Manuel Bejarano
Research Subjects
Manuel Bejarano has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Ali Azhar Butt
University of California
1 shared publication - Arash Saboori
University of California Davis, Dept. Civil & Environmental Engineering, 1 Shields Ave., Davis, California, 95616, UNITED STATES
1 shared publication B. Aussieker
Atkins North America Inc., 482 South Keller Road, Orlando, Florida 32810
1 shared publication- D. Schilling
Atkins North America Inc
1 shared publication J. Hough
Atkins North America Inc., 482 South Keller Road, Orlando, Florida 32810
1 shared publication- John T. Harvey
Department of Civil and Environmental Engineering, University of California Pavement Research Center, University of California, Davis, CA
1 shared publication
Latest Publications
- Open Access
- 31 December 2020
- Published by MDPI AG in Sustainability
- Vol. 13 (1) , 299
Decision Support in Selecting Airfield Pavement Design Alternatives Using Life Cycle Assessment: Case Study of Nashville Airport
The Federal Aviation Administration (FAA) has taken measures to improve safety, reduce costs, increase resilience, and improve the sustainability of the United States (U.S.) airfield infrastructure by using a life-cycle cost analysis methodology to increase the efficient use of economic resources needed for expanding and preserving the airfield system. However, a life-cycle assessment (LCA) approach for evaluating the environmental impacts of decisions regarding airfield infrastructure has yet to be fully developed and applied. The objective of this study is to demonstrate the use of the airfield LCA framework that was developed for the FAA and can be used by U.S. airports. The comparison of alternative pavement designs at Nashville International Airport (BNA) is presented. The scope of the study was from cradle to laid; materials, materials transportation, and construction stages of the pavement life cycle are considered, and the maintenance, use and end of life stages are not considered. Primary data were acquired from BNA and secondary data were used in situations of unavailability of primary data. The case study showed that performing LCA provides opportunities for airports to consider energy use and environment-related impacts in the decision-making process.
- 31 December 2020
- Published by MDPI AG in Sustainability
- Vol. 13 (1) , 299
Open AccessDecision Support in Selecting Airfield Pavement Design Alternatives Using Life Cycle Assessment: Case Study of Nashville Airport
The Federal Aviation Administration (FAA) has taken measures to improve safety, reduce costs, increase resilience, and improve the sustainability of the United States (U.S.) airfield infrastructure by using a life-cycle cost analysis methodology to increase the efficient use of economic resources needed for expanding and preserving the airfield system. However, a life-cycle assessment (LCA) approach for evaluating the environmental impacts of decisions regarding airfield infrastructure has yet to be fully developed and applied. The objective of this study is to demonstrate the use of the airfield LCA framework that was developed for the FAA and can be used by U.S. airports. The comparison of alternative pavement designs at Nashville International Airport (BNA) is presented. The scope of the study was from cradle to laid; materials, materials transportation, and construction stages of the pavement life cycle are considered, and the maintenance, use and end of life stages are not considered. Primary data were acquired from BNA and secondary data were used in situations of unavailability of primary data. The case study showed that performing LCA provides opportunities for airports to consider energy use and environment-related impacts in the decision-making process.
- 24 August 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 396-405
In-Place Stabilization for the Rehabilitation of Taxiway S at Nashville International Airport
At Nashville International Airport, Taxiway S is a parallel taxiway to Runway 2C-20C constructed in concrete and asphalt and divided in 8 different sections. The asphalt sections between Taxiway N and S5 were the most deteriorated and required rehabilitation due to the amount of distresses recorded. Distresses included load and climate related cracking, weathering and raveling. The pavement was estimated to be more than 40 years old with the last recorded mill and overlay rehabilitation conducted in 1983. The pavement investigation revealed that the asphalt sections did not have the structural capacity to carry the anticipated traffic operations. Replacement was initially considered as the only alternative since a structural overlay was not feasible due to violations to the runway’s primary surface. Removing the entire pavement full-depth was an expensive alternative; therefore, other alternatives such as stabilizing the existing aggregate base to provide a stronger base over the soft clayey subgrade were considered. The initial plan was to stabilize 10 inches of aggregate base in-place to avoid exposing the underlying clayey soil. After the base was completed a 9-inch asphalt layer was to be constructed. In theory, the approach was feasible but the limited number of subcontractors in the area was a challenge. After a detailed evaluation that included life cycle cost analysis, risk assessment, sustainability and availability of contractors, the in-place stabilization of the existing aggregate base was selected. The Federal Aviation Administration P-304 specification was modified for the in-place stabilization process. This paper briefly discusses the planning, design and construction considerations conducted for the completion of this project.
- 24 August 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 396-405
In-Place Stabilization for the Rehabilitation of Taxiway S at Nashville International Airport
At Nashville International Airport, Taxiway S is a parallel taxiway to Runway 2C-20C constructed in concrete and asphalt and divided in 8 different sections. The asphalt sections between Taxiway N and S5 were the most deteriorated and required rehabilitation due to the amount of distresses recorded. Distresses included load and climate related cracking, weathering and raveling. The pavement was estimated to be more than 40 years old with the last recorded mill and overlay rehabilitation conducted in 1983. The pavement investigation revealed that the asphalt sections did not have the structural capacity to carry the anticipated traffic operations. Replacement was initially considered as the only alternative since a structural overlay was not feasible due to violations to the runway’s primary surface. Removing the entire pavement full-depth was an expensive alternative; therefore, other alternatives such as stabilizing the existing aggregate base to provide a stronger base over the soft clayey subgrade were considered. The initial plan was to stabilize 10 inches of aggregate base in-place to avoid exposing the underlying clayey soil. After the base was completed a 9-inch asphalt layer was to be constructed. In theory, the approach was feasible but the limited number of subcontractors in the area was a challenge. After a detailed evaluation that included life cycle cost analysis, risk assessment, sustainability and availability of contractors, the in-place stabilization of the existing aggregate base was selected. The Federal Aviation Administration P-304 specification was modified for the in-place stabilization process. This paper briefly discusses the planning, design and construction considerations conducted for the completion of this project.
- 5 June 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 351-362
Case History: Concrete Pavement Reconstruction of the Intersection of Runway 18L-36R and 8-26 at Tulsa Int’l Airport
As part of the Capital Improvement Program at Tulsa International Airport, reconstruction of the runways 18-36 and 8-26 intersection was conducted to address Foreign Object Debris (FOD) caused by D-cracking deterioration of the concrete in the form of joint and corner spalling and popouts. Detailed planning and design for the reconstruction of the intersection was conducted to meet the Airport’s requirements of having at least one runway open for passenger and cargo traffic during weekdays. To limit interruptions to traffic operations, reconstruction of the runway intersection was conducted over weekend closures with limited night week closures for minor work. The concrete pavement was constructed with dowels but it was designed assuming no load transfer at the joints to provide a conservative approach. The approach allowed using the existing non-stabilized aggregate base since stabilized bases are required under rigid pavements serving aircraft weighing 100,000 lbs or more. To limit damage of the existing aggregate base/clayey subgrade system the slabs were to be removed by the lift method only. The design required removing the existing 25 foot concrete slabs and replacing them with 18.75 foot by 20 foot concrete slabs at a slightly different grade than existing. To accomplish this and to minimize the number of weekend closures, the new concrete was to be placed in 37.5 foot paving lanes with a saw cut in the middle. This required careful considerations during demolition since the runway intersection was to be operational during weekdays. The contractor paved 38.5 foot lanes to provide grade transition to existing. The transition portion was saw cut during removal of the adjacent lane. The design also required the use of conventional concrete mixes with dense graded aggregates mixes to attain a flexural strength of 550 psi after 24 hours and 650 psi at 28 days. This was accomplished by using dense graded aggregates, and 7.5 sacks of cementitious material which included 25% fly ash replacement. The proposed mixture was considered adequate for the cold to moderate air temperatures expected during construction. Construction details included measures for avoiding sympathy cracking, thermo-cracking impact due to temperature variations, transitions from existing to new grades, requirements for back-up equipment, etc.
- 5 June 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 351-362
Case History: Concrete Pavement Reconstruction of the Intersection of Runway 18L-36R and 8-26 at Tulsa Int’l Airport
As part of the Capital Improvement Program at Tulsa International Airport, reconstruction of the runways 18-36 and 8-26 intersection was conducted to address Foreign Object Debris (FOD) caused by D-cracking deterioration of the concrete in the form of joint and corner spalling and popouts. Detailed planning and design for the reconstruction of the intersection was conducted to meet the Airport’s requirements of having at least one runway open for passenger and cargo traffic during weekdays. To limit interruptions to traffic operations, reconstruction of the runway intersection was conducted over weekend closures with limited night week closures for minor work. The concrete pavement was constructed with dowels but it was designed assuming no load transfer at the joints to provide a conservative approach. The approach allowed using the existing non-stabilized aggregate base since stabilized bases are required under rigid pavements serving aircraft weighing 100,000 lbs or more. To limit damage of the existing aggregate base/clayey subgrade system the slabs were to be removed by the lift method only. The design required removing the existing 25 foot concrete slabs and replacing them with 18.75 foot by 20 foot concrete slabs at a slightly different grade than existing. To accomplish this and to minimize the number of weekend closures, the new concrete was to be placed in 37.5 foot paving lanes with a saw cut in the middle. This required careful considerations during demolition since the runway intersection was to be operational during weekdays. The contractor paved 38.5 foot lanes to provide grade transition to existing. The transition portion was saw cut during removal of the adjacent lane. The design also required the use of conventional concrete mixes with dense graded aggregates mixes to attain a flexural strength of 550 psi after 24 hours and 650 psi at 28 days. This was accomplished by using dense graded aggregates, and 7.5 sacks of cementitious material which included 25% fly ash replacement. The proposed mixture was considered adequate for the cold to moderate air temperatures expected during construction. Construction details included measures for avoiding sympathy cracking, thermo-cracking impact due to temperature variations, transitions from existing to new grades, requirements for back-up equipment, etc.
- 5 June 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 477-487
CRCP Design for Guided Bus Route in the UK
A Continuously Reinforced Concrete Pavement (CRCP) design was prepared for a non-uniform pavement section of a dedicated guided bus route in the United Kingdom. The non-uniform section required full-depth thickness along the channelized wheel path and reduced thickness in the middle section which serves as drainage path. Using the current CRCP standard design method for UK presented a challenge because it was assumed that the method intrinsically accounts for lateral wander and therefore not applicable for channelized traffic. It was decided that a project specific design approach was needed for this project. Two structural models were used to understand the impact of reduced thickness in the middle section on the wheel path portion of the pavement. The first structural model is a generic finite element program that could simulate the response of any type of geometry. The second structural model is the pavement program EVERFE which was used to calibrate the generic finite element program for a uniform pavement thickness. Once the generic program was calibrated, the generic program with non-uniform thickness was used to understand the reduced pavement thickness in the middle portion of the section and its influence on the traffic path portion. This paper summarizes the structural analysis and the final design prepared for the project. The non-uniform section also includes an integrated curb as part of the guided bus route, which has tight horizontal spacing requirements to meet the operation demands of the guided bus system. The approach for developing the longitudinal and transverse reinforcement was similar to current state of art CRCP design methods.
- 5 June 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 477-487
CRCP Design for Guided Bus Route in the UK
A Continuously Reinforced Concrete Pavement (CRCP) design was prepared for a non-uniform pavement section of a dedicated guided bus route in the United Kingdom. The non-uniform section required full-depth thickness along the channelized wheel path and reduced thickness in the middle section which serves as drainage path. Using the current CRCP standard design method for UK presented a challenge because it was assumed that the method intrinsically accounts for lateral wander and therefore not applicable for channelized traffic. It was decided that a project specific design approach was needed for this project. Two structural models were used to understand the impact of reduced thickness in the middle section on the wheel path portion of the pavement. The first structural model is a generic finite element program that could simulate the response of any type of geometry. The second structural model is the pavement program EVERFE which was used to calibrate the generic finite element program for a uniform pavement thickness. Once the generic program was calibrated, the generic program with non-uniform thickness was used to understand the reduced pavement thickness in the middle portion of the section and its influence on the traffic path portion. This paper summarizes the structural analysis and the final design prepared for the project. The non-uniform section also includes an integrated curb as part of the guided bus route, which has tight horizontal spacing requirements to meet the operation demands of the guided bus system. The approach for developing the longitudinal and transverse reinforcement was similar to current state of art CRCP design methods.