Jyotirmoy Sircar
Research Subjects
Jyotirmoy Sircar has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Carlos E. Ospina
BergerABAM
2 shared publications - Brian S. Maxwell
Senior Project Manager, BergerABAM, 700 NE Multnomah Street, Suite 900, Portland, OR 97232
1 shared publication - Greg Westrand
Senior Project Manager, BergerABAM, 700 NE Multnomah Street, Suite 900, Portland, OR 97232
1 shared publication - Howard A. Wells
Senior Project Manager, BergerABAM, 700 NE Multnomah Street, Suite 900, Portland, OR 97232
1 shared publication - Jhon Paul Smith-Pardo
Seattle University
1 shared publication - John Bardi
BergerABAM
1 shared publication
Latest Publications
- 6 June 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 557-566
Reclamation for a Bulk and Container Terminal Complex in a High Seismicity Region
The Pacific coast of Colombia is currently home to one of the biggest maritime infrastructure projects under development in Latin America. Located on the Aguadulce Peninsula, facing the Port of Buenaventura, with an area of more than 35 hectares, the land reclamation project is a key part of an $800 million program to develop the Boscoal (bulk handling) and SPIA (container) terminals. The Aguadulce Peninsula is a greenfield site, located in one of the highest seismic regions in the world. The site is characterized by the presence of thick layers of very soft marine sediments overlying stiffer layers of clay and mudstone. The site experiences heavy rainfall all year long and the portions of both terminals facing the sea can be exposed to tidal variations of up to 5 meters. This paper describes the technical solutions for the land reclamation implemented in the different upland portions of the two terminals and how the technical and logistic challenges brought about by the presence of soft soils, the high seismicity of the region, the remoteness of the site and lack of good fill soils were overcome. Because of the high cost of importing good quality fill materials, optimization of available in-situ materials for reuse as part of the land reclamation was necessary. Thus, a land reclamation concept consisting of lime stabilization of suitable in-situ soft materials was implemented. A combination of sheetpile bulkheads with tie-backs and soil-filled bags retained the stabilized soil fill. In areas with shallow soft soils, the reclamation involved partial removal of soft soils, whereas in areas with very thick soft soil layers subject to heavy operational loads, unsuitable soils were improved with rigid inclusions in varying patterns. To ensure adequate bearing capacity and global stability for the reclaimed zones, an extensive geo-structural study was undertaken. The studies examined the effects of the operational and seismic loads on the stability of the different fill retaining systems and backfilled zones during and after construction. When constructed, the upland portions of the terminals will provide the needed container and bulk storage needs of the terminals.
- 6 June 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 557-566
Reclamation for a Bulk and Container Terminal Complex in a High Seismicity Region
The Pacific coast of Colombia is currently home to one of the biggest maritime infrastructure projects under development in Latin America. Located on the Aguadulce Peninsula, facing the Port of Buenaventura, with an area of more than 35 hectares, the land reclamation project is a key part of an $800 million program to develop the Boscoal (bulk handling) and SPIA (container) terminals. The Aguadulce Peninsula is a greenfield site, located in one of the highest seismic regions in the world. The site is characterized by the presence of thick layers of very soft marine sediments overlying stiffer layers of clay and mudstone. The site experiences heavy rainfall all year long and the portions of both terminals facing the sea can be exposed to tidal variations of up to 5 meters. This paper describes the technical solutions for the land reclamation implemented in the different upland portions of the two terminals and how the technical and logistic challenges brought about by the presence of soft soils, the high seismicity of the region, the remoteness of the site and lack of good fill soils were overcome. Because of the high cost of importing good quality fill materials, optimization of available in-situ materials for reuse as part of the land reclamation was necessary. Thus, a land reclamation concept consisting of lime stabilization of suitable in-situ soft materials was implemented. A combination of sheetpile bulkheads with tie-backs and soil-filled bags retained the stabilized soil fill. In areas with shallow soft soils, the reclamation involved partial removal of soft soils, whereas in areas with very thick soft soil layers subject to heavy operational loads, unsuitable soils were improved with rigid inclusions in varying patterns. To ensure adequate bearing capacity and global stability for the reclaimed zones, an extensive geo-structural study was undertaken. The studies examined the effects of the operational and seismic loads on the stability of the different fill retaining systems and backfilled zones during and after construction. When constructed, the upland portions of the terminals will provide the needed container and bulk storage needs of the terminals.
- 6 June 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 607-616
Container Wharf with an Innovative Precast Deck in a High Seismicity Area
Located on the remote Aguadulce Peninsula in Buenaventura on the Pacific coast of Colombia, the Sociedad Puerto Industrial de Aguadulce (SPIA) container wharf is a T-headed pile-supported wharf comprising a 600-meter-long quay connected to a 160-meter-long access trestle and a 25-meter-long platform. The wharf is designed to support Super Post-Panamax ship-to-shore cranes and berth 12,500-TEU container vessels. The marine contractor chose to build the wharf with a top-down construction system to expedite construction. The benefits of this system were maximized by the implementation of a deck system composed primarily of precast concrete (PC) elements over high-capacity driven steel pipe piles. The deck system involved the use of an innovative PC plug providing the connection between the pipe piles and the PC deck elements. The PC plugs had to not only provide structural performance equivalent to the widely accepted cast-in-place concrete plugs, but also had to be optimized for transportation and erection. This paper describes how the different PC elements forming the wharf deck system were designed, detailed, erected, and connected. The paper also presents key results of the seismic analyses and design. The design of the deck was particularly challenging because of the need to implement seismic capacity protection principles in one of the world’s highest seismic areas. The paper also elaborates on how the top-down construction system was implemented. This system lends itself to a linear construction approach that uses previously-installed steel pipe piles as supporting elements of a platform that rapidly installs future piles and PC deck elements and then moves forward to continue with the rest of construction.
- 6 June 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 607-616
Container Wharf with an Innovative Precast Deck in a High Seismicity Area
Located on the remote Aguadulce Peninsula in Buenaventura on the Pacific coast of Colombia, the Sociedad Puerto Industrial de Aguadulce (SPIA) container wharf is a T-headed pile-supported wharf comprising a 600-meter-long quay connected to a 160-meter-long access trestle and a 25-meter-long platform. The wharf is designed to support Super Post-Panamax ship-to-shore cranes and berth 12,500-TEU container vessels. The marine contractor chose to build the wharf with a top-down construction system to expedite construction. The benefits of this system were maximized by the implementation of a deck system composed primarily of precast concrete (PC) elements over high-capacity driven steel pipe piles. The deck system involved the use of an innovative PC plug providing the connection between the pipe piles and the PC deck elements. The PC plugs had to not only provide structural performance equivalent to the widely accepted cast-in-place concrete plugs, but also had to be optimized for transportation and erection. This paper describes how the different PC elements forming the wharf deck system were designed, detailed, erected, and connected. The paper also presents key results of the seismic analyses and design. The design of the deck was particularly challenging because of the need to implement seismic capacity protection principles in one of the world’s highest seismic areas. The paper also elaborates on how the top-down construction system was implemented. This system lends itself to a linear construction approach that uses previously-installed steel pipe piles as supporting elements of a platform that rapidly installs future piles and PC deck elements and then moves forward to continue with the rest of construction.
- 12 August 2013
- Published by American Society of Civil Engineers (ASCE)
- p. 999-1008
Rail Trench Structure Design at Port of Vancouver USA
Located at the Port of Vancouver USA, the West Vancouver Freight Access Schedule 2 Rail Project 16 will connect the BNSF north/south mainline track with the Port rail system. The current rail entrance blocks the mainline when unit trains enter or leave the Port. This resulted in the need to develop a new entrance, the only feasible alignment being along the north bank of the Columbia River and beneath the existing BNSF Bridge 9.6. A 1,350-foot (411.5 meters) portion of this track will be carried by a partially elevated reinforced concrete structure that will protect the rail from 100-year flood waters and support it along the irregular river bank. This paper describes the constraints that dictated the design features and the resulting configuration of the partially elevated reinforced concrete structure. To resist flooding and provide the required clearance under the existing rail bridge, a watertight, continuous concrete trench was selected as the preferred solution. Closely spaced batter piles support 1,100 feet (335.3 meters) of the trench and provide lateral resistance to seismic loads and buoyancy resistance. Portions of the rail trench structure will be constructed below the U.S. Army Corps of Engineers' ordinary high water mark of the river and will be subjected to in-water work timing restrictions. The river is home to several species listed under the Endangered Species Act, and the Port has undertaken a very low-impact approach to construction of the rail trench: no work will be conducted in the flowing water of the river. This necessitates careful planning and sequencing of the work, taking into account projected river levels and tidal fluctuations. Other challenges include an extremely constricted site with limited access and the need to minimize impacts on adjacent tenants and their operations. When constructed, the rail trench structure will provide a unique facility designed to meet the latest structural, seismic, and environmental requirements and maximize operational efficiency for the Port.
- 12 August 2013
- Published by American Society of Civil Engineers (ASCE)
- p. 999-1008
Rail Trench Structure Design at Port of Vancouver USA
Located at the Port of Vancouver USA, the West Vancouver Freight Access Schedule 2 Rail Project 16 will connect the BNSF north/south mainline track with the Port rail system. The current rail entrance blocks the mainline when unit trains enter or leave the Port. This resulted in the need to develop a new entrance, the only feasible alignment being along the north bank of the Columbia River and beneath the existing BNSF Bridge 9.6. A 1,350-foot (411.5 meters) portion of this track will be carried by a partially elevated reinforced concrete structure that will protect the rail from 100-year flood waters and support it along the irregular river bank. This paper describes the constraints that dictated the design features and the resulting configuration of the partially elevated reinforced concrete structure. To resist flooding and provide the required clearance under the existing rail bridge, a watertight, continuous concrete trench was selected as the preferred solution. Closely spaced batter piles support 1,100 feet (335.3 meters) of the trench and provide lateral resistance to seismic loads and buoyancy resistance. Portions of the rail trench structure will be constructed below the U.S. Army Corps of Engineers' ordinary high water mark of the river and will be subjected to in-water work timing restrictions. The river is home to several species listed under the Endangered Species Act, and the Port has undertaken a very low-impact approach to construction of the rail trench: no work will be conducted in the flowing water of the river. This necessitates careful planning and sequencing of the work, taking into account projected river levels and tidal fluctuations. Other challenges include an extremely constricted site with limited access and the need to minimize impacts on adjacent tenants and their operations. When constructed, the rail trench structure will provide a unique facility designed to meet the latest structural, seismic, and environmental requirements and maximize operational efficiency for the Port.
- 12 August 2013
- Published by American Society of Civil Engineers (ASCE)
- p. 1235-1244
Post-Earthquake Repair and Improvements, San Vicente, Chile
The magnitude 8.8 earthquake of February 2010 in Chile dealt a heavy blow to the 600-meter (2,000-ft) wharf structure at Berths 1, 2, and 3 of the San Vicente Terminal Internacional in the Biobio region of Chile. Earthquake-induced liquefaction and lateral spreading in the upland fill and wharf slope resulted in permanent wharf lateral deflections in excess of 600 mm (24 in), along with associated damage to concrete piling and pile-to-cap connections. This paper presents the post-earthquake repair and rehabilitation program for the wharf structure. The proposed rehabilitation strategy consisted of two phases: first, a structural assessment of the post-earthquake conditions with recommendations for short-term repairs and restrictions on operating criteria, followed by a structural retrofit program designed to stiffen the existing structure and provide a new lateral-force resisting system. An innovative approach to the seismic retrofit was used, which incorporates a combination of new plumb piles behind the wharf with ground improvement to ensure ample lateral strength and ductility capacity of the structure. The wharf retrofit also included a new apron structure in front of the wharf, designed to improve the local stability of existing slender piling (impacted by P-delta effects), with the added benefit of providing support for future crane rail installation and increased dredge depth. Finally, a 200-meter (656-ft) finger pier extension was included in the program, bringing the structurally retrofitted 4-berth system to a total combined 800 meters in length, designed to the most current seismic design standards.
- 12 August 2013
- Published by American Society of Civil Engineers (ASCE)
- p. 1235-1244
Post-Earthquake Repair and Improvements, San Vicente, Chile
The magnitude 8.8 earthquake of February 2010 in Chile dealt a heavy blow to the 600-meter (2,000-ft) wharf structure at Berths 1, 2, and 3 of the San Vicente Terminal Internacional in the Biobio region of Chile. Earthquake-induced liquefaction and lateral spreading in the upland fill and wharf slope resulted in permanent wharf lateral deflections in excess of 600 mm (24 in), along with associated damage to concrete piling and pile-to-cap connections. This paper presents the post-earthquake repair and rehabilitation program for the wharf structure. The proposed rehabilitation strategy consisted of two phases: first, a structural assessment of the post-earthquake conditions with recommendations for short-term repairs and restrictions on operating criteria, followed by a structural retrofit program designed to stiffen the existing structure and provide a new lateral-force resisting system. An innovative approach to the seismic retrofit was used, which incorporates a combination of new plumb piles behind the wharf with ground improvement to ensure ample lateral strength and ductility capacity of the structure. The wharf retrofit also included a new apron structure in front of the wharf, designed to improve the local stability of existing slender piling (impacted by P-delta effects), with the added benefit of providing support for future crane rail installation and increased dredge depth. Finally, a 200-meter (656-ft) finger pier extension was included in the program, bringing the structurally retrofitted 4-berth system to a total combined 800 meters in length, designed to the most current seismic design standards.