  • Concrete Recycling and Utilization of Recycled Concrete: An Investigation of the Barriers and Drivers within the Phoenix Metropolitan Area

    by J. D. Thompson, H. H. Bashford

    Contractors are looking for ways to incorporate sustainable business practices into their daily operations that reduce cost. Diverting waste from the landfill is one way that contractors can reduce the environmental impact of construction. Construction is the largest contributor to landfill waste and concrete accounts for a significant portion of that waste. In turn, concrete waste can easily be recycled and reused as aggregate base course under roadway pavements and building slabs. Using recycled concrete in this manner reduces the environmental impact of construction by diverting waste and limiting the amount of virgin aggregate required for construction. Since aggregate is a finite resource, recycling and using recycled concrete limits the quantity of natural resources needed to support construction activity. This research identified barriers and drivers associated with recycling concrete and using the recycled material in new construction in the Phoenix metropolitan area. Data was collected through interviews with general contractors, demolition contractors, concrete recyclers, and engineers, as well as observation of jobsite activities. The results of this research revealed that the infrastructure for recycling and reusing concrete material is in place but there is a need to establish that recycled concrete is an acceptable material for use as base material in the Phoenix area, and there is a need for education and awareness among the stakeholders. Factors impacting the decision to recycle versus sending concrete debris to a landfill were not cost and proximity as expected but were the result of existing relationships contractors have with disposal locations. The factors impacting whether or not to utilize recycled material were lack of enabling standard specifications, perception of risk, and the regulatory environment of the municipality where the construction takes place.


  • The Business Case for Using Compressed Natural Gas Fuel in Concrete Mixer Trucks

    by H. H. Bashford, J. D. Thompson

    Contractors are working towards defining their role in the movement towards sustainability in the built environment. Amongst all of the uncertainty surrounding this quest, one thing is certain: solutions must be based upon sound financial principles. Transportation during the construction process has been identified as one area where the environmental impacts of construction may be reduced. Compressed natural gas is an alternative fuel that could be used in concrete mixer trucks to increase the environmental performance of the construction process. The question is: will switching from diesel fuel to compressed natural gas save money while providing increased value during the construction process? This research examines the various costs, impacts, and savings involved in such a transition. Results of the study indicate the cost is a function of numerous operational parameters, government policies, and cost and availability of compressed natural gas. A general multi-variant financial model was developed to aid in the analysis. The model may be used by companies who wish to determine if switching to natural gas would be feasible for their operation.

  • Residential Construction and the Influence of Inspections on Cycle Time

    by Howard Bashford, Anil Sawhney, Kenneth Walsh, Jacqueline Thompson

    A key component of the homebuilding process is inspection of construction by the building permitting agency within the jurisdiction where the work is performed. Several inspections are made throughout the construction process, but four of the inspections, pre-slab, framing, drywall, and final, lie on the work schedule critical path. This research focuses upon these particular inspections to determine if the inspection failures influence construction cycle time. Inspections of production homes are examined to determine how often these critical path inspections do not pass the first time, and how many reinspections are required. The number of days utilized to pass those inspections and reinspections is also measured and reported. The research finds that, on average, 12 days are required, to pass these critical path inspections, thus adding 8 days to the construction cycle time. When these inspections do not pass the first time the inspection is made, rework and reinspections must be completed before construction can proceed. The results show that this process may occur within the same day as the original inspection, and the subsequent inspection takes place the next day. More research is necessary to determine precisely why these inspection failures occur, what cost is incurred because of such failures, and in turn, what opportunities are lost.