Josiane Cordeiro Seixas
Research Subjects
Research Interests
Josiane Cordeiro Seixas has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Bruno Salomão Penna
AngloGold Ashanti
1 shared publication - Gerson Mendes de Alkmim
AngloGold Ashanti
1 shared publication - Letícia Cristina Alves dos Santos
PARAGON
1 shared publication - Luiz Augusto G. Franzese
Paragon Decision Science, São Paulo, Brazil
1 shared publication - Marcelo Moretti Fioroni
PARAGON Decision Science
1 shared publication
Latest Publications
- Open Access
- 1 December 2014
- Published by FapUNIFESP (SciELO) in Rem: Revista Escola de Minas
- Vol. 67 (4) , 447-454
Logistic evaluation of an underground mine using simulation
This paper describes a logistic study about an underground gold mine, belonging to AngloGold Ashanti, where four different layout options could be applied to the tunnels, and also different transportation strategies. Each evaluated layout had its own configuration for shaft and truck fleets. The study was made individually for each year of the mine operation life, determining the necessary transportation capacity to achieve the planned production for that year. Due to the very restrictive traffic options in the tunnels, a framework was developed to represent the tunnels and traffic rules in a discrete-event simulation model. The results pointed the scenario with the lowest necessary transportation capacity to achieve the planned production.
- 1 December 2014
- Published by FapUNIFESP (SciELO) in Rem: Revista Escola de Minas
- Vol. 67 (4) , 447-454
Open AccessLogistic evaluation of an underground mine using simulation
This paper describes a logistic study about an underground gold mine, belonging to AngloGold Ashanti, where four different layout options could be applied to the tunnels, and also different transportation strategies. Each evaluated layout had its own configuration for shaft and truck fleets. The study was made individually for each year of the mine operation life, determining the necessary transportation capacity to achieve the planned production for that year. Due to the very restrictive traffic options in the tunnels, a framework was developed to represent the tunnels and traffic rules in a discrete-event simulation model. The results pointed the scenario with the lowest necessary transportation capacity to achieve the planned production.