Meri Ganic
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Meri Ganic has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Aleksandar Ganić
Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia
1 shared publication - Aleksandar Milutinović
Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia
1 shared publication - Rade Tokalić
Faculty of Mining and Geology, University of Belgrade, Djusina 7, 11180 Belgrade, Serbia
1 shared publication - Thamer Rayes Diyab
University of Babylon, Iraq
1 shared publication
Latest Publications
- Open Access
- 1 September 2015
- Published by FapUNIFESP (SciELO) in Rem: Revista Escola de Minas
- Vol. 68 (3) , 323-330
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.
- 1 September 2015
- Published by FapUNIFESP (SciELO) in Rem: Revista Escola de Minas
- Vol. 68 (3) , 323-330
Open AccessMine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.