MLMichael R. Lewis

Michael R. Lewis

*This is an algorithmically generated author record based on publicly available information.

Michael R. Lewis has a total of 24 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Measured and Predicted V S Values of a Granular Backfill Test Pad

    by Kenneth H. Stokoe, Sungmoon Hwang, Michael Boone, Michael R. Lewis, Yaning Wang, Matthew F. Cooke, Andrew Keene

    A backfill test pad of sand to silty sand was constructed to evaluate the stress-dependent properties of the backfill material. The test pad was about 6.1 m thick and was constructed to assess the potential of using on-site granular soils as Category-1 compacted backfill for a potential nuclear-power reactor site. During construction, compaction testing and surface-wave seismic (SASW) testing were performed at backfill thicknesses of about 2.1, 4.3, and 6.1 m. Additional testing of the completed test pad included borings, standard penetration tests, seismic piezocone penetration tests, and crosshole and downhole seismic tests. The in situ testing was complimented with laboratory testing, including modified Proctor compaction tests and resonant column testing. The focus in this paper is on the in situ, small-strain shear wave velocities (VS) and comparisons between: (1) different field seismic methods, (2) field and laboratory measurements, and (3) predictions from correlations based on empirical equations and penetration resistances.


  • In Situ and Laboratory Measured Dynamic Properties of a Marine Clay

    by Albert R. Kottke, Andrew Keene, Yaning Wang, Boonam Shin, Kenneth H. Stokoe, Michael R. Lewis

    Combined resonant-column/torsional-shear tests were performed on four specimens of marine clay collected at varying depths over a range of confining pressures commensurate with the specimen depths. Using the small-strain measurements from these tests, the influences of stress state and void ratio on the small-strain shear stiffness, shear-wave velocity, and material damping ratio were studied. As the confining pressure increases and the specimen consolidates, both the shear stiffness and velocity increase. The rate of this increase follows typical trends of consolidation curves: less sensitive during recompression and unloading, and more sensitive during virgin compression. The laboratory-measured Vs showed good agreement with the field values with little evidence of sample disturbance. The influence of stress on Gmax and Vs was also found to be in good agreement with the laboratory. The relationship between the stress state, void ratio, and material damping is more complicated and does not show as consistent a behavior.


  • Liquefaction Case History: Comparing Methods

    by M. D. Boone, R. J. Williams, M. R. Lewis

    Seismic liquefaction assessments continue to evolve as the industry continues to refine and improve current analytical methods resulting from additional liquefaction case history data being acquired. However, one area that is still somewhat in its infancy is the effect aging has on the cyclic strength of soils. Several recent studies have been carried out and reported in the literature that conclude aging is a phenomenon that is real. If that is the case, then aging needs to be incorporated into our current liquefaction analysis procedures to avoid the unnecessary high cost of remediation and/or wholesale cancelation of projects. However, questions still arise regarding the details of how aging is specifically incorporated in the liquefaction susceptibility analysis.

  • Risk Evaluation and Mitigation for Mechanically-Stabilized Earth (MSE) Walls—Perspectives from an EPC/EPCM Contractor

    by J. L. M. Clemente, K. A. Lamote, J. R. Davie, M. R. Lewis, Edited by C. Yoga Chandran, Ph.D., G.E.1; Marc I. Hoit, Ph.D.21Senior Project Manager, CH2M Hill2Vice Chancellor for Information Technology, North Carolina State University, Ph.D., F.Asce, M.Asce

    Major engineering, procurement and construction/construction management (EPC/EPCM) projects often include large-scale MSE walls. These walls are used in mining and power projects (around crushers), infrastructure projects (roadway embankments), etc., and are required to meet strict performance specifications. Wall malfunction/failure can significantly impact the project. Thus, design and construction of such MSE walls require close coordination between the EPC/EPCM contractor and the MSE subcontractor/contractor to ensure successful outcomes. An extensive literature search conducted to identify and review case histories dealing with MSE wall malfunctions and/or failures is presented. An anonymous MSE wall survey was prepared and sent to MSE wall specialty subcontractors/contractors and other geoprofessionals. They were asked to share their knowledge and experience with the design, construction, and performance monitoring of MSE walls. The survey consisted of questions and requests for feedback describing the work process employed for the design and construction of MSE walls as well as positive and negative experiences. A summary description of the survey along with a summary of the evaluation of the survey responses is included here. The survey responses provided unique, unpublished information and also served to complement the literature search. Results of the literature search were combined with the survey responses to identify opportunities for best practices and lessons learned.


  • Geo-Characterization of Brownfield Site for Modernization of a Large Industrial Facility

    by José L. M. Clemente, Dena G. Morgan, Michael R. Lewis

    A multi-phase subsurface investigation (SI) program was performed to provide geo-characterization of a brownfield site for the modernization of a large industrial facility. During the planning and implementation of the sitewide SI, the following factors were considered: (1) facility/structure loading, geometry, and function; (2) site subsurface conditions disclosed by multiple previous SI programs; (3) field testing methodology, (4) new and revised geohazard evaluation criteria; and (5) funding and schedule constraints. The adopted SI program planning and implementation approach/philosophy is described, and the work carried out for one specific structure is used for illustration. The benefits of the SI approach in mitigating subsurface risk in a cost effective manner are demonstrated. Lessons learned that could be useful to practitioners confronted with site geo-characterization for large-scale projects are discussed. The focus of this manuscript is on the geotechnical aspects of the site; environmental considerations are not addressed.

  • Instrumented Pile Load Testing Program for a Coal-Fired Power Plant

    by José L.M. Clemente, Michael R. Lewis

    An extensive preproduction probe pile load testing program was conducted for a coal-fired power plant in New Jersey to minimize pile performance uncertainty resulting from variable subsurface conditions and identify the most cost-effective and technically suitable piling system for the project. Three types of piles were instrumented and tested: Monotube, closed-end pipe, and step-tapered. This manuscript includes a general description of the site and its geologic conditions, along with subsurface and groundwater conditions in the vicinity of the pile load test areas. A summary of the test pile installation, including driving records and dynamic monitoring, is provided, and results are compared with geotechnical data obtained from borings drilled in the pile load test areas. Compressive static pile load test results are presented, and pile instrumentation results are interpreted. Average unit shaft resistance values are calculated and compared to field-measured shearing strength of site soils. Comparison of pile behavior based on the results of the load test program, along with cost and schedule considerations, served as the basis for the selection of the production piles for the facility.

  • Performance Monitoring of Structures Founded on Coastal Plain Sediments in the SE United States

    by M. R. Lewis, J. R. Davie, M. D. McHood

    Performance monitoring of structures is an important aspect of geotechnical engineering that routinely is overlooked. All too often once the geotechnical report is written and submitted to the client, the geotechnical engineer is not involved further in the project unless there is a problem. In many cases of unsatisfactory performance involving geotechnical engineering, the problem is generally related to structure settlement. This paper presents the results of long-term settlement monitoring of several moderately- to heavily-loaded structures located in the southeastern United States (SEUS). The structures bear on typical Coastal Plain sediments and have had ongoing settlement monitoring programs. Comparisons of predicted and measured settlement are made and recommendations for future settlement prediction on similar soils are given.


  • Event Tree Analysis at the Savannah River Site—A Case History

    by Rucker J. Williams, Michael R. Lewis

    At the Savannah River Site (SRS), a Department of Energy (DOE) installation in west-central South Carolina, a unique geologic stratum exists at depth that has the potential to cause surface settlement resulting from a seismic event. In the past the particular stratum in question has been remediated via pressure grouting, however, the benefits of remediation have always been debatable. Recently the SRS has attempted to frame the risk issue in terms of an event tree or decision tree analysis. This paper describes that analysis, including the input data required.

  • Evaluating Shear Wave Velocity of In-Place Compacted Backfill

    by J. C. Damm, M. R. Lewis, Ii K. H. Stokoe, D. P. Moore

    The shear wave velocity profile of a soil column is often used to assist in the characterization of a site. Most often, this column consists of native, undisturbed materials. If backfill is required for the final site configuration, the shear wave velocity of the backfill is typically estimated from empirical relationships. Very seldom are measurements of the backfill made to obtain a site specific shear wave velocity profile.