Mehdi Rahmanpour
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Mehdi Rahmanpour has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
M. Osanloo
Amirkabir University of Technology, Tehran, Iran
3 shared publications- Dejan Stevanović
Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia
2 shared publications Mohammad Shami-Qalandari
School of Mining, College of Engineering University of Tehran, Tehran, Iran
2 shared publicationsMorteza Osanloo
Mining Engineering Department, Amirkabir University of Technology, Tehran, Iran
2 shared publications- Morteza Osanloo
Amirkabir University of Technology
2 shared publications Ali Nasirinezhad
1 shared publication
Latest Publications
- Open Access
- 14 December 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (24) , 13148
Model for Optimizing Waste-Haulage Systems in Open-Pit Mines (Trucks vs. IPCC System)
Waste haulage represents one of the most critical and cost-intensive operations in surface mining, accounting for up to 50% of the total operating costs. Under such operating conditions, the implementation of continuous systems such as In-Pit Crushing and Conveying (IPCC) is an alternative to truck haulage, as it demonstrates a higher degree of economic efficiency. In a theoretical and practical sense, due to its direct impact on the extraction plan, defining the optimal position of the crusher and consequently the system of conveyors is often the most challenging problem of this methodology. This paper introduces an innovative approach to determining the optimum waste haulage configuration by comparing conventional truck-based transport with IPCC systems. The model is formulated as a Mixed-Integer Linear Programming (MILP) problem, explicitly incorporating spatial dimensions and the relocation costs of semi-mobile crushers. The model situates the crusher in a way that reduces transfer costs throughout production periods and it has been tested on a hypothetical open pit.
- 14 December 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (24) , 13148
Open AccessModel for Optimizing Waste-Haulage Systems in Open-Pit Mines (Trucks vs. IPCC System)
Waste haulage represents one of the most critical and cost-intensive operations in surface mining, accounting for up to 50% of the total operating costs. Under such operating conditions, the implementation of continuous systems such as In-Pit Crushing and Conveying (IPCC) is an alternative to truck haulage, as it demonstrates a higher degree of economic efficiency. In a theoretical and practical sense, due to its direct impact on the extraction plan, defining the optimal position of the crusher and consequently the system of conveyors is often the most challenging problem of this methodology. This paper introduces an innovative approach to determining the optimum waste haulage configuration by comparing conventional truck-based transport with IPCC systems. The model is formulated as a Mixed-Integer Linear Programming (MILP) problem, explicitly incorporating spatial dimensions and the relocation costs of semi-mobile crushers. The model situates the crusher in a way that reduces transfer costs throughout production periods and it has been tested on a hypothetical open pit.
- 25 October 2024
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 133 (4) , 305-318
An analytical approach for evaluation of conveyor exit strategies in open-pit mines
Transportation is the most expensive task in deep open-pit mining operations. An In-Pit Crushing and Conveying (IPCC) system, as an alternative to the conventional shovel-truck system, requires precise planning to avoid wasting high capital expenditures on trucks. The decision to fit a conveyor system into the pit design is challenging and needs to be addressed in the literature. Further optimisation of the IPCC system requires choosing an appropriate conveyor exit strategy. Conveyor exit schemes include a Dedicated Ramp Slot (DRS), an Existing Ramping System, an inclined tunnel and High-Angle Conveyors (HAC). This paper provides an analytical approach to compare the cost of different conveyor exit strategies in open-pit mines. The results indicate that for a depth up to 100 m, the Present Value of Cost (PVC) for the DRS is the least. For the cases deeper than 300 m, the HAC has the least PVC. Sensitivity analysis showed that for the depths between 100 and 300 m, a more accurate and detailed definition of parameters is needed. Besides, in most cases, the HAC provides the lowest payback period and the highest internal rate of return among the alternatives.
- 25 October 2024
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 133 (4) , 305-318
An analytical approach for evaluation of conveyor exit strategies in open-pit mines
Transportation is the most expensive task in deep open-pit mining operations. An In-Pit Crushing and Conveying (IPCC) system, as an alternative to the conventional shovel-truck system, requires precise planning to avoid wasting high capital expenditures on trucks. The decision to fit a conveyor system into the pit design is challenging and needs to be addressed in the literature. Further optimisation of the IPCC system requires choosing an appropriate conveyor exit strategy. Conveyor exit schemes include a Dedicated Ramp Slot (DRS), an Existing Ramping System, an inclined tunnel and High-Angle Conveyors (HAC). This paper provides an analytical approach to compare the cost of different conveyor exit strategies in open-pit mines. The results indicate that for a depth up to 100 m, the Present Value of Cost (PVC) for the DRS is the least. For the cases deeper than 300 m, the HAC has the least PVC. Sensitivity analysis showed that for the depths between 100 and 300 m, a more accurate and detailed definition of parameters is needed. Besides, in most cases, the HAC provides the lowest payback period and the highest internal rate of return among the alternatives.
- 26 July 2024
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 133 (3) , 226-240
A modified approach for cut-off grade and production rate optimization in block caving projects
Optimization of mining projects is often aimed at maximizing the net present value (NPV). Cut-off grade along with production rate determines the quantity and destination of material that is mined and processed. Thus, the cash flows and the NPV of a mining project are directly affected by the cut-off grade, the mineable reserve and the production rate. In order to achieve the maximum NPV, these factors must be evaluated. Block caving is a non-selective mass mining method. In block caving method, as the cut-off grade changes, the amount of mineable reserve, and the correlated mining envelope changes consequently. Determining the optimum cut-off grade and production rate for block cave mining is a complex task, therefore, artificial neural network (ANN) and response surface method (RSM) approaches are utilized in this paper. According to the results, a combination of RSM and ANN models is able to determine the best configuration of cut-off grade and production rate that leads to the maximum NPV.
- 26 July 2024
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 133 (3) , 226-240
A modified approach for cut-off grade and production rate optimization in block caving projects
Optimization of mining projects is often aimed at maximizing the net present value (NPV). Cut-off grade along with production rate determines the quantity and destination of material that is mined and processed. Thus, the cash flows and the NPV of a mining project are directly affected by the cut-off grade, the mineable reserve and the production rate. In order to achieve the maximum NPV, these factors must be evaluated. Block caving is a non-selective mass mining method. In block caving method, as the cut-off grade changes, the amount of mineable reserve, and the correlated mining envelope changes consequently. Determining the optimum cut-off grade and production rate for block cave mining is a complex task, therefore, artificial neural network (ANN) and response surface method (RSM) approaches are utilized in this paper. According to the results, a combination of RSM and ANN models is able to determine the best configuration of cut-off grade and production rate that leads to the maximum NPV.
- 1 January 2022
- Published by Faculty of Mining, Geology and Petroleum Engineering in Rudarsko-geološko-naftni zbornik
- Vol. 37 (5) , 103-116
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especially in mass mining projects and notably block caving. Besides, grade variation and grade uncertainty are significant sources of error in mining proje...
- 1 January 2022
- Published by Faculty of Mining, Geology and Petroleum Engineering in Rudarsko-geološko-naftni zbornik
- Vol. 37 (5) , 103-116
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especially in mass mining projects and notably block caving. Besides, grade variation and grade uncertainty are significant sources of error in mining proje...
- 22 November 2021
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 36 (2) , 142-158
Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying
Despite the upward trend in using semi-mobile in-pit crushing and conveying system (SMIPCC), some mining companies still hesitate to use SMIPCC in their operations. Therefore, a framework is needed to facilitate decision-making between SMIPCC and truck and shovel system (TS) and satisfy the location and relocation time of the semi-mobile crusher (SMC). For this purpose, this paper presents a mathematical integer programming (IP) model considering the operational constraints. The model specifies both the optimum location and optimum relocation time of SMC. Also, it compares the production schedule for the TS and SMIPCC utilised for ore and waste handling over the life of mine. Then, the system with maximum net present value (NPV) is selected as the optimal material handling system. Finally, the model is implemented with a case study. The results show that implementing SMIPCC instead of the TS system for ore and waste materials improves the NPV by 69.77%.
- 22 November 2021
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 36 (2) , 142-158
Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying
Despite the upward trend in using semi-mobile in-pit crushing and conveying system (SMIPCC), some mining companies still hesitate to use SMIPCC in their operations. Therefore, a framework is needed to facilitate decision-making between SMIPCC and truck and shovel system (TS) and satisfy the location and relocation time of the semi-mobile crusher (SMC). For this purpose, this paper presents a mathematical integer programming (IP) model considering the operational constraints. The model specifies both the optimum location and optimum relocation time of SMC. Also, it compares the production schedule for the TS and SMIPCC utilised for ore and waste handling over the life of mine. Then, the system with maximum net present value (NPV) is selected as the optimal material handling system. Finally, the model is implemented with a case study. The results show that implementing SMIPCC instead of the TS system for ore and waste materials improves the NPV by 69.77%.
- Open Access
- 1 January 2021
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Podzemni radovi
- No. 38,p. 15-25
Primary crusher site selection in open pit mines: Case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine design process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location for primary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, Sungun started the studies followed with an expansion plan with the goal to increase the capacity from 14 to 28 Mt/Year within the next 8 years. In this paper, 14 effective parameters for finding the best location for a new crusher in five possible options were considered. The options were evaluated based on weighted linear combination method. The results show that the location in South East part of the open pit is the best option for locating of the new crusher. Finally, based on the economic parameters and copper price forecasts, pit optimization and sensitive analysis are applied. Results show that in the worst case, just 0.17 % of ore reserve is affected by the selected area and the minable reserve can cover 78 years of operation.
- 1 January 2021
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Podzemni radovi
- No. 38,p. 15-25
Open AccessPrimary crusher site selection in open pit mines: Case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine design process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location for primary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, Sungun started the studies followed with an expansion plan with the goal to increase the capacity from 14 to 28 Mt/Year within the next 8 years. In this paper, 14 effective parameters for finding the best location for a new crusher in five possible options were considered. The options were evaluated based on weighted linear combination method. The results show that the location in South East part of the open pit is the best option for locating of the new crusher. Finally, based on the economic parameters and copper price forecasts, pit optimization and sensitive analysis are applied. Results show that in the worst case, just 0.17 % of ore reserve is affected by the selected area and the minable reserve can cover 78 years of operation.
- Open Access
- 1 January 2017
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 117 (7) , 684-694
Application of fuzzy linear programming for short-term planning and quality control in mine complexes
Production planning in a mine complex aims to determine the amount of material that should be mined from each site, and can be modelled as a linear programming problem. Deterministic production plans are optimized based on the estimated quantity and quality of the in-situ material. These estimations always have a level of uncertainty and impreciseness due to the insufficiency of exploration data in the planning phase. In this paper, based on the gathered data, the uncertainties of grades, recovery, and mining costs are modelled using bounded fuzzy numbers. Due to the quality variation of the material, mine planning and blending optimizations are in fact uncertainty-based optimization problems. Thus, a fuzzy linear programming model is formulated to optimize short-term production planning. The results provide a comprehensive set of solutions with a corresponding degree of membership. As an illustration, the model is applied to a limestone mine complex, and a conservative and an optimistic plan are provided.
- 1 January 2017
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 117 (7) , 684-694
Open AccessApplication of fuzzy linear programming for short-term planning and quality control in mine complexes
Production planning in a mine complex aims to determine the amount of material that should be mined from each site, and can be modelled as a linear programming problem. Deterministic production plans are optimized based on the estimated quantity and quality of the in-situ material. These estimations always have a level of uncertainty and impreciseness due to the insufficiency of exploration data in the planning phase. In this paper, based on the gathered data, the uncertainties of grades, recovery, and mining costs are modelled using bounded fuzzy numbers. Due to the quality variation of the material, mine planning and blending optimizations are in fact uncertainty-based optimization problems. Thus, a fuzzy linear programming model is formulated to optimize short-term production planning. The results provide a comprehensive set of solutions with a corresponding degree of membership. As an illustration, the model is applied to a limestone mine complex, and a conservative and an optimistic plan are provided.
- Open Access
- 1 January 2017
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 117 (6) , 599-607
In-pit crusher location as a dynamic location problem
The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive for use in modern mining operations. Semi-mobile systems, which are the most common systems in open-pit mining, combine the advantages of both systems such that fewer trucks are required, operating costs are lowered, and the operation is environmentally sound. One major aspect of utilizing this system is determining the location of the in-pit crusher and the timing of relocations. Facility location models are rarely used in the mining sector, but these models may be used for solving the in-pit crusher location problem. To this end, the main parameters affecting the IPCC location in open pit mines are reviewed and examples given of how they are applied to a dynamic location-relocation problem. Subsequently, the model is implemented for Sungun copper mine in Iran and the number and the exact time of relocations of the IPCC units determined.
- 1 January 2017
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 117 (6) , 599-607
Open AccessIn-pit crusher location as a dynamic location problem
The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive for use in modern mining operations. Semi-mobile systems, which are the most common systems in open-pit mining, combine the advantages of both systems such that fewer trucks are required, operating costs are lowered, and the operation is environmentally sound. One major aspect of utilizing this system is determining the location of the in-pit crusher and the timing of relocations. Facility location models are rarely used in the mining sector, but these models may be used for solving the in-pit crusher location problem. To this end, the main parameters affecting the IPCC location in open pit mines are reviewed and examples given of how they are applied to a dynamic location-relocation problem. Subsequently, the model is implemented for Sungun copper mine in Iran and the number and the exact time of relocations of the IPCC units determined.
- 1 January 2017
- Published by Elsevier in Journal of Cleaner Production
- Vol. 141, 1249-1258
A decision support system for determination of a sustainable pit limit
- 1 January 2017
- Published by Elsevier in Journal of Cleaner Production
- Vol. 141, 1249-1258
A decision support system for determination of a sustainable pit limit
- 18 October 2016
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 32 (1) , 35-55
A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining
Cost efficiency and high reliability of In-Pit Crushing and Conveying (IPCC) system make it more appealing to be used in deeper open-pit mining activities. Determination of the optimum time and location (OT–OL) for applying the IPCC system were always a challenge. Application of mathematical programming approaches suffers from reduced computational efficiency due to a lot of decision variables. The situation will be worse; by adding the IPCC’s time and location variables to these models. Also, the problem involves a lot of variables that each one of them is a function of others. To tackle these, this paper provides a new heuristic approach to find a good quality solution hierarchically (here in two levels). The problem was broken into two parts (i.e. OT and OL). The model works in a discrete time horizon. It has been verified by the data gathered from Sungun copper mine of Iran. Our computational results show that the system is efficient for developed countries with a stable and low interest rate.
- 18 October 2016
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 32 (1) , 35-55
A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining
Cost efficiency and high reliability of In-Pit Crushing and Conveying (IPCC) system make it more appealing to be used in deeper open-pit mining activities. Determination of the optimum time and location (OT–OL) for applying the IPCC system were always a challenge. Application of mathematical programming approaches suffers from reduced computational efficiency due to a lot of decision variables. The situation will be worse; by adding the IPCC’s time and location variables to these models. Also, the problem involves a lot of variables that each one of them is a function of others. To tackle these, this paper provides a new heuristic approach to find a good quality solution hierarchically (here in two levels). The problem was broken into two parts (i.e. OT and OL). The model works in a discrete time horizon. It has been verified by the data gathered from Sungun copper mine of Iran. Our computational results show that the system is efficient for developed countries with a stable and low interest rate.