Kyle Feist
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Kyle Feist has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Charles M. Burt
Chairman, Irrigation Training and Research Center, California Polytechnic State Univ., San Luis Obispo, CA 93407
4 shared publications - Franklin Gaudi
Senior Engineer, Irrigation Training and Research Center, 1 Grand Ave., Bldg 8A, California Polytechnic State Univ., San Luis Obispo, CA 93407
1 shared publication - Robert Pierce
California Polytechnic State Univ
1 shared publication Stuart Styles
Director, Irrigation Training and Research Center, 1 Grand Ave., Bldg. 8A, California Polytechnic State Univ., San Luis Obispo, CA 93407
1 shared publication- Stuart Styles
Director, Irrigation Training and Research Center, BioResource and Ag Engineering, Cal Poly State University, 1 Grand Avenue, San Luis Obispo, California, 93407
1 shared publication Tom Mastin
Faculty, BioResource Agricultural Engineering Dept., 1 Grand Ave., Bldg. 8A, California Polytechnic State Univ., San Luis Obispo, CA 93407
1 shared publication
Latest Publications
- 1 June 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 144 (6)
Accelerated Irrigation Canal Flow Change Routing
In a traditional automated upstream controlled canal with a downstream buffer reservoir, the process to fill the buffer reservoir requires one step: the inflow to the canal is increased, and the flow change eventually arrives at the buffer reservoir. This paper describes an attempt to shorten the time necessary to stabilize the new flow rate at the buffer reservoir. The method requires calculated, remote manual adjustments to all the canal check structure gate positions in addition to two flow rate changes made at the head of the canal, followed by a return to automated upstream control. The method was tested in the Upper Main Canal of the Central California Irrigation District both through simulation and in the field. With a canal flow of approximately 20% of the maximum, simulation modeling predicted that a flow rate change arrival at the reservoir would be about 5.5 h in a typical operation, with final stabilization in about 16 h. Simulation of an improved procedure indicated an almost instantaneous increase in flow at the reservoir of half the flow change, with final flow stabilization at 11 h. The field test resulted in almost the full flow change arriving at the reservoir after about 20 min, with gradual stabilization occurring over the next 11 h. Important differences between simulation and actual results are discussed.
- 1 June 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 144 (6)
Accelerated Irrigation Canal Flow Change Routing
In a traditional automated upstream controlled canal with a downstream buffer reservoir, the process to fill the buffer reservoir requires one step: the inflow to the canal is increased, and the flow change eventually arrives at the buffer reservoir. This paper describes an attempt to shorten the time necessary to stabilize the new flow rate at the buffer reservoir. The method requires calculated, remote manual adjustments to all the canal check structure gate positions in addition to two flow rate changes made at the head of the canal, followed by a return to automated upstream control. The method was tested in the Upper Main Canal of the Central California Irrigation District both through simulation and in the field. With a canal flow of approximately 20% of the maximum, simulation modeling predicted that a flow rate change arrival at the reservoir would be about 5.5 h in a typical operation, with final stabilization in about 16 h. Simulation of an improved procedure indicated an almost instantaneous increase in flow at the reservoir of half the flow change, with final flow stabilization at 11 h. The field test resulted in almost the full flow change arriving at the reservoir after about 20 min, with gradual stabilization occurring over the next 11 h. Important differences between simulation and actual results are discussed.
- 31 May 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 50-61
A Review of Subsidence Measurements near Mendota, California
The image of Dr. Poland of the United States Geological Survey (USGS) standing next to a marked powerline in 1977 is circulated as a striking example of land subsidence. This and other historical data are common references for modern subsidence studies. Because of the significance of this data, recent work was conducted to analyze the historical data as well as independently measure the magnitude of subsidence since 1975, within the same study area southwest of Mendota, CA. The results indicate that local subsidence in the area of the photo is less than 0.5 meters between 1975 and 2017. Furthermore, the results identify inconsistencies that may challenge the historical certainty of some local subsidence data. Procedures and methods used in the survey will also be discussed.
- 31 May 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 50-61
A Review of Subsidence Measurements near Mendota, California
The image of Dr. Poland of the United States Geological Survey (USGS) standing next to a marked powerline in 1977 is circulated as a striking example of land subsidence. This and other historical data are common references for modern subsidence studies. Because of the significance of this data, recent work was conducted to analyze the historical data as well as independently measure the magnitude of subsidence since 1975, within the same study area southwest of Mendota, CA. The results indicate that local subsidence in the area of the photo is less than 0.5 meters between 1975 and 2017. Furthermore, the results identify inconsistencies that may challenge the historical certainty of some local subsidence data. Procedures and methods used in the survey will also be discussed.
- 31 May 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 36-49
Case Study: Managing Center Pivot Irrigation Using Municipal Reclaimed Water
Secondary and tertiary treated municipal wastewater has been used to irrigate alfalfa and grains on approximately 4,000 acres in Southern California via center pivots. In addition to coordinating fluctuating treated water supply and crop demands, this program has focused on balancing two competing goals: (a) maximizing crop yield and (b) maintaining compliance with relatively strict environmental discharge permit requirements that limit the transport of nutrients, such as nitrates, past the root zone. For example, minimizing nitrate movement through precise irrigation promotes salts accumulation in the root zone. Subsequently, crop yield and nutrient uptake rates are impacted. In that context a combination of good management strategies, excellent irrigation hardware, and the selective use of technology have proven to be essential tools for success. This paper will detail some of the short and long-term challenges of managing soil health and crop production under local regulatory obligations.
- 31 May 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 36-49
Case Study: Managing Center Pivot Irrigation Using Municipal Reclaimed Water
Secondary and tertiary treated municipal wastewater has been used to irrigate alfalfa and grains on approximately 4,000 acres in Southern California via center pivots. In addition to coordinating fluctuating treated water supply and crop demands, this program has focused on balancing two competing goals: (a) maximizing crop yield and (b) maintaining compliance with relatively strict environmental discharge permit requirements that limit the transport of nutrients, such as nitrates, past the root zone. For example, minimizing nitrate movement through precise irrigation promotes salts accumulation in the root zone. Subsequently, crop yield and nutrient uptake rates are impacted. In that context a combination of good management strategies, excellent irrigation hardware, and the selective use of technology have proven to be essential tools for success. This paper will detail some of the short and long-term challenges of managing soil health and crop production under local regulatory obligations.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 409-423
Case Study: West Stanislaus Irrigation District Modernization
West Stanislaus Irrigation District (WSID) provides agricultural irrigation water to about 22,000 acres in the San Joaquin Valley. The majority of WSID’s water is diverted directly from the San Joaquin River, with supplemental water obtained from the Delta-Mendota Canal (DMC), groundwater wells, and a variety of other sources. WSID operates a series of pumping plants that lift water from the San Joaquin River sequentially into six short canal reaches. Each main canal pool supplies one or two laterals along the valley contour. Water from the DMC enters the district via a gravity pipeline at the tail end of the main canal. Water supply curtailments, regulatory changes, and significant increases in drip/micro irrigated acreage have steered the district and its board members towards modernization of its original 1920s-era infrastructure. To that end, the Cal Poly Irrigation Training and Research Center (ITRC) has worked in cooperation with WSID since the early 2000s on a phased modernization planning and implementation process. Following a Main Canal Modernization Study, significant improvements have been executed along the main canal including the automation of all original pumping plants and lateral headings as well as the construction of two new, automated pumping plants. An industrial-grade Supervisory Control and Data Acquisition (SCADA) system has also been commissioned. Further project planning is underway at the San Joaquin River diversion and throughout the lateral canal system. This paper describes the modernization process and results. Lessons learned throughout the various projects are also discussed.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 409-423
Case Study: West Stanislaus Irrigation District Modernization
West Stanislaus Irrigation District (WSID) provides agricultural irrigation water to about 22,000 acres in the San Joaquin Valley. The majority of WSID’s water is diverted directly from the San Joaquin River, with supplemental water obtained from the Delta-Mendota Canal (DMC), groundwater wells, and a variety of other sources. WSID operates a series of pumping plants that lift water from the San Joaquin River sequentially into six short canal reaches. Each main canal pool supplies one or two laterals along the valley contour. Water from the DMC enters the district via a gravity pipeline at the tail end of the main canal. Water supply curtailments, regulatory changes, and significant increases in drip/micro irrigated acreage have steered the district and its board members towards modernization of its original 1920s-era infrastructure. To that end, the Cal Poly Irrigation Training and Research Center (ITRC) has worked in cooperation with WSID since the early 2000s on a phased modernization planning and implementation process. Following a Main Canal Modernization Study, significant improvements have been executed along the main canal including the automation of all original pumping plants and lateral headings as well as the construction of two new, automated pumping plants. An industrial-grade Supervisory Control and Data Acquisition (SCADA) system has also been commissioned. Further project planning is underway at the San Joaquin River diversion and throughout the lateral canal system. This paper describes the modernization process and results. Lessons learned throughout the various projects are also discussed.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 424-438
Improving Flow Measurement Accuracy Using a Portable Irrigation Turnout Calibration Unit
Relatively accurate flow measurement at irrigation district water delivery points is an important component of volumetric billing and equitable service. In California, this has often occurred with conversions to pressurized irrigation systems which commonly include the installation of pipeline flow meters as part of the on-farm system. However, a large portion of irrigation turnouts in the western U.S. continue to operate via gravity and fall into one of the following categories: (a) a metergate, or similar structure was installed without adherence to standard construction requirements, or (b) the structure was never intended for flow measurement. For these and other scenarios, there is a need to efficiently calibrate turnouts in the field. While some in-situ calibration methods exist for open channel turnouts, they are rarely applied in the field for a variety of practical reasons. After identifying this gap in field-practice, a special pump, or portable irrigation turnout calibration unit (calibration unit) was designed and constructed at the Cal Poly Irrigation Training and Research Center (ITRC). Within six weeks, thirty-two field turnout calibrations were performed using the Calibration Unit throughout seven California irrigation districts. Field testing protocol followed new guidelines developed by the USBR Mid Pacific Region and the California Department of Water Resources (DWR). The results and analyses of these calibrations are presented in this paper. Practical applications, such as compliance with California regulations developed out of The Water Conservation Act of 2009 (SB X7-7) and constraints of this new calibration method are also discussed.
- 18 May 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 424-438
Improving Flow Measurement Accuracy Using a Portable Irrigation Turnout Calibration Unit
Relatively accurate flow measurement at irrigation district water delivery points is an important component of volumetric billing and equitable service. In California, this has often occurred with conversions to pressurized irrigation systems which commonly include the installation of pipeline flow meters as part of the on-farm system. However, a large portion of irrigation turnouts in the western U.S. continue to operate via gravity and fall into one of the following categories: (a) a metergate, or similar structure was installed without adherence to standard construction requirements, or (b) the structure was never intended for flow measurement. For these and other scenarios, there is a need to efficiently calibrate turnouts in the field. While some in-situ calibration methods exist for open channel turnouts, they are rarely applied in the field for a variety of practical reasons. After identifying this gap in field-practice, a special pump, or portable irrigation turnout calibration unit (calibration unit) was designed and constructed at the Cal Poly Irrigation Training and Research Center (ITRC). Within six weeks, thirty-two field turnout calibrations were performed using the Calibration Unit throughout seven California irrigation districts. Field testing protocol followed new guidelines developed by the USBR Mid Pacific Region and the California Department of Water Resources (DWR). The results and analyses of these calibrations are presented in this paper. Practical applications, such as compliance with California regulations developed out of The Water Conservation Act of 2009 (SB X7-7) and constraints of this new calibration method are also discussed.