Nedim Radoncic
Nedim Radoncic has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Bernd Moritz
ÖBB‐Infrastruktur AG Streckenmanagement und Anlagenentwicklung Fachbereich Bautechnik – Tunnelbau Europaplatz 2/1 8020 Graz Austria
3 shared publications - Albert Helmberger
IL - Ingenieurbüro Laabmayr & Partner ZT GmbH.; Preishartlweg 4 5020 Salzburg Austria
1 shared publication - Mario Hein
Geoconsult Wien ZT GmbH, Hütteldorfer Straße 85, 1150 Vienna, Austria
1 shared publication - Martin Kern
GTU Koralmtunnel Geoconsult ZT GmbH/Geoconsult Consulting Engineers, Hölzlstraße 5, A-5071 Wals bei Salzburg, Austria
1 shared publication - Martin Weissnar
VSP Stolitzka & Partner ZT GmbH, Schottenfeldgasse 79, A-1070 Vienna, Austria
1 shared publication - Robert Uschan
Behavioral analysis unit
1 shared publication
Latest Publications
- 1 June 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (3) , 265-272
Strain gauges in pre‐cast concrete segments: working principle, evaluation and interpretation / Dehnmessgeber in Tübbingsegmenten – Funktionsweise, Auswertung und Interpretation
In order to obtain an enhanced understanding of the system behaviour, especially with regard to the capacity reserves of the support and general load conditions, measurement pre‐cast concrete rings are used at the ÖBB construction lot KAT2 of the Koralm Tunnel. These are equipped with a strain gauge in each reinforcement layer, thus allowing direct measurement of the strains in every pre‐cast concrete segment.Based on this information, the stress distribution in the respective segment cross‐section can be calculated, allowing section forces determination by integrating them. The used interpolation method allows the presentation of the section forces over circumference of the entire ring based on the measurement data of each segment, while obeying the constraints by the issue of longitudinal joint capacity.The applied calculation method is verified by comparing its results with a numerical 3D analysis. The application of the method is presented by a case study of the measurement ring installation at the ÖBB construction lot KAT2 of the Koralm Tunnel. In addition, further room for research and development is briefly outlined.Um ein besseres Verständnis des Systemverhaltens – speziell im Hinblick auf die Auslastung des Ausbaus und der vorherrschenden Belastungssituation – zu erhalten, werden beim TVM‐Vortrieb auf dem Baulos Koralmtunnel 2 (KAT2) der ÖBB‐Infrastruktur AG Tübbingsegmente mit Dehnmessgebern, sogenannte Messtübbinge, verwendet. Diese sind mit Dehnmessgebern in beiden Bewehrungslagen, in denen die Dehnungen direkt gemessen werden, ausgestattet.Anhand dieser Daten kann die Spannungsverteilung im jeweiligen Tübbingquerschnitt errechnet und in weiterer Folge können über Integration die Schnittkräfte ermittelt werden. Die verwendete Interpolationsmethode ermöglicht, unter Berücksichtigung der Längsfugenbelastbarkeit, die Darstellung der Schnittkräfte über den gesamten Umfang des Tübbingrings, ausgehend von den Ergebnissen an der jeweiligen Position der Dehnmessgeber.Die angewandte Berechnungsmethode wird zur Verifizierung mit den Resultaten einer numerischen 3D‐Berechnung verglichen. Die Anwendung dieser Methodik wird anhand eines Fallbeispiels an einem Messtübbingring, der am Baulos KAT2 eingebaut wurde, vorgestellt. Zusätzlich wird noch kurz auf ausstehende Forschungsthemen und Entwicklungen eingegangen.
- 1 June 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (3) , 265-272
Strain gauges in pre‐cast concrete segments: working principle, evaluation and interpretation / Dehnmessgeber in Tübbingsegmenten – Funktionsweise, Auswertung und Interpretation
In order to obtain an enhanced understanding of the system behaviour, especially with regard to the capacity reserves of the support and general load conditions, measurement pre‐cast concrete rings are used at the ÖBB construction lot KAT2 of the Koralm Tunnel. These are equipped with a strain gauge in each reinforcement layer, thus allowing direct measurement of the strains in every pre‐cast concrete segment.Based on this information, the stress distribution in the respective segment cross‐section can be calculated, allowing section forces determination by integrating them. The used interpolation method allows the presentation of the section forces over circumference of the entire ring based on the measurement data of each segment, while obeying the constraints by the issue of longitudinal joint capacity.The applied calculation method is verified by comparing its results with a numerical 3D analysis. The application of the method is presented by a case study of the measurement ring installation at the ÖBB construction lot KAT2 of the Koralm Tunnel. In addition, further room for research and development is briefly outlined.Um ein besseres Verständnis des Systemverhaltens – speziell im Hinblick auf die Auslastung des Ausbaus und der vorherrschenden Belastungssituation – zu erhalten, werden beim TVM‐Vortrieb auf dem Baulos Koralmtunnel 2 (KAT2) der ÖBB‐Infrastruktur AG Tübbingsegmente mit Dehnmessgebern, sogenannte Messtübbinge, verwendet. Diese sind mit Dehnmessgebern in beiden Bewehrungslagen, in denen die Dehnungen direkt gemessen werden, ausgestattet.Anhand dieser Daten kann die Spannungsverteilung im jeweiligen Tübbingquerschnitt errechnet und in weiterer Folge können über Integration die Schnittkräfte ermittelt werden. Die verwendete Interpolationsmethode ermöglicht, unter Berücksichtigung der Längsfugenbelastbarkeit, die Darstellung der Schnittkräfte über den gesamten Umfang des Tübbingrings, ausgehend von den Ergebnissen an der jeweiligen Position der Dehnmessgeber.Die angewandte Berechnungsmethode wird zur Verifizierung mit den Resultaten einer numerischen 3D‐Berechnung verglichen. Die Anwendung dieser Methodik wird anhand eines Fallbeispiels an einem Messtübbingring, der am Baulos KAT2 eingebaut wurde, vorgestellt. Zusätzlich wird noch kurz auf ausstehende Forschungsthemen und Entwicklungen eingegangen.
- 1 October 2014
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 7 (5) , 565-576
Determination of the system behaviour based on data analysis of a hard rock shield TBM / Analyse der Maschinenparameter zur Erfassung des Systemverhaltens beim Hartgesteins‐Schildvortrieb
Both the technical boundary conditions and the usual advance rates achieved during hard rock TBM shield drives severely limit the ability of the on‐site‐personnel to document the geological conditions and the system behaviour at appropriate intervals. A systematic and continuous short‐term investigation of the rock mass conditions is performed on the construction lot KAT2 of the Koralm Tunnel (obtained by impact drillings and geophysical methods). The difference in scales and the fact that no continuous inspection of the ground conditions can be performed lead to a gap between the prognosis and the observed behaviour and a direct comparison is seldom possible.Based on the daily comparison between the observed behaviour and the analysed machine data, a state‐of‐the‐art interpretation method has been developed. This method allows reliable conclusions regarding the primary aspects of the system behaviour and thus enables deductions on the geological/geotechnical conditions which have been encountered. The identification of the relevant parameters and suitable analysis methods has been performed in a “trial and error” manner: machine parameters deemed relevant in theory have been continuously compared with the observations on site and depending on the results, found usable or discarded.Reliable knowledge about the face stability, qualitative degree of fracturing of the rock mass, occurrence of over excavation in the cutter head area, the state of the annular gap and the blockiness of the rock mass can be deduced by applying this method. The results are used on daily basis by the on‐site geologist and geotechnical engineer in order to verify the prognosis and recommend additional/auxiliary construction measures.Sowohl die technischen Rahmenbedingungen als auch die üblichen Vortriebsgeschwindigkeiten einer Tunnelvortriebsmaschine mit Schild (TVM‐S oder TVM‐DS) im Hartgestein beschränken die Fähigkeit des verantwortlichen Personals, die geologisch‐geotechnischen Verhältnisse bzw. das Systemverhalten anhand der augenscheinlichen Inspektion und der geotechnischen Messdaten zu erfassen. Da am Baulos KAT2 des Koralmtunnels eine systematische und lückenlose Vorauserkundung betrieben wird, entsteht dadurch eine “Lücke” zwischen der Prognose (anhand der Bohrungen und/oder der geophysikalischen Methoden) und den beobachteten Verhältnissen.Auf Grundlage bestehender Veröffentlichungen konnten für die täglichen Vergleiche zwischen dem beobachteten Systemverhalten und den analysierten Maschinendaten im Zuge des kontinuierlichen Vortriebs KAT2 ein Verfahren entwickelt werden, das zuverlässige Aussagen über die wesentlichen Aspekte des Systemverhaltens beim kontinuierlichen Vortrieb erlaubt und somit Rückschlüsse hinsichtlich der aufgefahrenen geologisch‐geotechnischen Verhältnisse ermöglicht. Die Identifikation der relevanten Parameter und der Auswerteverfahren erfolgte im “Trial‐and‐error”‐Verfahren: Alle theoretisch relevant erscheinenden Maschinenparameter wurden mit den Beobachtungen vor Ort verglichen und in den endgültigen Satz von aussagekräftigen Parametern aufgenommen bzw. als unbrauchbar verworfen.Zuverlässige Aussagen über die Ortsbruststabilität, den qualitativen Zerlegungsgrad, die Profilmaßhaltigkeit im Bohrkopfbereich, den Zustand des Ringspalts und die Blockigkeit des Gebirges können mit diesem Verfahren getroffen werden. Die Ergebnisse werden täglich von den verantwortlichen Geologen und Geotechnikern verwendet, um die Prognosen zu verifizieren, das Prognosemodell stetig fortzuschreiben und zu verfeinern und nach Erfordernis Zusatz‐ bzw. Sondermaßnahmen zu empfehlen.
- 1 October 2014
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 7 (5) , 565-576
Determination of the system behaviour based on data analysis of a hard rock shield TBM / Analyse der Maschinenparameter zur Erfassung des Systemverhaltens beim Hartgesteins‐Schildvortrieb
Both the technical boundary conditions and the usual advance rates achieved during hard rock TBM shield drives severely limit the ability of the on‐site‐personnel to document the geological conditions and the system behaviour at appropriate intervals. A systematic and continuous short‐term investigation of the rock mass conditions is performed on the construction lot KAT2 of the Koralm Tunnel (obtained by impact drillings and geophysical methods). The difference in scales and the fact that no continuous inspection of the ground conditions can be performed lead to a gap between the prognosis and the observed behaviour and a direct comparison is seldom possible.Based on the daily comparison between the observed behaviour and the analysed machine data, a state‐of‐the‐art interpretation method has been developed. This method allows reliable conclusions regarding the primary aspects of the system behaviour and thus enables deductions on the geological/geotechnical conditions which have been encountered. The identification of the relevant parameters and suitable analysis methods has been performed in a “trial and error” manner: machine parameters deemed relevant in theory have been continuously compared with the observations on site and depending on the results, found usable or discarded.Reliable knowledge about the face stability, qualitative degree of fracturing of the rock mass, occurrence of over excavation in the cutter head area, the state of the annular gap and the blockiness of the rock mass can be deduced by applying this method. The results are used on daily basis by the on‐site geologist and geotechnical engineer in order to verify the prognosis and recommend additional/auxiliary construction measures.Sowohl die technischen Rahmenbedingungen als auch die üblichen Vortriebsgeschwindigkeiten einer Tunnelvortriebsmaschine mit Schild (TVM‐S oder TVM‐DS) im Hartgestein beschränken die Fähigkeit des verantwortlichen Personals, die geologisch‐geotechnischen Verhältnisse bzw. das Systemverhalten anhand der augenscheinlichen Inspektion und der geotechnischen Messdaten zu erfassen. Da am Baulos KAT2 des Koralmtunnels eine systematische und lückenlose Vorauserkundung betrieben wird, entsteht dadurch eine “Lücke” zwischen der Prognose (anhand der Bohrungen und/oder der geophysikalischen Methoden) und den beobachteten Verhältnissen.Auf Grundlage bestehender Veröffentlichungen konnten für die täglichen Vergleiche zwischen dem beobachteten Systemverhalten und den analysierten Maschinendaten im Zuge des kontinuierlichen Vortriebs KAT2 ein Verfahren entwickelt werden, das zuverlässige Aussagen über die wesentlichen Aspekte des Systemverhaltens beim kontinuierlichen Vortrieb erlaubt und somit Rückschlüsse hinsichtlich der aufgefahrenen geologisch‐geotechnischen Verhältnisse ermöglicht. Die Identifikation der relevanten Parameter und der Auswerteverfahren erfolgte im “Trial‐and‐error”‐Verfahren: Alle theoretisch relevant erscheinenden Maschinenparameter wurden mit den Beobachtungen vor Ort verglichen und in den endgültigen Satz von aussagekräftigen Parametern aufgenommen bzw. als unbrauchbar verworfen.Zuverlässige Aussagen über die Ortsbruststabilität, den qualitativen Zerlegungsgrad, die Profilmaßhaltigkeit im Bohrkopfbereich, den Zustand des Ringspalts und die Blockigkeit des Gebirges können mit diesem Verfahren getroffen werden. Die Ergebnisse werden täglich von den verantwortlichen Geologen und Geotechnikern verwendet, um die Prognosen zu verifizieren, das Prognosemodell stetig fortzuschreiben und zu verfeinern und nach Erfordernis Zusatz‐ bzw. Sondermaßnahmen zu empfehlen.
- 1 October 2013
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 6 (5) , 582-593
Construction shaft of the Koralm Tunnel lot KAT 2 – a challenge in structural analysis, geotechnics and logistics / Der Bauschacht des Koralmtunnels Baulos KAT 2 – eine statische, geotechnische und logistische Herausforderung
- 1 October 2013
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 6 (5) , 582-593
Construction shaft of the Koralm Tunnel lot KAT 2 – a challenge in structural analysis, geotechnics and logistics / Der Bauschacht des Koralmtunnels Baulos KAT 2 – eine statische, geotechnische und logistische Herausforderung