Ayman A. Abu Hammad
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ayman A. Abu Hammad has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Ghaleb Sweis
Civil Engineering Department, The University of Jordan, Amman P.O. Box 11942, Jordan
2 shared publications - Rateb Jalil Sweis
The University of Jordan Faculty of Business
2 shared publications H. Randolph Thomas
Department of Civil Engineering , Pennsylvania State University , University Park, PA, 16802, USA
1 shared publication- Makarand Hastak
Former Graduate Student, Division of Construction Engineering and Management, School of Civil Engineering, Purdue Univ., West Lafayette, IN 47907
1 shared publication - Matt Syal
Former Graduate Student, Division of Construction Engineering and Management, School of Civil Engineering, Purdue Univ., West Lafayette, IN 47907
1 shared publication - O. Salem
Assistant Professor, Civil Engineering Dept., Applied Science Univ., P.O. Box 926296, Amman 11931, Jordan
1 shared publication
Latest Publications
- 1 April 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 26 (2) , 105-112
Statistical Analysis on the Cost and Duration of Public Building Projects
A probabilistic model is proposed to predict the risk effects on time and cost of public building projects. The research goal is to utilize a real history data in estimating project cost and duration. The model results can be used to adjust floats and budgets of the planning schedule before project commencement. Statistical regression models and sample tests are developed using real data of 113 public projects. The model outputs can be used by project managers in the planning phase to validate the schedule critical path time and project budget. The comparison of means analysis for project cost and time performance indicated that the sample projects tend to finish over budget and almost on schedule. Regression models were developed to model project cost and time. The regression analysis showed that the project budgeted cost and planned project duration provide a good basis for estimating the cost and duration. The regression model results were validated by estimating the prediction error in percent and thr...
- 1 April 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 26 (2) , 105-112
Statistical Analysis on the Cost and Duration of Public Building Projects
A probabilistic model is proposed to predict the risk effects on time and cost of public building projects. The research goal is to utilize a real history data in estimating project cost and duration. The model results can be used to adjust floats and budgets of the planning schedule before project commencement. Statistical regression models and sample tests are developed using real data of 113 public projects. The model outputs can be used by project managers in the planning phase to validate the schedule critical path time and project budget. The comparison of means analysis for project cost and time performance indicated that the sample projects tend to finish over budget and almost on schedule. Regression models were developed to model project cost and time. The regression analysis showed that the project budgeted cost and planned project duration provide a good basis for estimating the cost and duration. The regression model results were validated by estimating the prediction error in percent and thr...
- 9 June 2008
- Published by Taylor & Francis in Architectural Science Review
- Vol. 51 (2) , 146-152
Factors Affecting Baseline Productivity in Masonry Construction: A Comparative Study in the US, UK and Jordan
- 9 June 2008
- Published by Taylor & Francis in Architectural Science Review
- Vol. 51 (2) , 146-152
Factors Affecting Baseline Productivity in Masonry Construction: A Comparative Study in the US, UK and Jordan
- 1 June 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Architectural Engineering
- Vol. 14 (2) , 36-46
Decision Support System for Manufactured Housing Facility Layout
Productivity improvement of manufactured housing (MH) production systems has been a great concern to manufacturers and production managers. Studies show that a typical manufactured housing plant fails to produce at desired capacity and production rate because of several shortcomings. The evaluation of the production system efficiency in the factory is essential for meeting the growing demand of customers with respect to design and size of the housing product. It is imperative to explore alternative layout designs that would be more efficient and productive. A decision support system (DSS) is proposed to assist the user in selecting an efficient layout design matching specified requirements and business constraints. The DSS framework covers interrelated factors of: (1) the market demand; (2) MH organization; (3) MH production process; and (4) MH production planning and facility design. Existing MH factories can utilize simulation and optimization components of the DSS in streamlining their activities and l...
- 1 June 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Architectural Engineering
- Vol. 14 (2) , 36-46
Decision Support System for Manufactured Housing Facility Layout
Productivity improvement of manufactured housing (MH) production systems has been a great concern to manufacturers and production managers. Studies show that a typical manufactured housing plant fails to produce at desired capacity and production rate because of several shortcomings. The evaluation of the production system efficiency in the factory is essential for meeting the growing demand of customers with respect to design and size of the housing product. It is imperative to explore alternative layout designs that would be more efficient and productive. A decision support system (DSS) is proposed to assist the user in selecting an efficient layout design matching specified requirements and business constraints. The DSS framework covers interrelated factors of: (1) the market demand; (2) MH organization; (3) MH production process; and (4) MH production planning and facility design. Existing MH factories can utilize simulation and optimization components of the DSS in streamlining their activities and l...