Zuraidah Bt. Mohd Zain
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Zuraidah Bt. Mohd Zain has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- A. K. Malek
School of Manufacturing Engineering, Universiti Malaysia Perlis, Kampus Alam Pauh Putra, 02600 Arau, Perlis, Malaysia
2 shared publications A. S. Alaa
2 shared publications- Ashrul Ishak Mohamad Shaiful
Faculty of Mechanical Engineering Technology, Universiti Malaysia Perlis, Malaysia
2 shared publications - Bhuvenesh Rajamony
1,2 (School of Manufacturing Engineering, University Malaysia Perlis, Kampus Tetap Ulu Pauh, Jalan Arau –Changlun, 02600 Arau, Perlis, Malaysia )
1 shared publication M I Hussain
School of Manufacturing Engineering, University Malaysia Perlis, Pauh Putra Campus, 02600 Arau, Perlis, Malaysia
1 shared publication- Mohd Shihabudin Ismail
Faculty of Mechanical Engineering and Technology, Universiti Malaysia Perlis (UniMAP), Perlis, Malaysia
1 shared publication
Latest Publications
- 12 November 2018
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2030 (1) , 020059
Variable value stream mapping: Development of a conceptual model
Of late, lean manufacturing principles are integrated with tools and techniques that belong to other areas of knowledge such as risk management. Lean principles and risk management, when used in tandem with one another, give more benefit to the user, as proven in many studies. In this paper, a review of works on the integration of lean manufacturing and risk management is given. It is observed that there is a strong relationship between lean manufacturing and risk management as they both have a common goal of eliminating and reducing waste. This paper also presents a conceptual model that integrates the two. The components of the model include value stream mapping (VSM) and Monte Carlo simulation. Although the model has not been tested yet, it is anticipated that it will bring more advantage because it takes into account the variability of the process, which is acquired using probability distribution. This is quite a milestone because one of the challenges of VSM is that it is a static tool, and as such, process variability cannot be captured appropriately. This new model is expected to overcome this challenge.
- 12 November 2018
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2030 (1) , 020059
Variable value stream mapping: Development of a conceptual model
Of late, lean manufacturing principles are integrated with tools and techniques that belong to other areas of knowledge such as risk management. Lean principles and risk management, when used in tandem with one another, give more benefit to the user, as proven in many studies. In this paper, a review of works on the integration of lean manufacturing and risk management is given. It is observed that there is a strong relationship between lean manufacturing and risk management as they both have a common goal of eliminating and reducing waste. This paper also presents a conceptual model that integrates the two. The components of the model include value stream mapping (VSM) and Monte Carlo simulation. Although the model has not been tested yet, it is anticipated that it will bring more advantage because it takes into account the variability of the process, which is acquired using probability distribution. This is quite a milestone because one of the challenges of VSM is that it is a static tool, and as such, process variability cannot be captured appropriately. This new model is expected to overcome this challenge.
- Open Access
- 9 November 2018
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 429 (1) , 012001
Development and implementation of FaRSLeSS approach at aircraft composite manufacturing industry : A case study
FaRSLeSS approach is integration between Lean and Six Sigma methods to reduce the failure rate in manufacturing production line. It represents 'Failure Rate Reduction and Sustainability through Lean and Six Sigma". Many manufacturing industries carry out corrective actions for their production line failure rate by using either lean or six sigma methods separately. This may prolong the failures or defects and sometimes even could not be solved effectively. FaRSLeSS approached was developed as guidance to manufacturing companies on the appropriate steps needs to be taken in order to solve the production line failure rate faster and effectively. Besides, this approach also suggests on how to sustain the performance once the failure rate was reduced to the ultimate target. During developing the FaRSLeSS approach, a case study was carried out at aircraft composite manufacturing industry (company A).
- 9 November 2018
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 429 (1) , 012001
Open AccessDevelopment and implementation of FaRSLeSS approach at aircraft composite manufacturing industry : A case study
FaRSLeSS approach is integration between Lean and Six Sigma methods to reduce the failure rate in manufacturing production line. It represents 'Failure Rate Reduction and Sustainability through Lean and Six Sigma". Many manufacturing industries carry out corrective actions for their production line failure rate by using either lean or six sigma methods separately. This may prolong the failures or defects and sometimes even could not be solved effectively. FaRSLeSS approached was developed as guidance to manufacturing companies on the appropriate steps needs to be taken in order to solve the production line failure rate faster and effectively. Besides, this approach also suggests on how to sustain the performance once the failure rate was reduced to the ultimate target. During developing the FaRSLeSS approach, a case study was carried out at aircraft composite manufacturing industry (company A).
- 1 January 2017
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1885, 020128
The effect of lean manufacturing (LM) on environmental performance: A review study
Nowadays, lean manufacturing strategy is very much used to eliminate waste on the manufacturing shop floor. Lean manufacturing has been formulated in response to the fluctuating and competitive business environment. Although it first started in the automotive industry, many organizations in different sectors are enthusiastic to adopt it in order to improve their performance in this competitive globalized market. The aim of this paper is to review the current level of implementation of lean manufacturing practices and the affects of these practices on organizational performances in a multitude of sectors in Malaysian industries. The study is carried out through a thorough review of the literature. It is observed that lean manufacturing is increasingly getting the appropriate attention in Malaysian industries. There are also many challenges in the way, of which numerous attempts are undertaken to overcome them.
- 1 January 2017
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1885, 020128
The effect of lean manufacturing (LM) on environmental performance: A review study
Nowadays, lean manufacturing strategy is very much used to eliminate waste on the manufacturing shop floor. Lean manufacturing has been formulated in response to the fluctuating and competitive business environment. Although it first started in the automotive industry, many organizations in different sectors are enthusiastic to adopt it in order to improve their performance in this competitive globalized market. The aim of this paper is to review the current level of implementation of lean manufacturing practices and the affects of these practices on organizational performances in a multitude of sectors in Malaysian industries. The study is carried out through a thorough review of the literature. It is observed that lean manufacturing is increasingly getting the appropriate attention in Malaysian industries. There are also many challenges in the way, of which numerous attempts are undertaken to overcome them.
- 20 January 2015
- Published by Atlantis Press SARL
- p. 275-282
Non Production Direct Workforce Work Measurement Challenges and Case Study
- 20 January 2015
- Published by Atlantis Press SARL
- p. 275-282
Non Production Direct Workforce Work Measurement Challenges and Case Study