Rodrigo Votto
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Rodrigo Votto has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Linda Lee Ho
Universidade de São Paulo
2 shared publications Fernando Berssaneti
Professor, Departamento de Engenharia de Produção, Universidade de São Paulo, Avenida Professor Almeida Prado, Butantã, São Paulo, SP 05508-070, Brazil
1 shared publication- Fernando Tobal Berssaneti
Department of Production Engineering, Polytechnic School, University of São Paulo, São Paulo 05508-010, Brazil
1 shared publication - Flavio Cesar Faria Fernandes
Universidade Federal de São Carlos, Brasil
1 shared publication
Latest Publications
- 1 September 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 147 (9) , 04021108
Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring
The design of control charts refers to the selection of the sample, the sampling interval, and the width of the control limits. The literature on the use of control charts for project monitoring is concerned mainly with the first two parameters, and does not dedicate enough attention to how to determine the width of the control limits. This paper highlighted the relevant role that the appropriate definition of probabilistic control limit width plays in the project control and the performance of the control charts used to monitor the duration of construction projects. The main contribution is the proposal of a two-step simulation approach to set the most appropriate control limit width. The application of the proposed method was presented. Results demonstrated that there is a trade-off between the performance of the control charts and the control effort to investigate the cause of every warning signal. The preferable choice of is influenced strongly by different project duration targets, risk and uncertainty scenarios estimated in the planning phase, and the team’s risk profile.- 1 September 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 147 (9) , 04021108
Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring
The design of control charts refers to the selection of the sample, the sampling interval, and the width of the control limits. The literature on the use of control charts for project monitoring is concerned mainly with the first two parameters, and does not dedicate enough attention to how to determine the width of the control limits. This paper highlighted the relevant role that the appropriate definition of probabilistic control limit width plays in the project control and the performance of the control charts used to monitor the duration of construction projects. The main contribution is the proposal of a two-step simulation approach to set the most appropriate control limit width. The application of the proposed method was presented. Results demonstrated that there is a trade-off between the performance of the control charts and the control effort to investigate the cause of every warning signal. The preferable choice of is influenced strongly by different project duration targets, risk and uncertainty scenarios estimated in the planning phase, and the team’s risk profile.- Open Access
- 22 November 2013
- Published by FapUNIFESP (SciELO) in Gestão & Produção
- Vol. 21 (1) , 45-63
Produção enxuta e teoria das restrições: proposta de um método para implantação conjunta na Indústria de Bens de Capital sob Encomenda
Ao longo do tempo, a tarefa de desenvolver e gerir sistemas de produção tem se tornado mais complexa e, atualmente, para enfrentar as mudanças de demanda dos clientes e a competição global, os gestores têm a difícil tarefa de combinar a eficiência da produção em massa com a customização da era da produção artesanal pré-industrial. Nesse contexto, as empresas da Indústria de Bens de Capital sob Encomenda (IBCE), expostas a condições de mercado muito adversas, têm buscado estratégias modernas de gestão da produção para melhorar o fluxo de produção e minimizar inconveniências inerentes a seus sistemas de produção. Este artigo estuda a IBCE, em especial os bens de capital de grande porte, também conhecidas como sistemas de produção de grandes montagens, com o objetivo de propor um método de implantação conjunta dos princípios da produção enxuta e da teoria das restrições, com a utilização dos Sistemas de Coordenação de Ordens adequados, para reduzir o lead time de produção e melhorar a pontualidade de entrega.
- 22 November 2013
- Published by FapUNIFESP (SciELO) in Gestão & Produção
- Vol. 21 (1) , 45-63
Open AccessProdução enxuta e teoria das restrições: proposta de um método para implantação conjunta na Indústria de Bens de Capital sob Encomenda
Ao longo do tempo, a tarefa de desenvolver e gerir sistemas de produção tem se tornado mais complexa e, atualmente, para enfrentar as mudanças de demanda dos clientes e a competição global, os gestores têm a difícil tarefa de combinar a eficiência da produção em massa com a customização da era da produção artesanal pré-industrial. Nesse contexto, as empresas da Indústria de Bens de Capital sob Encomenda (IBCE), expostas a condições de mercado muito adversas, têm buscado estratégias modernas de gestão da produção para melhorar o fluxo de produção e minimizar inconveniências inerentes a seus sistemas de produção. Este artigo estuda a IBCE, em especial os bens de capital de grande porte, também conhecidas como sistemas de produção de grandes montagens, com o objetivo de propor um método de implantação conjunta dos princípios da produção enxuta e da teoria das restrições, com a utilização dos Sistemas de Coordenação de Ordens adequados, para reduzir o lead time de produção e melhorar a pontualidade de entrega.