O. Salem
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
O. Salem has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Ash Genaidy
Worldtek Inc., Cincinnati, OH 45249, USA
2 shared publications A. Genaidy
Associate Professor, Construction Engineering and Management Program, Dept. of Civil and Environmental Engineering, Univ. of Cincinnati, P.O. Box 210071, Cincinnati, OH 45221-0071
1 shared publicationA. Shahin
Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Cincinnati, P.O. Box 210071, Cincinnati, OH 45221
1 shared publication- Ayman A. Abu Hammad
Assistant Professor, Dept. of Civil Engineering, College of Engineering, Applied Science Univ., P.O. Box 926296, Amman 11931, Jordan
1 shared publication - B. Basu
Assistant Professor, Dept. of Civil and Environmental Engineering, Univ. of Cincinnati, P.O. Box 210071, Cincinnati, OH 45221-0071
1 shared publication I. Minkarah
Associate Professor, Construction Engineering and Management Program, Dept. of Civil and Environmental Engineering, Univ. of Cincinnati, P.O. Box 210071, Cincinnati, OH 45221-0071
1 shared publication
Latest Publications
- 1 June 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Architectural Engineering
- Vol. 14 (2) , 36-46
Decision Support System for Manufactured Housing Facility Layout
Productivity improvement of manufactured housing (MH) production systems has been a great concern to manufacturers and production managers. Studies show that a typical manufactured housing plant fails to produce at desired capacity and production rate because of several shortcomings. The evaluation of the production system efficiency in the factory is essential for meeting the growing demand of customers with respect to design and size of the housing product. It is imperative to explore alternative layout designs that would be more efficient and productive. A decision support system (DSS) is proposed to assist the user in selecting an efficient layout design matching specified requirements and business constraints. The DSS framework covers interrelated factors of: (1) the market demand; (2) MH organization; (3) MH production process; and (4) MH production planning and facility design. Existing MH factories can utilize simulation and optimization components of the DSS in streamlining their activities and l...
- 1 June 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Architectural Engineering
- Vol. 14 (2) , 36-46
Decision Support System for Manufactured Housing Facility Layout
Productivity improvement of manufactured housing (MH) production systems has been a great concern to manufacturers and production managers. Studies show that a typical manufactured housing plant fails to produce at desired capacity and production rate because of several shortcomings. The evaluation of the production system efficiency in the factory is essential for meeting the growing demand of customers with respect to design and size of the housing product. It is imperative to explore alternative layout designs that would be more efficient and productive. A decision support system (DSS) is proposed to assist the user in selecting an efficient layout design matching specified requirements and business constraints. The DSS framework covers interrelated factors of: (1) the market demand; (2) MH organization; (3) MH production process; and (4) MH production planning and facility design. Existing MH factories can utilize simulation and optimization components of the DSS in streamlining their activities and l...
- 1 March 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 134 (3) , 205-216
Job Satisfaction of Women in Construction Trades
Existing research on women in construction focuses on engineers and entrepreneurs, yet little to no attention has been given to women in trades. Thus, the aim of this research is to review the literature on tradeswomen and to conduct a localized study to determine if demographic variables affect satisfaction with work, pay, opportunities, supervision, and people on the job for tradeswomen. These variables include age, education, number of dependents, number of trade years, duration of work, and frequency of work outside of the local area. Thirty-nine tradeswomen from the Cincinnati area were surveyed to assess their satisfaction or dissatisfaction with construction work. Currently, the literature review indicates that research on tradeswomen is limited and largely restricted to identifying measures that can attract and retain women in construction trades. Studies on motivation and job satisfaction of construction workers neither identify nor compare perceptions of tradeswomen about their work. Results of ...
- 1 March 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 134 (3) , 205-216
Job Satisfaction of Women in Construction Trades
Existing research on women in construction focuses on engineers and entrepreneurs, yet little to no attention has been given to women in trades. Thus, the aim of this research is to review the literature on tradeswomen and to conduct a localized study to determine if demographic variables affect satisfaction with work, pay, opportunities, supervision, and people on the job for tradeswomen. These variables include age, education, number of dependents, number of trade years, duration of work, and frequency of work outside of the local area. Thirty-nine tradeswomen from the Cincinnati area were surveyed to assess their satisfaction or dissatisfaction with construction work. Currently, the literature review indicates that research on tradeswomen is limited and largely restricted to identifying measures that can attract and retain women in construction trades. Studies on motivation and job satisfaction of construction workers neither identify nor compare perceptions of tradeswomen about their work. Results of ...
- 1 December 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 133 (12) , 982-992
Minimizing Cutting Wastes of Reinforcement Steel Bars Using Genetic Algorithms and Integer Programming Models
Materials that are in the form of one-dimensional stocks such as steel rebars, structural steel sections, and dimensional lumber generate a major fraction of the generated construction waste. Cutting one-dimensional stocks to suit the construction project requirements result in trim or cutting losses, which is the major cause of the one-dimensional construction waste. The optimization problem of minimizing the trim losses is known as the cutting stock problem (CSP). In this paper, three approaches for solving the one-dimensional cutting stock problem are presented. A genetic algorithm (GA) model, a linear programming (LP) model, and an integer programming (IP) model were developed to solve the one-dimensional CSP. Three real life case studies from a steel workshop have been studied. The generated cutting schedules using the GA, LP, and IP approaches are presented and compared to the actual workshop’s cutting schedules. The comparison shows a high potential of savings that could be achieved using such tech...
- 1 December 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 133 (12) , 982-992
Minimizing Cutting Wastes of Reinforcement Steel Bars Using Genetic Algorithms and Integer Programming Models
Materials that are in the form of one-dimensional stocks such as steel rebars, structural steel sections, and dimensional lumber generate a major fraction of the generated construction waste. Cutting one-dimensional stocks to suit the construction project requirements result in trim or cutting losses, which is the major cause of the one-dimensional construction waste. The optimization problem of minimizing the trim losses is known as the cutting stock problem (CSP). In this paper, three approaches for solving the one-dimensional cutting stock problem are presented. A genetic algorithm (GA) model, a linear programming (LP) model, and an integer programming (IP) model were developed to solve the one-dimensional CSP. Three real life case studies from a steel workshop have been studied. The generated cutting schedules using the GA, LP, and IP approaches are presented and compared to the actual workshop’s cutting schedules. The comparison shows a high potential of savings that could be achieved using such tech...
- Top Cited Papers
- 1 October 2006
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 22 (4) , 168-175
Lean Construction: From Theory to Implementation
This article compares the techniques developed for lean construction with those developed for lean manufacturing. Lean manufacturing and lean construction techniques share many common elements despite the obvious differences in their assembly environments and processes. Manufacturing plants and construction sites are different in many ways that might explain why lean production theories and practices do not fully fit the construction industry. Though many lean construction tools and elements are still in an embryonic state, lean construction techniques are gaining popularity because they can affect the bottom line of projects. Additionally, this paper presents a study of a construction project in which specific lean construction elements were tested. Each technique was evaluated in terms of its impact on the performance of the project. Based on the findings of the study, a new “lean assessment tool” is proposed to quantify the results of lean implementations. The assessment tool evaluates six lean constru...
- 1 October 2006
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 22 (4) , 168-175
Top Cited PapersLean Construction: From Theory to Implementation
This article compares the techniques developed for lean construction with those developed for lean manufacturing. Lean manufacturing and lean construction techniques share many common elements despite the obvious differences in their assembly environments and processes. Manufacturing plants and construction sites are different in many ways that might explain why lean production theories and practices do not fully fit the construction industry. Though many lean construction tools and elements are still in an embryonic state, lean construction techniques are gaining popularity because they can affect the bottom line of projects. Additionally, this paper presents a study of a construction project in which specific lean construction elements were tested. Each technique was evaluated in terms of its impact on the performance of the project. Based on the findings of the study, a new “lean assessment tool” is proposed to quantify the results of lean implementations. The assessment tool evaluates six lean constru...
- 1 May 2006
- Published by American Society of Civil Engineers (ASCE) in Practice Periodical on Structural Design and Construction
- Vol. 11 (2) , 98-104
Accelerating the Construction of a Highway Bridge in Ohio
The Ohio Department of Transportation (ODOT) created Strategic Initiative Number 9 to “build bridges smarter, faster and better.” One project undertaken by ODOT was to use a precast, post-tensioned slab bridge in place of a cast-in-place slab. To accommodate school schedules and a festival, the bridge was to be completed in 16 days. However, the bridge was actually completed in 19 days. Delays were due to weather, equipment problems, and confusion over plans and specifications. Contributing to the success of the project was the effective partnering between ODOT and the contractor, along with a high level of upfront planning. However it is necessary to address problems such as the lack of contingency plans and some unexpected issues that were overlooked in the planning phase.
- 1 May 2006
- Published by American Society of Civil Engineers (ASCE) in Practice Periodical on Structural Design and Construction
- Vol. 11 (2) , 98-104
Accelerating the Construction of a Highway Bridge in Ohio
The Ohio Department of Transportation (ODOT) created Strategic Initiative Number 9 to “build bridges smarter, faster and better.” One project undertaken by ODOT was to use a precast, post-tensioned slab bridge in place of a cast-in-place slab. To accommodate school schedules and a festival, the bridge was to be completed in 16 days. However, the bridge was actually completed in 19 days. Delays were due to weather, equipment problems, and confusion over plans and specifications. Contributing to the success of the project was the effective partnering between ODOT and the contractor, along with a high level of upfront planning. However it is necessary to address problems such as the lack of contingency plans and some unexpected issues that were overlooked in the planning phase.
- 1 September 2004
- Published by Wiley in Human Factors and Ergonomics in Manufacturing & Service Industries
- Vol. 14 (4) , 379-402
The concept of work compatibility: An integrated design criterion for improving workplace human performance in manufacturing systems
- 1 September 2004
- Published by Wiley in Human Factors and Ergonomics in Manufacturing & Service Industries
- Vol. 14 (4) , 379-402
The concept of work compatibility: An integrated design criterion for improving workplace human performance in manufacturing systems