MGMartha E. Gross

Martha E. Gross

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Martha E. Gross has a total of 1 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Configurational Comparative Methods for Aligning PPP Strategies with Public-Policy Objectives

    by Martha E. Gross, Michael J. Garvin

    Although public-interest ideals, such as transparency and efficient risk allocation, are widely recognized as crucial to well-structured public-private partnership (PPP) contracts, successful PPPs must also satisfy the public-policy objectives intended by the owner. Despite the pivotal role of toll-rate and concession-length options in shaping PPP agreements, relatively little research has addressed which of these contract strategies contribute most effectively toward achieving specific public-policy outcomes, such as managing congestion or limiting private-sector "super-profits." Various research methods are considered for investigating this topic. Acknowledging the limitations of traditional quantitative and qualitative approaches, this study proposes the use of configurational comparative methods (CCM). This family of recently-developed approaches is classified partway between quantitative and qualitative methods, enabling smaller sample sizes but retaining rigor and replicability. An example of CCM's application is presented, illustrating how this method can assist public-sector decision-makers in identifying PPP toll-rate and concession-length strategies which contribute toward achieving specific public-policy objectives.


  • Approaches for Structuring Concession Lengths and Toll Rates for Transportation Infrastructure PPPs

    by Martha E. Gross, Michael J. Garvin

    Many US transportation public-private partnerships (PPPs) are based on the concession model, under which the structure of user fees and the agreement duration is central to ensuring a fair balance of risk and reward between the public and private participants. Yet previous studies of toll-rate structuring and concession-length determination have treated these two variables largely independently. Toll charges, for instance, are typically established as either supply-based, linked to the cost of constructing, maintaining, and/or operating the facility; or demand-based, adjusted to influence driver behavior in certain ways such as through variable time-of-day congestion charges. Concession lengths are designed separately to enable tax-depreciation advantages for the private sector and/or to mitigate traffic-demand risk. Considering these two variables together, though, provides new opportunities to improve the risk-and-reward profile for both partners. A review and comparative analysis of dual-variable approaches, illustrated by projects in which these strategies have been used, offers additional tools to consider in structuring future PPP procurements.