perpendicular to the supply channel flow to match actual field conditions. Three commonly used gate sizes of 0.30 m (12 in.), 0.46 m (18 in.), and 0.61 m (24 in.) were examined under a variety of upstream head, head loss, and gate opening conditions. Based on the limitations, guidelines are included to assist users and lower the uncertainty of these devices. It was found...
- 1 January 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 142 (1)
Accuracy of Round Meter Gates for On-Farm Deliveries
Recent California legislation requires irrigation water agencies larger than 25,000 acres to measure volumetric water deliveries within specified levels of relative uncertainty. Although the meter gate is one of the most widely used flow measurement devices in California, little investigation has been conducted into the accuracy, limitations, and uncertainties of the rating tables developed over 60 years ago. A meter gate testing facility was constructed at the Cal Poly Irrigation Training and Research Center’s Water Resources Facility capable of testing gates up to 0.76 m (30 in.). The facility was constructed with gates oriented perpendicular to the supply channel flow to match actual field conditions. Three commonly used gate sizes of 0.30 m (12 in.), 0.46 m (18 in.), and 0.61 m (24 in.) were examined under a variety of upstream head, head loss, and gate opening conditions. Based on the limitations, guidelines are included to assist users and lower the uncertainty of these devices. It was found...
- 1 January 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 142 (1)
Rating Rectangular Farm Delivery Meter Gates for Flow Measurement
Traditional meter gates for farm delivery flow measurement from an open channel conveyance have traditionally incorporated round canal gates (Armco type) for control. In recent years, some irrigation water agencies (i.e., irrigation districts) have replaced deteriorating round gates with lower-cost rectangular gates that cover round holes. Similar to the situation described in a companion paper, where round gates were examined, there have been no investigations into flow measurement uncertainty using the existing rating tables for these gates. In this study, two commonly used rectangular gate sizes, 0.46 m (18-in.) and 0.61 m (24-in.), were tested under scenarios of various gate openings, upstream heads, and head differences. Coefficient of discharge (Cd) values were computed based on actual gate open areas. These improved Cd values were used to generate new discharge rating tables for 0.46 m (18-in.) and 0.61 m (24-in.) rectangular meter gates. Limitations for these rectangular gates are discusse...
- 1 January 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 142 (1)
Rating Rectangular Farm Delivery Meter Gates for Flow Measurement
Traditional meter gates for farm delivery flow measurement from an open channel conveyance have traditionally incorporated round canal gates (Armco type) for control. In recent years, some irrigation water agencies (i.e., irrigation districts) have replaced deteriorating round gates with lower-cost rectangular gates that cover round holes. Similar to the situation described in a companion paper, where round gates were examined, there have been no investigations into flow measurement uncertainty using the existing rating tables for these gates. In this study, two commonly used rectangular gate sizes, 0.46 m (18-in.) and 0.61 m (24-in.), were tested under scenarios of various gate openings, upstream heads, and head differences. Coefficient of discharge (Cd) values were computed based on actual gate open areas. These improved Cd values were used to generate new discharge rating tables for 0.46 m (18-in.) and 0.61 m (24-in.) rectangular meter gates. Limitations for these rectangular gates are discusse...
- 1 January 2015
- Published by Springer Nature
- p. 169-187
Hierarchical MPC-Based Control of an Irrigation Canal
- 1 January 2015
- Published by Springer Nature
- p. 169-187
Hierarchical MPC-Based Control of an Irrigation Canal
- 9 September 2014
- Published by Springer Nature in Water Resources Management
- Vol. 28 (14) , 4999-5019
Hierarchical Operation of Water Level Controllers: Formal Analysis and Application on a Large Scale Irrigation Canal
- 9 September 2014
- Published by Springer Nature in Water Resources Management
- Vol. 28 (14) , 4999-5019
Hierarchical Operation of Water Level Controllers: Formal Analysis and Application on a Large Scale Irrigation Canal
- 1 May 2013
- Published by Wiley in Irrigation and Drainage
- Vol. 62 (3) , 247-254
THE IRRIGATION SECTOR SHIFT FROM CONSTRUCTION TO MODERNIZATION: WHAT IS REQUIRED FOR SUCCESS?
External pressures related to environmental protection, commodity prices, energy availability, larger populations, and climate change have combined to require an immediate and substantial improvement in agricultural irrigation performance. Worldwide progression towards modernized irrigation projects has been uneven and slower than desired, but decades of irrigation modernization development have clarified certain requirements for success, as well as illuminated indicators of project failure. Of particular importance are required shifts within the state and national irrigation bureaucracies, as well as universities. Copyright © 2013 John Wiley & Sons, Ltd.
- 1 May 2013
- Published by Wiley in Irrigation and Drainage
- Vol. 62 (3) , 247-254
THE IRRIGATION SECTOR SHIFT FROM CONSTRUCTION TO MODERNIZATION: WHAT IS REQUIRED FOR SUCCESS?
External pressures related to environmental protection, commodity prices, energy availability, larger populations, and climate change have combined to require an immediate and substantial improvement in agricultural irrigation performance. Worldwide progression towards modernized irrigation projects has been uneven and slower than desired, but decades of irrigation modernization development have clarified certain requirements for success, as well as illuminated indicators of project failure. Of particular importance are required shifts within the state and national irrigation bureaucracies, as well as universities. Copyright © 2013 John Wiley & Sons, Ltd.