Morteza Osanloo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Morteza Osanloo has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- Morteza Paricheh
Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran
4 shared publications - Mehdi Rahmanpour
School of Mining, College of Engineering University of Tehran, Tehran, Iran
2 shared publications - Mehrnoosh Heydari
University of Cambridge
2 shared publications - A. Aghajani Bazzazi
Department of Mining Engineering, Amirkabir University of Technology, Tehran, Iran
1 shared publication A. Hajarian
Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran
1 shared publicationA. Soltani Khaboushan
Amirkabir University of Technology
1 shared publication
Latest Publications
- Open Access
- 21 May 2026
- Published by Springer Nature in Scientific Reports
- Vol. 16 (1)
Incorporating environmental costs into long-term open-pit mine planning for sustainable resource optimization
Long-term production planning in open-pit mines should be conducted in a manner that satisfies current societal demand for mineral resources while maintaining an appropriate balance with environmental protection. Achieving such a balance requires that environmental considerations be systematically incorporated into mine design and production planning processes. Given the absence of a comprehensive framework for quantifying environmental costs in production planning, this study identifies the various categories of these costs and proposes practical methods for their quantification. Accordingly, a Mixed-Integer Linear Programming (MILP) model is developed in which all environmental costs are directly and consistently integrated into the objective function based on ore and waste rock types. The proposed model enables the coherent integration of all environmental costs associated with open-pit mining into the production planning process and can be fully implemented within a three-dimensional block model framework. The results show that although the ultimate pit limit and production schedule derived from the proposed model lead to a lower apparent NPV, they offer a more realistic representation of actual mining conditions. A comparison of the evaluated scenarios indicates that directly incorporating environmental costs into the objective function of the proposed MILP model increases the total mine NPV in the case study by approximately 14.87% compared with a scenario that block model is designed as in conventional models in which environmental costs are excluded from the objective function and the total mine NPV is calculated including the related environmental costs. This result highlights that integrating environmental costs at the optimization stage supports more realistic and sustainability-oriented decision-making. In addition, the cost distribution analysis demonstrates that acid mine drainage (AMD) control costs and greenhouse gas (GHG) emission costs are the most influential environmental cost components affecting the project’s economic performance.
- 21 May 2026
- Published by Springer Nature in Scientific Reports
- Vol. 16 (1)
Open AccessIncorporating environmental costs into long-term open-pit mine planning for sustainable resource optimization
Long-term production planning in open-pit mines should be conducted in a manner that satisfies current societal demand for mineral resources while maintaining an appropriate balance with environmental protection. Achieving such a balance requires that environmental considerations be systematically incorporated into mine design and production planning processes. Given the absence of a comprehensive framework for quantifying environmental costs in production planning, this study identifies the various categories of these costs and proposes practical methods for their quantification. Accordingly, a Mixed-Integer Linear Programming (MILP) model is developed in which all environmental costs are directly and consistently integrated into the objective function based on ore and waste rock types. The proposed model enables the coherent integration of all environmental costs associated with open-pit mining into the production planning process and can be fully implemented within a three-dimensional block model framework. The results show that although the ultimate pit limit and production schedule derived from the proposed model lead to a lower apparent NPV, they offer a more realistic representation of actual mining conditions. A comparison of the evaluated scenarios indicates that directly incorporating environmental costs into the objective function of the proposed MILP model increases the total mine NPV in the case study by approximately 14.87% compared with a scenario that block model is designed as in conventional models in which environmental costs are excluded from the objective function and the total mine NPV is calculated including the related environmental costs. This result highlights that integrating environmental costs at the optimization stage supports more realistic and sustainability-oriented decision-making. In addition, the cost distribution analysis demonstrates that acid mine drainage (AMD) control costs and greenhouse gas (GHG) emission costs are the most influential environmental cost components affecting the project’s economic performance.
- 27 February 2026
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- p. 1-26
Data-driven optimisation of crushing system configuration in large-scale copper mines to reduce CO 2 emissions
1. Global population growth and economic development are driving a significant increase in energy and raw material demand, with copper remaining a critical resource for infrastructure and clean tec...
- 27 February 2026
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- p. 1-26
Data-driven optimisation of crushing system configuration in large-scale copper mines to reduce CO 2 emissions
1. Global population growth and economic development are driving a significant increase in energy and raw material demand, with copper remaining a critical resource for infrastructure and clean tec...
- 12 January 2025
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 39 (7) , 511-530
Net present value comparison of different mathematical programming models for multi-element open pit mines
- 12 January 2025
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 39 (7) , 511-530
Net present value comparison of different mathematical programming models for multi-element open pit mines
- Open Access
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (11) , 2547-2563
Greenhouse Gas Emissions Reduction through Integration of Renewable and Non-renewable Energy Sources: A Model for Sangan Iron Ore Mine Complex of Iran
The iron ore mining industry is a crucial component of the global economy, yet it is one of the most energy-intensive sectors, heavily reliant on non-renewable energy sources. This industry contributes approximately 7% of global CO2 emissions, leading to significant environmental pollution and economic instability. Switching to renewable energy is crucial for reducing climate change and its impacts on health. This research focuses on optimizing its use alongside non-renewable energy sources to minimize the carbon footprint and promote socio-economic development in the region. The study reveals that the Sangan complex has exceptional weather conditions for harnessing solar and wind energy. Feasibility analyses indicate that a 100 MW solar power plant and a 10 MW wind power plant could supply 40% and 16% of the complex's electricity needs, respectively. Transitioning from complete reliance on non-renewable energy sources—resulting in annual GHG emissions of 349,229 tons—to a model where 56% of electricity comes from renewable sources could reduce emissions to 88,757 tons per year. The initial investment for establishing solar and wind power plants is estimated at USD 99 million and USD 50 million, respectively, with annual maintenance costs of USD 825,000 and USD 1.5 million. Importantly, this model not only demonstrates economic viability but also offers substantial financial justification through lower operational costs. Developing renewable energy sources at Sangan creates job opportunities, fosters entrepreneurship, and enhances economic resilience. This approach optimizes energy production, contributes to environmental goals, and supports a sustainable future in Iran's mining sector.
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (11) , 2547-2563
Open AccessGreenhouse Gas Emissions Reduction through Integration of Renewable and Non-renewable Energy Sources: A Model for Sangan Iron Ore Mine Complex of Iran
The iron ore mining industry is a crucial component of the global economy, yet it is one of the most energy-intensive sectors, heavily reliant on non-renewable energy sources. This industry contributes approximately 7% of global CO2 emissions, leading to significant environmental pollution and economic instability. Switching to renewable energy is crucial for reducing climate change and its impacts on health. This research focuses on optimizing its use alongside non-renewable energy sources to minimize the carbon footprint and promote socio-economic development in the region. The study reveals that the Sangan complex has exceptional weather conditions for harnessing solar and wind energy. Feasibility analyses indicate that a 100 MW solar power plant and a 10 MW wind power plant could supply 40% and 16% of the complex's electricity needs, respectively. Transitioning from complete reliance on non-renewable energy sources—resulting in annual GHG emissions of 349,229 tons—to a model where 56% of electricity comes from renewable sources could reduce emissions to 88,757 tons per year. The initial investment for establishing solar and wind power plants is estimated at USD 99 million and USD 50 million, respectively, with annual maintenance costs of USD 825,000 and USD 1.5 million. Importantly, this model not only demonstrates economic viability but also offers substantial financial justification through lower operational costs. Developing renewable energy sources at Sangan creates job opportunities, fosters entrepreneurship, and enhances economic resilience. This approach optimizes energy production, contributes to environmental goals, and supports a sustainable future in Iran's mining sector.
- Open Access
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (4) , 830-847
A Spatiotemporal Environmental Sustainability Assessment Model for Deep and Large-scale Open-pit Copper Mines
With industrialization, economic growth, and increasing demand for minerals, mining raw materials from deep and low-grade deposits is increasing, highlighting the need to evaluate the environmental impacts of these mines. This study aims to provide a comprehensive sustainability assessment (SA) model for deep and large-scale open pit mines (DLSOP). The proposed model evaluates a total of 44 environmental factors in 11 groups. Z-numbers plus Delphi Fuzzy Analytical Hierarchy Process (ZFDAHP) and scenarios, evaluate DLSOP mine conditions with minimal uncertainty. Since the mining impacts spread over time (short-, medium-, and long-term) and space (local, regional, national, and global), the spatiotemporal scale (ST) of factors is used to calculate the dynamic sustainability score. This model considers the impact of the mine's depth and scale on the intensity of the positive and negative environmental impacts of mining and provides a final sustainability score on a scale of 0-10. Verification was done in Sungun Copper Mine (SCM) in northwest Iran to show the effectiveness of the proposed model. Waste, water, and climate change with 23.9%, 16.5%, and 15.6% importance weight, respectively, accounted for the greatest environmental impact in DLSOP mines. The static and dynamic environmental sustainability scores for SCM were 3.110 and 3.200 out of 10, respectively, showing that SCM should pay more attention to its activities towards environmental sustainability. The combined technique of this model increases the reliability and accuracy of previous models in DLSOP mines by considering a wide range of impact factors and taking into account the ST scale of impacts.
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (4) , 830-847
Open AccessA Spatiotemporal Environmental Sustainability Assessment Model for Deep and Large-scale Open-pit Copper Mines
With industrialization, economic growth, and increasing demand for minerals, mining raw materials from deep and low-grade deposits is increasing, highlighting the need to evaluate the environmental impacts of these mines. This study aims to provide a comprehensive sustainability assessment (SA) model for deep and large-scale open pit mines (DLSOP). The proposed model evaluates a total of 44 environmental factors in 11 groups. Z-numbers plus Delphi Fuzzy Analytical Hierarchy Process (ZFDAHP) and scenarios, evaluate DLSOP mine conditions with minimal uncertainty. Since the mining impacts spread over time (short-, medium-, and long-term) and space (local, regional, national, and global), the spatiotemporal scale (ST) of factors is used to calculate the dynamic sustainability score. This model considers the impact of the mine's depth and scale on the intensity of the positive and negative environmental impacts of mining and provides a final sustainability score on a scale of 0-10. Verification was done in Sungun Copper Mine (SCM) in northwest Iran to show the effectiveness of the proposed model. Waste, water, and climate change with 23.9%, 16.5%, and 15.6% importance weight, respectively, accounted for the greatest environmental impact in DLSOP mines. The static and dynamic environmental sustainability scores for SCM were 3.110 and 3.200 out of 10, respectively, showing that SCM should pay more attention to its activities towards environmental sustainability. The combined technique of this model increases the reliability and accuracy of previous models in DLSOP mines by considering a wide range of impact factors and taking into account the ST scale of impacts.
- Open Access
- 1 January 2024
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 37 (1) , 1-13
A New Comprehensive Model for Integrating Environmental, Economic, and Social Performance of Deep and Large-scale Open-Pit Copper Mines
Deep and large-scale (D&LS) open-pit mines pose various environmental, social, and economic impacts on the mining projects’ stakeholders and local, regional, national, and international communities. Identifying these impacts and having a comprehensive model to assess these impacts altogether is critical to achieving sustainable development (SD) goals. This study develops a robust sustainability assessment model for D&LS open-pit mining projects. The model comprehensively considers 99 impact factors across environmental, social, and economic dimensions. The sustainability score is calculated using the Z-FDAHP technique to reduce the bias and uncertainty of experts' judgments. Then, the scenario-based technique is used to apply the stakeholders' perspective to the model. The model is applied to Sungun Copper Mine (SCM) in northwest Iran for verification. Results show SCM's sustainability performance is highly sensitive to index weightings. The highest score was achieved with sole social prioritization (scenario 8 with a sustainability score of 6.364 out of 10), highlighting the critical role of community impacts. Environmental or economic focus alone (scenarios 2 and 5) was not very sustainable, with scores of 3.326 and 5.298 respectively. Scores of 5.543, 5.330, and 5.117 for sustainability can be achieved by optimizing all three SD aspects with a long-term, stakeholder-centered approach (scenarios 9, 4, and 6). The proposed sustainability assessment model exhibits robustness through its comprehensive set of 99 environmental, social, and economic indicators; its ability to customize indicator weights under different stakeholder-perspective scenarios; and validation of the quantitative scoring approach through an empirical case study, while continuous improvement would further reinforce its robustness over time.
- 1 January 2024
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 37 (1) , 1-13
Open AccessA New Comprehensive Model for Integrating Environmental, Economic, and Social Performance of Deep and Large-scale Open-Pit Copper Mines
Deep and large-scale (D&LS) open-pit mines pose various environmental, social, and economic impacts on the mining projects’ stakeholders and local, regional, national, and international communities. Identifying these impacts and having a comprehensive model to assess these impacts altogether is critical to achieving sustainable development (SD) goals. This study develops a robust sustainability assessment model for D&LS open-pit mining projects. The model comprehensively considers 99 impact factors across environmental, social, and economic dimensions. The sustainability score is calculated using the Z-FDAHP technique to reduce the bias and uncertainty of experts' judgments. Then, the scenario-based technique is used to apply the stakeholders' perspective to the model. The model is applied to Sungun Copper Mine (SCM) in northwest Iran for verification. Results show SCM's sustainability performance is highly sensitive to index weightings. The highest score was achieved with sole social prioritization (scenario 8 with a sustainability score of 6.364 out of 10), highlighting the critical role of community impacts. Environmental or economic focus alone (scenarios 2 and 5) was not very sustainable, with scores of 3.326 and 5.298 respectively. Scores of 5.543, 5.330, and 5.117 for sustainability can be achieved by optimizing all three SD aspects with a long-term, stakeholder-centered approach (scenarios 9, 4, and 6). The proposed sustainability assessment model exhibits robustness through its comprehensive set of 99 environmental, social, and economic indicators; its ability to customize indicator weights under different stakeholder-perspective scenarios; and validation of the quantitative scoring approach through an empirical case study, while continuous improvement would further reinforce its robustness over time.
- 1 November 2021
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 34 (11) , 2467-2475
Development of open-pit mine reclamation cost estimation models: A regression-based approach
In the recent decade, very few studies have been done on mine reclamation cost estimation and no study has been conducted on proposing mine reclamation cost estimation models based on historical data. This study aims to develop predictor models for mine reclamation costs. To this end, after collecting the historical cost data of 41 open-pit mine reclamation projects, a comprehensive data set of 16 mine reclamation costs groups and the extent of the disturbed mined land corresponding to each group was prepared. Given the advantage of the regression method in developing a reliable predictor model with few data, the proposed cost models are developed based on the regression analysis technique. The R square for all and more than 87% of the developed models was more significant than 85% and 90%, respectively, indicating the proper fits on the data sets. Also, the root mean square error ratio to the standard deviation of observed cost data (RSR) was lower than 0.7 for all developed models, indicating the predictor models' good performance on reliably estimating mine reclamation costs. These efficient and simple general models can help make the right decisions by mine reclamation planners and pave the way to achieve sustainable mining by considering mine reclamation cost in the mine planning and design process.
- 1 November 2021
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 34 (11) , 2467-2475
Development of open-pit mine reclamation cost estimation models: A regression-based approach
In the recent decade, very few studies have been done on mine reclamation cost estimation and no study has been conducted on proposing mine reclamation cost estimation models based on historical data. This study aims to develop predictor models for mine reclamation costs. To this end, after collecting the historical cost data of 41 open-pit mine reclamation projects, a comprehensive data set of 16 mine reclamation costs groups and the extent of the disturbed mined land corresponding to each group was prepared. Given the advantage of the regression method in developing a reliable predictor model with few data, the proposed cost models are developed based on the regression analysis technique. The R square for all and more than 87% of the developed models was more significant than 85% and 90%, respectively, indicating the proper fits on the data sets. Also, the root mean square error ratio to the standard deviation of observed cost data (RSR) was lower than 0.7 for all developed models, indicating the predictor models' good performance on reliably estimating mine reclamation costs. These efficient and simple general models can help make the right decisions by mine reclamation planners and pave the way to achieve sustainable mining by considering mine reclamation cost in the mine planning and design process.
- 1 August 2021
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 35 (10) , 743-763
Mined land suitability assessment: a semi-quantitative approach based on a new classification of post-mining land uses
Mined Land Suitability Assessment (MLSA) is a critical step in mine reclamation planning for ensuring the sustainability of Post-Mining Land-Use (PMLU). In this study, a general semi-quantitative MLSA approach based on the 2D assessment matrix is developed to calculate the mined land suitability score and determine the suitability level. To this end, a new PMLU classification is suggested. The proposed approach is verified in a real case, and the results’ reliability is confirmed by considering this mine’s characteristics. This new approach will facilitate choosing the suitable PMLU with high accuracy due to the assurance of mined land’s suitability.
- 1 August 2021
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 35 (10) , 743-763
Mined land suitability assessment: a semi-quantitative approach based on a new classification of post-mining land uses
Mined Land Suitability Assessment (MLSA) is a critical step in mine reclamation planning for ensuring the sustainability of Post-Mining Land-Use (PMLU). In this study, a general semi-quantitative MLSA approach based on the 2D assessment matrix is developed to calculate the mined land suitability score and determine the suitability level. To this end, a new PMLU classification is suggested. The proposed approach is verified in a real case, and the results’ reliability is confirmed by considering this mine’s characteristics. This new approach will facilitate choosing the suitable PMLU with high accuracy due to the assurance of mined land’s suitability.
- 1 July 2020
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 33 (7) , 1413-1422
A New Developed Model to Determine Waste Dump Site Selection in Open Pit Mines: An Approach to Minimize Haul Road Construction Cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displaced by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main waste dump site will be used as a disposal of waste dump. Apart from considering the characteristics of the waste dump location such as geological and geotechnical properties, the major factors influencing the hauling process are topography, hauling length and construction cost of the haul road. Truck transportation cost depending on the circumstances comprises 45 to 60% of the cost of mining of one tonne ore. Thus, well site selection of waste dump in coordination with the main haul road path confidently leads to a significant saving of economic resources. In this research, while identifying the effective factors in selecting the waste dump sites, a linear mathematical model is developed to find a suitable site for waste dump disposal considering minimizing haul road construction cost.
- 1 July 2020
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 33 (7) , 1413-1422
A New Developed Model to Determine Waste Dump Site Selection in Open Pit Mines: An Approach to Minimize Haul Road Construction Cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displaced by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main waste dump site will be used as a disposal of waste dump. Apart from considering the characteristics of the waste dump location such as geological and geotechnical properties, the major factors influencing the hauling process are topography, hauling length and construction cost of the haul road. Truck transportation cost depending on the circumstances comprises 45 to 60% of the cost of mining of one tonne ore. Thus, well site selection of waste dump in coordination with the main haul road path confidently leads to a significant saving of economic resources. In this research, while identifying the effective factors in selecting the waste dump sites, a linear mathematical model is developed to find a suitable site for waste dump disposal considering minimizing haul road construction cost.
- 6 November 2019
- Published by Taylor & Francis in Engineering Optimization
- Vol. 52 (10) , 1780-1795
Concurrent open-pit mine production and in-pit crushing–conveying system planning
Optimally planned In-Pit Crushing and Conveying (IPCC) systems could resolve the transportation challenges of open-pit mining operations. There is a direct correlation between IPCC planning, Open-Pit Mine Production Scheduling (OPMPS) and the haul fleet sizing problems. Solving each said problem individually does not result in global optimum, nor does it produce a practical solution. This paper develops a new mix-integer linear programming model (called M1) to integrate these problems. The model was validated by comparing it against two other benchmark models where both omit the IPCC planning. The second model (M2) combines OPMPS and truck fleet sizing, but the third one (M3) is a conventional model that deals with OPMPS and fleet sizing, separately. The results indicated that the proposed model outperforms the conventional OPMPS by adding the in-pit crushing values to the project and improving the NPVs by 3.3 and 2.4% for the hypothetical examples.
- 6 November 2019
- Published by Taylor & Francis in Engineering Optimization
- Vol. 52 (10) , 1780-1795
Concurrent open-pit mine production and in-pit crushing–conveying system planning
Optimally planned In-Pit Crushing and Conveying (IPCC) systems could resolve the transportation challenges of open-pit mining operations. There is a direct correlation between IPCC planning, Open-Pit Mine Production Scheduling (OPMPS) and the haul fleet sizing problems. Solving each said problem individually does not result in global optimum, nor does it produce a practical solution. This paper develops a new mix-integer linear programming model (called M1) to integrate these problems. The model was validated by comparing it against two other benchmark models where both omit the IPCC planning. The second model (M2) combines OPMPS and truck fleet sizing, but the third one (M3) is a conventional model that deals with OPMPS and fleet sizing, separately. The results indicated that the proposed model outperforms the conventional OPMPS by adding the in-pit crushing values to the project and improving the NPVs by 3.3 and 2.4% for the hypothetical examples.